You are on page 1of 63
PBA Perbedanan Bokolan Air Pulau Pinang Sdn. Bhd vars) GUIDELINES ON SUBMISSION OF PLUMBING PLANS PUBLISHED IN 2008 RM30,00 CONTENTS page SECTION ONE: REQUIREMENT ON SUBMISSION OF PLANS A. GENERAL 1 PLANS AND SCALE. la © CoLouR SCHEME D. MAINS LAVING REQUIREMENTS, 35 5, PLUMBING INSTALLATION REQUIREMENTS 36 F COVERED FLOOR AREAS “ SECTION TWO : REQUIREMENTS FOR WATER FITTINGS A METERS 6 pes: 18 © STORAGETANKS 9 D._INTERNALPLUNBING » RTFRNAL RETICULATION MAINS w HOT WATER SYSTEM 0 PUMPING SYSTEM toat 1H. MANDATORY INFORMATION REQUIRED IN ie, PLUMBING DRAWING BMISSION PLANS SECTION ONE : REQUIREMENTS ON SUBMISSION OF PLANS. A 1 ig engineer must be registered with Peroaanon Bekalon Ais |APP). Ail plans must be enderaed with consulting engines Pulau Pang Fegisuaton 2 The ‘Nott’ dicsion shall be indicted on the key an sie plans 3. The name, now identity card number, signatare and sets ofthe land and bing ‘over shal te provide. In cases of tuanhpie, should spoetywhethor tis Left ig Hand 4. The top right hand corner on the approval stamp (12Saan x 12Sunn) shall be left empiy for PBAPP to chop the 5. All plans shall be folded such thatthe top right hand corner, which is provided for PBAPP approval stamp, is exposed to fata stamping 5. Thoconsating engineer must erty are be cated out under his supervision, ton the plans that all pausing works 7. Proposed buildings for housing schemes to he provide with plot or uit mamber 8. Inplumbing drawings, when vo pipes meet but ae not interconnected, kink ist be incorporated 9. Any difference between approved plumbing plans ard guidelines, the guidelines will superode the ples. 10, To apply foc emporary workshed supply before commencement of work. To indicate tnd Tabet the hori poet and meter poston ofthe temporary wkhed sappy oa the te pla, 1. Allpipe dimensions sll be indicate in oxtsie diameter (OD) and in “ina” 12, Al storage nis orany kind of wak capacity sal be labelled in “tres” B PLANSAND SCALE. (2) Only one st of complete plumbing plans tobe submit intl for (6) All amendments, if any, MUST be done on original prints and ensure st amendments are dic, (0 Afterall requirements have been compli with, 4 complete ses of plans and {opis of site plan sal be subynted f appro. (@)_PBAPP wit tum sets of approved plans tothe consi engineer. ach complet sot of plans shal consist ofthe flowing: = (2) Rey plans wit sate 140.000 (©) Location plans wit scale |:2000 showing the location of project, te mane of the sad in he wcinity and any prominent andra, (©) Site plans - maximum scl to he between rns of 1:00 t0 11000 showing ‘xiting and proposed layeut of reticulation mais, lor nuiers, aden! Io ‘numbers, house adkesoes and uber prominent landmarks, (© Detaled plans of suitable sate shade tiling plans showing portions of ech ‘oor indicating the postions oF water pipes, tings and apphancs, (9) Anisomtis drawing f the ypical plumbing system, (9) Toul Length of proposed mins a sub-mains tobe provided on stein tabulated on Amended drawings must be resubaited together with a covering letter quoting the ‘arler PBAPP fl reforence number, approval datos it of amendments made, CoLouR SCHEME ‘Water mnie sub-nsins, ccmmmnicsion pies and lot bouncy (@) Fisting water sins, sub-ins and BLUE (©) Proposed water msin asd communication pipes - DARK RED (© Proposed subsnains LIGHT RED (© Lot boundary = PURPLE Disibutions pp: G)—_Frorn fed tank < DARK GREEN @)—Fremstorage tank Liar GREEN ©) Horwater system pipes BROWN (8) Overlew, sour an waning pipes -ORANGE (©) Pipes to beabandoned YELLOW (© Pasmping riser mai w wot sorage tanks =DARK RED (® —Sttion pipe GREEN 3 iting: (©) Suction and stocae tanks DARK RED, (©) Fes fom oo? serge tks DARK GREEN (©) Showersnd sine direct sippy -DARK RED D, MAINS LAYING REQUIREMENTS ‘The following notes shall be printed or writen onthe plans- 1. All pipes specials and itings shall be subjected othe approval of PBAPP. 