You are on page 1of 17

List MH for Piling Work

No. Description Nos of Drive No. of Pile Point Total


1 MH 2 4 4 16
2 MH 3 4 4 16
3 MH 4 4 4 16
4 MH 6 4 4 16
5 MH 9 4 4 16
6 MH 14 4 4 16
7 MH 17 4 4 16
8 MH 18 4 4 16
9 MH 20 4 4 16
10 MH 23 4 4 16
11 MH 25 4 4 16
12 MH 28 4 4 16
13 MH 32 4 4 16
14 MH 33 4 4 16
15 MH 34 4 4 16
16 MH 35 4 4 16
17 MH 36 4 4 16
18 MH 38 4 4 16
19 MH 47 4 4 16
20 MH 49 4 4 16
21 MH 50 4 4 16
22 MH 52 4 4 16
23 MH 55 4 4 16
24 MH 57 4 4 16
25 MH 65 4 4 16
26 MH 67 4 4 16
27 MH 68 4 4 16
28 MH 68a 4 4 16
29 MH 70 4 4 16
30 MH 71 4 4 16
31 MH 71A 4 4 16
32 MH 74 4 4 16
33 MH 77 4 4 16
34 MH 79 4 4 16
35 MH 82 4 4 16
36 MH 84A 4 4 16
37 MH 87 4 4 16
38 MH 88 4 4 16
39 MH 89 4 4 16
40 MH 95 4 4 16
41 MH 95A 4 4 16
42 MH 100 4 4 16
43 MH 101 4 4 16
44 MH 103 4 4 16
45 MH 105 4 4 16
46 MH 106 4 4 16
Total 736

List MH for Piling Work


No. Description Nos of Drive No. of Pile Point Total
47 MH 108 4 4 16
48 MH 108A 4 4 16
49 MH 112 4 4 16
50 MH 114 4 4 16
51 MH 116 4 4 16
52 MH 116A 4 4 16
53 MH 116B 4 4 16
54 MH 116C 4 4 16
55 MH 116D 4 4 16
56 MH 116E 4 4 16
57 MH 117 4 4 16
58 MH 119 4 4 16
59 MH 121 4 4 16
60 MH 124 4 4 16
61 MH 126 4 4 16
62 MH 127 4 4 16
63 MH 130 4 4 16
64 MH 135 4 4 16
65 MH 135A 4 4 16
66 MH 135B 4 4 16
67 MH 136 4 4 16
68 MH 137 4 4 16
69 MH 138 4 2 8
70 MH 139 4 4 16
71 MH 140 4 2 8
72 MH 141 4 4 16
73 MH 142 4 2 8
74 MH 143 4 4 16
75 MH 144 4 2 8
76 MH 145 4 4 16
77 MH 150 4 4 16
78 MH 150A 4 4 16
79 MH 150B 4 4 16
80 MH 150C 4 4 16
81 MH 151 4 4 16
82 MH 152 4 2 8
83 MH 153 4 4 16
84 MH 154 4 2 8
85 MH 155 4 2 8
86 MH VALVE CHAMBER 4 4 16
Total 584

List MH for Piling Work


No. Summary Amount

page 1 of 2 736

page 2 of 2 584
Total 1320
No. List MH on Site 23 : Belum siap
1 MH 2
2 MH 3
3 MH 4
4 MH 6
5 MH 9
6 MH 14
7 MH 17
8 MH 18
9 MH 20
10 MH 23
11 MH 25
12 MH 28
13 MH 32
14 MH 33
15 MH 34
16 MH 35
17 MH 36
18 MH 38
19 MH 47
20 MH 49
21 MH 50
22 MH 52
23 MH 55
24 MH 57
25 MH 65
26 MH 67
27 MH 68
28 MH 68a
29 MH 70
30 MH 71
31 MH 71A
32 MH 74
33 MH 77
34 MH 79
35 MH 82
36 MH 84A
37 MH 87
38 MH 88
39 MH 89
40 MH 95
41 MH 95A
42 MH 100
43 MH 101
44 MH 103
45 MH 105
Total

