Type of Application
(Tick One Box)
Production Permit
Period or All deliveries from October 22, 2010 to May Originator Signature:
28, 2021
Quantity to be
covered
Item subject to Previous Concessions/Permits:
EASA Form 1 NO N/A
Release?
Reason for application, giving details of deviation from specification or drawing
Reason for application:
The BMS13-48 product is failing to meet the Wet Arc Track testing required in BMS 13-48 Section
5.5.1.2, Section (a), Clause 4. Any shipments of the product covered under this SNN would be under
the understanding that such product potentially may not meet Wet Arc Track Testing.
Use of Material:
TE has received confirmation from Boeing on the following programs: 737, 747, 767F, 767-2C (Tanker), 777X
and 787. All wire segments "Use-As-Is." 777-200, 777-300ER and 777F– All wire segments which as entirely
contained within the pressure vessel – "Use-As-Is.
By signing this concession/waiver, your Company and yourself have reviewed this information and agreed to
TE continuing to supply the Products waiving the requirement for BMS13-48 wet arc-resistance section 3.4.33.
Dear Customer- Please send the signed waiver back. Please copy your TE Connectivity
sales representative. Thank You
TE Connectivity is giving you an update of a potential nonconformance for a wet arc testing failure
on the BMS13-48 product line.
We tested 1 sample and it passed at 91% but we had 4 wires in one bundle fail and the spec only
allows 3 wires max to fail.
Description of Non-conformity
After moving our wet arc test equipment to a new lab in Fremont, CA, TE conducted validation
testing on BMS 13-48, Type 10, Class 1, 20 AWG wire.
A failure for Wet Arc Resistance testing was recorded against BMS 13-48 Section 5.5.1.2, Section
(a), Clause 4.
BMS 13-48, Section 5.5.1.2, Section (a), Clause 4 lists three acceptance criteria for Wet Arc
Resistance testing:
• A minimum of 67 wires pass the Wet Dielectric Withstand Voltage Test
o The wire tested passed this requirement: 68 / 75 passing
• Three wires or fewer fail the Wet Dielectric Withstand Voltage Test in any one test bundle
o The wire tested failed this requirement: One bundle had 4 wires fail
• The damage to the wire is not more than 3 inches in any test bundle.
o The wire tested passed this requirement: Max. damage in any wire: 0.96 in.
TE Connectivity Corporation,
a TE Connectivity Ltd. company.
te.com
• TE has placed all product in WIP, finished goods and product in our warehouses on ship
hold and is conducting a root cause analysis.
• Once TE’s root cause analysis is completed, TE will provide it along with any proposed
corrective actions to Boeing.
Disposition of Nonconformity
Sincerely,
Michael Annino
Senior Global Quality Manager
te.com
Supplier
Nonconformance
Process Guide for
Concessions
Content Owner: Eric Escarez, Peter Klemm, Ellen Pendergrass, Bryant Meyer
Purpose
• This Playbook identifies the triggers for supplier nonconformance submittals and
provides instruction on how to submit a Supplier Nonconformance, tips for
avoiding route backs and refusals, responding to requests for corrections and/or
additional information, obtaining a nonconformance disposition and
determining “okay to ship” status.
• This Playbook also provides instruction on the reconvene process.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 2
Supplier Quality Playbooks – Supplier Nonconformance
Audience/Applicability
• This Playbook is intended for use by Boeing Approved Suppliers
• Boeing Supply Chain personnel may also use the contents of this Playbook to
assist suppliers with the supplier nonconformance process
Note: Supplier personnel should refer to Appendix B for access to Boeing forms
and documents.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 3
Supplier Quality Playbooks – Supplier Nonconformance
Distribution Limit
• Boeing approved suppliers with a valid PIA in place
• Boeing personnel
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 4
Supplier Quality Playbooks – Supplier Nonconformance
Table of Contents
• Purpose • Stage 2: Submission (continued)
• Initiation in SQIS
• Audience/Applicability • Material Review – Accessing User
• Distribution Limit Guide
• BFM and BFE
• High Level Process Flow • SQIS Outage Process
• Supplier Nonconformance Process • Initiating EPD in Velocity for OSSN &
• Overview Process Rejection
• Process Stages • 737, 747, 767, 777 & Fabrication
Process Rejection
• Stage 1: Non-Conformance Detection
• Examples of When a Submittal is Required • Stage 3: Boeing Material Review Board
• Examples of When a Submittal is Not Process
Required • Typical Route Back/Refusal Reasons
• Discrepancy Description Examples
• Stage 2: Submission • Responding to a Request for
• Nonconformance Types Information – Non-787
• Submission Matrix for New • Responding to a Request for
Nonconformance Information – 787
• Record of Collaborative Agreement for 787 • Expedited Review
Table of Contents
• Stage 4: Accessing Disposition • Appendix A – Velocity Examples
• Record Submitted through MR Module • EPD Overview – Top (Header) Level
• 787 Program - Rev B and Beyond View
• 737, 747, 767 , 777 Programs and • Stages Overview
Fabrication – Rev 1 and Beyond • Typical AN Stages
• Typical ON Stages
• Stage 5: Execution of Disposition • Typical OSSN Stages
• Initiation Matrix for Revised • Revising an EPD
Nonconformance
• Submission of X30155-1 Form • Appendix B – Accessing Boeing Documents
from Supplier Portal
• Reconvene Process • Forms
• Acronyms • D-Documents
• Boeing Contacts
• References
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 6
Supplier Quality Playbooks – Supplier Nonconformance
• A product Nonconformance is
identified at supplier facility and
requires Boeing MRB disposition
• Supplier submits through SQIS MR
Supplier Module which generates a Velocity or
CMES record
NC Completion NC Generation
• NC team reviews in Velocity or CMES.