2. Wator mis of nominal direter 100mm and shove shal ave a ini cover of 1.0 3. FocHIDPE pipes les han 100 diameter, laid across federal or sate roads, shall be Ind and sleeve it Galvanised Ton pipes Cas Cor equvalens 4. Foepipe les than 75mm, the mim cove to the pipes sal be 4Scrmm. The stopcock shall be installed on the te side ofthe PAAPP mains and hal ot encood «depth of 450mm 5. Laying of pipes and specials and inition of itings shuld be done ncording othe regulations and specificaoas of PBAPP. 6 AllSiuice Valves and Buttertly Valves mast be instlld ina valve chamber consncied ‘zeording to standatés ad requirements of PBAPP. 7. Ditetion of opening for Suice Volver and Buttery Valves shal bo follow: © Clockise opening for Pung Island (i) Antctockwise opening for Seberang Pers All Sluice Valve and Buterly Valves with seval numbers to be installed shall be provided with copies of test report and delivery orders 8. Thrastbocks frpoes shall be provide at all bends and ies. 9, All pipes mnning along the da sal bo Ia 1.25 metres away’ from the edge oF din 10, All PBAPP pipes shall be laid 1.25 metres away from any other utilities except ‘sovage pipes tobe lid apposite ofthe reed 20. or fire hydrant, which is installed after meter shall be of the short pillar type approved by Jabatn Bor Dan Peayelana For public hydrants and private hydtants, reference shal be made 10 Appendis St dS 1f more than 1 aumber of fire hyrenis is eoguired forthe piping network, the ‘minimum noasnal sis of mains shal be [S@am, “The following have 1 be carved out before the mains are handed over to PBAPP:= Presse est b—_Leakage est, s. Foamswrab SSterisation of mains “The outside dlametrs for differen pipe materials and sizes shall comply with PBAPP seifeations. Al proposed steam-crossing pipes above ground should be of Milé Steel pipe of ‘into nominal diameter of 18mm complete with ir valve Foe Mild Stel pipes, the ‘xterm surface shall ot be coated with bitmen and shal bo oated with cost of non- ‘salami aint, Scour pipes stl be lcied atthe et of pipeline erat lower grou ofthe development. Ae vlve shal be installed athe following leatons: fo) Where see opie peaks cbve the hyautc pada (©) High points slong th pipeline where aban hangs in saint ietion exis © Wherea scton of petne (na pre othe hy au grater. (has e ong horizon! mun withoat summit with air valves recommended C450 tee nals (li) -nas Tong ssconding or descending stretch without summit, wit ait ‘valves S00 mete tens Allbolis ni nats call be as fll Above ground ~bot dipped galvanize eon 4) Below ground Stainless Sts! All fine connections to be ected oat by pipe laying contractor with the flowing noses fo bo sured gE Cy ) © ‘Consulta! and developer shall be responsible for any road reinstatement were according to Majlis Postandacan Pulau Pinang ( Majlis Petbundavan Seberang Perl and Jab Kerja Raya eculemens, oat cut permit tobe applied by pipe lying contractor or developer. ‘Consultant shall inform) PBAPP tbat all fnsl eomsection works have besa Completed, road reinstated azeording to Majlis Perbandaren Pulau Pinang / Majlis Perbundsran Sebetang Perei aud Jabsian Kerja Raya requirements, ‘occupational cerifcare : exticate of itness issued by Majlis Perbandaran Polat Pinang / Majlis Perbandaran Seberang Perat and water supply ccommisscned here PRAPP can ake over the newly lid pipeline PLUMBING INSTALLATION REQUIREMENTS ‘The following notes al be printed or writen onthe plans = 2 9. 10, Location of meter posion sal eesply with PRAPP requtemerts All indivial meter postin for indian! or nowsing Scheme shall be located intron ‘ed ouside fencing with reinforced concrete sib to be provided over drain Main and hydrat meter positions for aparinca!