No. List MH on Site 23 : Belum siap


46 MH 106
47 MH 108
48 MH 108A
49 MH 112
50 MH 114
51 MH 116
52 MH 116A
53 MH 116B
54 MH 116C
55 MH 116E
56 MH 117
57 MH 119
58 MH 121
59 MH 124
60 MH 126
61 MH 127
62 MH 130
63 MH 134
64 MH 135
65 MH 135A
66 MH 135B
67 MH 136
68 MH 137
69 MH 138
70 MH 139
71 MH 140
72 MH 141
73 MH 142
74 MH 143
75 MH 144
76 MH 145
77 MH 150
78 MH 150A
79 MH 150B
80 MH 150C
81 MH 151
82 MH 152
83 MH 153
84 MH 154
85 MH 155
86 MH VALVE CHAMBER
Total
No. List IC on Site 70 : Belum siap
1 IC 5C
2 IC 7C
3 IC 8C
4 IC 10C
5 IC 11C
6 IC 13C
7 IC 15C
8 IC 16C
9 IC 19C
10 IC 21C
11 IC 24C
12 IC 26C
13 IC 29C
14 IC 30C
15 IC
16 IC 37C
17 IC 39C
18 IC 42C
19 IC 45C
20 IC 46C
21 IC 48C
22 IC 51C
23 IC
24 IC 53C
25 IC 56C
26 IC 58C
27 IC 60C
28 IC 62C
29 IC
30 IC
31 IC 69C
32 IC 69C
33 IC 69C
34 IC 70AC
35 IC
36 IC 80C
37 IC 81C
38 IC
39 IC 85C
40 IC 86C
41 IC
42 IC
No. List IC on Site 70 : Belum siap
43 IC 92C
44 IC
45 IC
46 IC
47 IC
48 IC
49 IC
50 IC
51 IC
52 IC 116BC
53 IC 116CC
54 IC 116DC
55 IC 116EC
56 IC 118C
57 IC 120C
58 IC
59 IC
60 IC 131C
61 IC
62 IC 135AC2
63 IC 137C
64 IC 139AC
65 IC 139AC3
66 IC 139AC4
67 IC 139AC5
68 IC 150AC1
69 IC 150BC1
70 IC 150CC1
71 IC 150CC2
Total Pipe Length Politeknik Sultan Idris Shah 1855.46 : Belum Siap
Total 1st 2nd 3rd Finish
No. Description Length Length
(m) Subcon
(m)

AREA A
1 MH 28 - MH 2 34 18 24 42
2 MH 20 - MH 28 41.7 18 18 6 42
3 MH 18 - MH 20 61 64 64
4 IC 21C - MH 18 20
5 MH 34 - MH 18 68.4 68 68
6 MH 33 - MH 34 13
7 IC 33C - MH 33 15
8 MH 32 - MH 33 65.6 30 35 65
9 IC 29C - MH 32 A4 15 15 15
10 IC 19C - IC 29C A4 27 27 27
11 MH 3 - MH 2 27.1 27.1 27.1
12 MH 14 - MH 3 40 40 40
13 MH 17 - MH 14 18.1 18.1 18.1
14 MH 23 - MH 17 16.9 16.9 16.9
15 IC 24C - MH 23 A3 15 15 15
16 IC 30C - IC 24C A3 27 27 27
17 MH 25 - MH 23 35.8
18 IC 26C - MH 25 11.7
19 MH 9 - MH 3 16.2 16.2 16.2
20 IC 10C - MH 9 A1 15 15 15
21 IC 16C - IC 10C A1 27 27 27
22 IC 11C - MH 9 35.5
23 IC 13C - IC 11C 36.5
24 MH 4 - MH 3 22.5 22.5 22.5
25 IC 5C - MH 4 A2 15 15 15
26 IC 15C - IC 5C A2 27 27 27
27 MH 6 - MH 4 36.8 36.8 36.8
28 IC 7C - MH 6 13.2
29 IC 8C - IC 7C 22