Routes to LE if complete or notifies
supplier if incomplete or further
clarification is required
• LE provides disposition and Okay to
NC Team NC Team Ship when applicable
• NC team reviews LE disposition and
LE completes record approval stage
• Supplier is notified of disposition
through SQIS MR Module
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 7
Supplier Quality Playbooks – Supplier Nonconformance
Process Stages
1. 3. Boeing Material
4. Access 5. Execution of
Nonconformance 2. Submission Review Board
Disposition Disposition
Detection Process
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 8
Supplier Quality Playbooks – Supplier Nonconformance
For situations like these, you cannot use the SN process; you must use a different process.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 10
Supplier Quality Playbooks – Supplier Nonconformance
Stage 2: Submission
Nonconformance Types
Open Nonconformance (ON) 787 Open Ship Short Nonconformance
(OSSN)
Nonconformance record initiated by the supplier
and submitted to Boeing for the authorization to Nonconformance record initiated by the supplier
ship nonconforming products/materials to Boeing and submitted to Boeing for the authorization to
or from one supplier to another supplier. ship end items that are missing components or
incomplete statement of work (SOW).
Note: For Premier Programs (737, 747,767 and
Advanced Nonconformance (AN) 777) missing components or incomplete SOW is
Used to request MRB disposition when supplier submitted via Form X33348 per D6-83721.
does not have delegated MRB authority or the
condition exceeds the scope of a suppliers
delegated MRB authority. The MRB disposition is Process Rejection
applied by The Boeing Company and the supplier
A BAC-driven process nonconformance generated
will accomplish the work in advance of shipping
from a failure in an autoclave, heat treat, or curing
the product.
oven, chemical processing load in a tank-line or
equivalent.
Once you have determined the nonconformance type, use the
following matrix to determine the nonconformance submittal path
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 11
Supplier Quality Playbooks – Supplier Nonconformance
Stage 2: Submission
Submission Matrix for New Nonconformance
* Reference next slide for RCA information Note: Click here for SQIS outage process
** Applies to some 787 Standards .
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 12
Supplier Quality Playbooks – Supplier Nonconformance
Stage 2: Submission
Record of Collaborative Agreement (RCA) for 787
What is it?
An RCA is a document that assures coordination occurs
between the site/supplier that is shipping the ON or OSSN and
Non ICS Suppliers
the site/supplier that is receiving the nonconformance.
Form X36703
When is it Used?
All 787 Program ON’s and OSSN’s require the completion of an
RCA.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 14
Supplier Quality Playbooks – Supplier Quality Information System
3 2
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 15
Supplier Quality Playbooks – Supplier Nonconformance
BFM SNN’s that are being submitted for an RTS or Scrap disposition require
specific information that is not noted in the current MR User Guide. BFE SNN’s
differ only slightly from the User Guide. The steps on this and the next slides
will cover the BFM and BFE deviations.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 16
Supplier Quality Playbooks – Supplier Nonconformance
Stage 2: Submission
SQIS Outage Process
• In the event that the MR Module in SQIS is down or unavailable, complete an X30155 form
and submit it to:
• Fabrication Divisions:
Outage forms are to be sent and
processed in conjunction with each
logistical company’s responsible SCA.