AREA B
30 MH 35 - MH 34 (RE-LEVELLING MH38) 92.7 92.7 92.7
31 MH 38 - MH 35 26 24 24
32 MH 36 - MH 38 16.8
33 MH 47 - MH 35 68 66 66
34 MH 52 - MH 47 33 33 33
35 IC 53C - MH 52 6.1
36 IC 40C - MH 52 12
37 MH 50 - MH 52 38 38

Total 1111.6 880.30


Total Pipe Length Politeknik Sultan Idris Shah 1855.46 : Belum Siap
Length
Length Subcon
No. Description
(m) (m)

AREA B
38 IC 48C - MH 50 B2 24 24 24
39 IC 37C - IC 48C B2 27 27 27
40 IC 51C - MH 50 B4 15 15 15
41 IC 62C - IC 51C B4 27 27 27
42 MH 49 - MH 50 23 23 23
43 MH 55 - MH 49 16 16 16
44 IC 46C - MH 55 B1 15 15 15
45 IC 42C - IC 46C B1 18 18 18
46 IC 56C - MH 55 B3 15 15 15
47 IC 60C - IC 56C B3 27 27 27
48 MH 57 - MH 55 42
49 IC 45C - MH 55 13
50 IC 58C - MH 55 11.4
51 IC 39C - MH 38 5

AREA C
52 Existing IC - MH 135 9.3
53 MH 135A - MH 135 58.5
54 IC 135AC2 - MH 135A 4
55 MH 135B - MH 135A 28.2
56 IC 139AC5 - MH 135B 12.6
57 IC 139AC4 - IC 139AC5 20.4
58 MH 136 - MH 135 29.2
59 MH 137 - MH 136 15.2 15 15
60 MH 138 - MH 137 14.9
61 IC 137C - MH 137 24.96
62 MH 139 - MH 137 29.9 30 30
63 MH 140 - MH 139 15.4 18 18
64 IC 139ACC - MH 140 24.3 25 25
65 IC 139AC3 - IC 139ACC 10.3
66 MH 141 - MH 139 17.7
67 MH 142 - MH 141 17.2 23 23
68 MH 143 - MH 141 23.4 23 23
69 MH 144 - MH 143 20.8 23 23
70 MH 145 - MH 143 36.6 36 36
71 MH 150 - MH 145 16.9 9 9
72 MH 150A - MH 150 31
73 IC 150AC1 - MH 150A 17.2
74 MH 150B - MH 150A 26.8
75 IC 150BC1 - MH 150B 10.6
Total 793.76 409.00

Total Pipe Length Politeknik Sultan Idris Shah 1855.46 : Belum Siap
Length
Length Subcon
No. Description (m)
(m)

AREA C
76 MH 150C - MH 150B 38.5
77 IC 150CC2 - MH 150C 13 16 16
78 IC 150CC1 - MH 150C 25.2 29 29
79 MH 151 - MH 150 9.3
80 MH 152 - MH 151 16 37 37
81 MH 153 - MH 151 22.9
82 MH 154 - MH 153 15.3 15 15
IC 153CC - MH 153 17
83 MH 155 - MH 153 24.7 24 24