• 787 Program:
Submit directly in Velocity in lieu of
X30155 form
Note: The X30155 form may be used only when the MR module is inaccessible. It is not
to be used if an MR fails in submission in SQIS.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 19
Supplier Quality Playbooks – Supplier Nonconformance
Stage 2: Submission
Initiating EPD in Velocity for OSSN & Process Rejection
1
2
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 20
Supplier Quality Playbooks – Supplier Nonconformance
Stage 2: Submission
Initiating EPD in Velocity for OSSN & Process Rejection
5 5 Enter Boeing PO, PO Position and Corrective
Action
Note: For Process rejections include a list of
affected PO/PO positions as an attachment
6 Enter Program Assignment and
ECCN
7 Click on Submit
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 21
Supplier Quality Playbooks – Supplier Nonconformance
Stage 2: Submission
737, 747, 767, 777 and Fabrication Process Rejection
• Process rejections for the 737, 747,
767 and 777 Programs are submitted
on form X30155-2.
Fabrication Divisions
Forms are to be sent and processed in
conjunction with each logistical
company’s responsible SCA.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 22
Supplier Quality Playbooks – Supplier Nonconformance
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 23
Supplier Quality Playbooks – Supplier Nonconformance
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 26
Supplier Quality Playbooks – Supplier Nonconformance
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 27
Supplier Quality Playbooks – Supplier Nonconformance
Fabrication Divisions
Requests are processed in conjunction
with each logistical company’s
responsible SCA.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 32
Supplier Quality Playbooks – Supplier Nonconformance
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 33
Supplier Quality Playbooks – Supplier Nonconformance
*The SQIS MR Module is only used for the first submittal of a new nonconformance. All
revisions and reconvenes (Rev B and beyond for 787, Rev 1 and beyond for 737, 747, 767
and 777) are submitted as noted on the matrix above.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 34
Supplier Quality Playbooks – Supplier Nonconformance
787 Program
Initiate a Revision in Velocity. Step-by- X30155-1 Form
step instructions are depicted in
Appendix A.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 35
Supplier Quality Playbooks – Supplier Nonconformance
Reconvene Process
• On occasion the Boeing MRB Disposition will request that certain actions be performed
and then to “reconvene” once those actions are complete. The process for reconvene is
dependent upon the Airplane Program as noted below.
Fabrication
Complete form X30155-1, “Supplier
Nonconformance Notification – Revision /
Reconvene / Additional Info” and to the
logistical company’s responsible SCA.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 36
Supplier Quality Playbooks – Supplier Nonconformance
Acronyms
• AN Advanced Nonconformance • NC Nonconformance
• ARM Assembly Requirements Model • ON Open Nonconformance
• BCA Boeing Commercial Airplanes • OSSN Open Ship Short Notification
• BDS Boeing Defense and Space • PA Purchase Agent
• BFE Buyer Furnished Equipment • PO Purchase Order
• BFM Boeing Furnished Material • QMS Quality Management System
• CARM Components Assembly Requirements • RCA Record of Collaborative Agreement
Model • RTS Return to Supplier
• CMES Common Manufacturing Execution • SCA Supply Chain Analyst
System • SN Supplier Nonconformance
• EAR Export Administration Regulations • SNN Supplier Notification of Nonconformance
• ECCN Export Control Classification Number • SOW Statement of Work
• EPD Emergent Process Document • SQIS Supplier Quality Information System
• GD&T Geometric Dimensioning and Tolerancing • WHID Wire Harness Installation Document
• ICS Integrated Control Station
• IRM Installation Requirements Model
• ITAR International Traffic in Arms Regulations
• LE Liaison Engineering
• MR Material Review- module in SQIS
• MRB Material Review Board
• MRR Material Review Request
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 37
Supplier Quality Playbooks – Supplier Nonconformance
Boeing Contacts
Programs
• Peter Klemm +1(425) 237-7828 peter.r.klemm@boeing.com
• Eric Escarez +1(206) 240-1565 eric.m.escarez@boeing.com
Fabrication
• Ellen Pendergrass +1(253) 653-3635 ellen.pendergrass@boeing.com
• Bryant Meyer +1(253) 486-8557 bryant.e.meyer@boeing.com
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 38
Supplier Quality Playbooks – Supplier Nonconformance
References
Documents
• D6-82479, “Boeing Quality Management System Requirements for Suppliers”
• D6-83721, “Configuration Definition Requirements and Purchased Article Configuration Traveler”
• D6-84111,“Quality Assurance Requirements”
• D012Z045-01, Collaborative Problem Resolution for 787 Supply Chain Exceptions: Partner Roles and
Responsibilities
• D012Z026-01, “787 Partners/Suppliers” Process Responsibilities for Nonconformances and Corrective Action”
• D012Z028-01, “787 Process for End Item Shipments with Incomplete Statement of Work”
• D-13709-4, Requirements for Obtaining Materials Review Board Authority by Boeing Suppliers
• D-13709-5, Material Review Requirements for Boeing Commercial Airplanes Suppliers with Design Responsibility
Forms
• X30155, Supplier Nonconformance Notification
• X30155-1, Supplier Nonconformance Notification – Revision / Reconvene / Additional Info
• X30155-2, Supplier Nonconformance Notification – Process Rejection
• X33348, Shortage ? Overage Approval Memo
• X34587, Record of Collaborative Agreement for an Incomplete Statement of Work
• X36703, Record of Collaborative Agreement
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 39
Supplier Quality Playbooks – Supplier Nonconformance
Appendix A - Velocity
EPD Overview – Top (Header) Level View
1
2
4 3
Appendix A - Velocity
EPD Overview – Top (Header) Level View
• The tool bar that is pinned to the left side From here you can start a revision or view history
of the Velocity EPD can be used to quickly (does not take you to a section of the EPD)
navigate to different sections of the EPD.
Information Section
• The tool bar is tied directly to the page that
is the current view. EPD Details (discrepancy text, Engineering dispo)
• Each page/stage will have a different tool Disposition Plans
bar and will only show items that are
applicable to the stage currently in view. Process notes (does not take you to an EPD section)
• The icons on the tool bar match the icons Documents (attachments)
on the section they are connected to. EPDs (used if there are related, i.e. C&C’s, etc)
• Not all sections can be viewed by a supplier
ECCN Numbers
Programs
Disposition Plans
Line #’s
Coding
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 41
*Details on next slide
Supplier Quality Playbooks – Supplier Nonconformance
Appendix A - Velocity
Stages Overview
• Velocity EPD’s are processed in stages. The
progress of the record can be followed by
determining which stage the EPD is
currently in.
• Stages are indicated in two places on the
EPD, across the top and in the Stages block.
• Stages (tabs) located at the top of the
window are color coded to quickly identify
status
• Grey – Stage is Complete
• Red – EPD has been routed back from
that stage to a previous stage
• To quickly navigate to the Stages field, click
• Blue – Indicates stage open and ready on the Stages icon located in the tool
to be worked bar at the left of the screen
• Green – Indicates stage is in work
• Reference follow-on slides for more details
• Suppliers may not be able to view all stages and examples
and will only be able to make changes when
they have the EPD in-work in the NC
Initiation stage
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 42
Supplier Quality Playbooks – Supplier Nonconformance
Appendix A - Velocity
Typical AN Stages
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 43
Supplier Quality Playbooks – Supplier Nonconformance
Appendix A - Velocity
Typical ON Stages
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 44
Supplier Quality Playbooks – Supplier Nonconformance
Appendix A - Velocity
Typical OSSN Stages
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 45
Supplier Quality Playbooks – Supplier Nonconformance
Appendix A - Velocity
Revising an EPD
1
2
The steps above will open a revision to the EPD with many of the fields auto-populated.
Assure all information is correct prior to completing and routing it forward to NC Validation.
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 46
Supplier Quality Playbooks – Supplier Nonconformance
Appendix B
Accessing Boeing Documents from the Supplier Portal
1 https://portal.exostar.com/idprov/pages/home/dashboard.faces
3 1 Access Exostar
3 Click Login
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 47
Supplier Quality Playbooks – Supplier Nonconformance
Appendix B
Accessing Boeing Documents from the Supplier Portal
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 48
Supplier Quality Playbooks – Supplier Nonconformance
Appendix B
Accessing Boeing Documents from the Supplier Portal
Forms
1 Scroll to bottom of
screen and click on
Boeing Forms
The pop-up will display
all forms that supplier
has been granted access
1
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 49
Supplier Quality Playbooks – Supplier Nonconformance
Appendix B
Accessing Boeing Documents from the Supplier Portal
D-Documents
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 50
Supplier Quality Playbooks – Supplier Nonconformance
Appendix B
Accessing Boeing Documents from the Supplier Portal
D-Documents
3 Choose Supplier codes as
applicable
4 Enter document number 3
5 5
5
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 51
Supplier Quality Playbooks – Supplier Nonconformance
Appendix B
Accessing Boeing Documents from the Supplier Portal
D-Documents
6 Click on
document to
open
.
Copyright © 2018 Boeing. All rights reserved. BOEING PROPRIETARY 52