AREA D
84 MH 70 - VALVE CHAMBER 45.1
85 MH 68A - MH 70 29.7
86 IC 70AC - MH 68A (tukar laluan) 27
87 MH 68 - MH 68A 27.7
88 MH 67 - MH 68 15.8 17 17
89 MH 65 - MH 67 51.5 51 51
90 E XISTING - MH 68 15.8
91 MH 71 - MH 70 41.7
92 MH 71A - MH 71 22.8
93 E XISTING - MH 71A 12.7
94 IC 171CC - MH 71 (tukar no IC) 40.4
95 MH 74 - MH 71 82
96 MH 77 - MH 74 25.4 38 38
97 IC - MH 74 13.9
98 IC 77C - MH 77 7.8 9 9
99 MH 79 - MH 77 44.4 48 48
100 IC 80C - MH 79 9.5 9 9
101 IC 81C - MH 79 9.4 9 9
102 MH 82 - MH 74 84.4 36 36 72
103 MH 84A - MH 82 33.9 34 34
104 IC 84C - MH 82 12.8
105 E XISTING - MH 84A 7.8
106 MH 87 - MH 84A 35.7 18 21 39
107 IC 85C - MH 87 9.1 8 8
108 IC 86C - MH 87 5.5 4 4
109 MH 88 - MH 82 84.2 48 35 83
110 MH 89 - MH 88 34 33.3 33.3
111 IC 89CC2 - MH 89 6.2 6 6
112 IC 89CC1 - MH 89 7

Total 1025.1 581.30

Total Pipe Length Politeknik Sultan Idris Shah 1855.46 : Belum Siap
Length
Length Subcon
No. Description
(m) (m)

AREA D
113 IC 92C - MH 89 41.6 41 41
114 MH 95 - VALVE CHAMBER 25.5
115 MH 95A - MH 95 21.8
116 IC - MH 95A 27.8
117 MH 100A - MH 95A 26.2
118 MH 100 - MH 100A 60
119 MH 101 - MH 100 34.3
120 MH 103 - MH 101 69.4 30 24 15 69
121 MH 105 - MH 103 56.7 30 24 54
122 IC 105CC - MH 105 12.4 15 15
123 MH 106 - MH 105 75.4
124 IC - MH 106 23.1
125 MH 108 - MH 106 24.9 24 24
126 IC - MH 108 22.9 10.5 10.5
127 MH 108A - MH 108 35.6 39 39
128 IC - MH 108A 21
129 MH 112 - MH 105 51 30 30 60
130 IC 112CC - MH 112 11.1
131 MH 114 - MH 112 30 35 35
132 IC 114CC - MH 114 13.8 15 15
133 MH 116 - MH 114 15.1 14 14
134 IC 116CC1 - MH 116 23.1
135 MH 117 - MH 116 42.7 12 32 44
136 MH 121 - MH 117 28.6 28 28
137 IC - MH 121 20.4 20 20
138 MH 119 - MH 117 24.9 23 23
139 IC 118C - MH 119 10.7 10.5 10.5
140 IC 120C - MH 119 22.5 22.5 22.5
141 MH 116A - MH 116 (Ubah location) 14.8
142 MH 116B - MH 116A 94.2
143 IC 116BC - MH 116B 36.9
144 MH 116C - MH 116B 47.7
145 IC 116CC - MH 116C 18.7 21 21
146 MH 116B - MH 116C 64.3
147 IC 116DC - MH 116B 24.2
148 MH 116E - MH 116B 33
149 IC 116EC - MH 116E 17.9
150 IC 69C - MH 68 6.2
151 IC 70AC - MH 70 27
152 MH 124 - MH 101 43.4

Total 1300.8 545.50

Total Pipe Length Politeknik Sultan Idris Shah 1855.46 : Belum Siap
Length
Length Subcon
No. Description
(m) (m)

AREA D
153 IC 125C - MH 124 12.2
154 MH 126 - MH 124 30.6 39 39
155 IC 129C - MH 126 11 16 16
156 MH 130 - MH 126 47.3 48 48
157 MH 127 - MH 126 23.1 18 18
158 IC 131C - MH 130 8
159 MH 135 - MH 130 29.1
Total 161.3 121

Total Pipe Length Politeknik Sultan Idris Shah 1855.46 : Belum Siap
Length
Length Subcon
No. Summary
(m) (m)

Page 1 of 5 1111.6 880.3

Page 2 of 5 793.76 409

Page 3 of 5 1025.1 581.3

Page 4 of 5 1300.8 545.5

Page 5 of 5 161.3 121


4392.6 2537.1