/ Pats / condominium / schools to be Ioeatedinsive fencing pear ensance. For factories, all meter positions shall be outside ‘he fencing oF set hack fencing ear entance within the boundary ofthe perises Alt navi su. etes tn nltatorey buldngs Sal he oes t public cere fee ‘of obstruction, Alpes for col nd hot water system shall be proved by PBAPP. Type of pps used ‘hall bested Meter postion located on gros lors fora alk-up buildings mest bein ascending ‘ovder ad entified with pemanert des plates All sos te be provided with inopection ladders, tnk manhole cover, seou pipe, ‘overflow pipe, warning pipe ond mosqu proof actngs. All scour, overflow and ‘warning pipes shall be of PBAPP approved uatcrials, Sizes of ppes shall be provided sccording 0 requtenent Acces to mof tanks mst be provid from within buldings. Stopeork to ten ino tobe Fixed masimum of 2 mets fom Moor level. Stopeock sl be provided to te inlets of tanks, water closct and unl estas. Gate vane / Sluice valve fom tank ouets to be fixe immediately aftr outlet from tans nthe eas, whee thee sony ane cl point from the tink then only Gate Valve /Shice Vale betieen the tank nd the eutlet point 12, All concealed pipes and fitings to be inspected and approved by PBABP before concealing 15. Atl materials an workmanship shall ceenply wih PBAPP standard requirements 14. All plumbing works are to be carted out under the supervision of the consulting engine. 15, Waring pipes shall be lad beyond edge of bil i 1s. Water taps cated inthe stme enclosure min very close proximity to water clesets ‘all be auplid from feed tanks esters. 17, Allitings for dra-off points shal be of bras or stainless. (Refer to dreming G). 18, Adres plate shall be provided a the miter posit forthe purpose of ident when necessary. (Refer to Apes P) 19, Where the supply comes from the storage tank, the minim pressure atthe meter poston stall be 1D metres F, COVERED FLOOR AREAS For business premises, factories end mult-sorey billings covered Moo teas shall be Indice snd tablet on the pans SECTION TWO: REQUIREMENTS FOR WATER FITTINGS A. MEYERS 1 Thessanerd meter postions fr the varios meter sizes ae flows = dom ——_Relerto Append K 25mm Refer to Appendix L Som ——_Referto Appendix Mt 10mm Refer to Appendix N 150mm Refer to Appendis O Location of Meter Positions (2) Mnin and fr fighting meter postions sll be loceted inside the fence and in Front ofthe buildings acer eateance For condominiums, Mat, apartments and ‘commercial completes. For factories, all meter poston shell be eutside the Fencing stl aco entrance within the Dour of te premises or setback. (8) Ferpremises with pve fre hydra, parte meters fr the fie hydrant ard ormestic supply shal be provided [ (6) For wuli-storey buildings, the folowing must comply: 6) Install aia meter dion wo su-meters fr highrise biting, G)—Tadividuat sub-netes shal be sae a commen are, (Gi) The meter positon shall not be lested aver void (iv) The meter position shall be fixed 8 mete above the floor level end « ‘minimum of 100mm aay ran the wal (9) For Ssioney buildings, if he meter postions ate 1 be Locte onthe ‘ground fcr, they tus be fn the proer ascending crdst and identiiew leary wth permanent aes plate. (i) The moter postions for rouse chute shall be located atthe top mos oor and fined! onthe inlet pipe of the ete chute storage cistern (ii) Where mete ebinets are provided, thet shall be no ooking device fo the eabinet deer snd with eno working space for maintenance sn saficient iting tobe provided. Al propesed meter positions hal be hotizental offs and fixed in a stnight Hine, Separate meters shal be provided for th purpose of commercial snl domestic wages, For fictris and comnciialbuldings, supply 1 al-conitoning ard process tank ms ot be rom the private hydra metered pipeline. Nomi diameters of reticlation mins (ncluingsub-mains) are as fellows: Som, 75m, 10mm, 150%, 20H, nm, ASO, 80m, ‘The misionum pipe damotr allowable for cold water system is 1Saum ites diameter but for ene tp pont ony ‘The overlow pipe sal be of one size gener than the inl state. pipe but wt fess than 201m ‘Warning pipes ell be extended 250mm beyond the edge ofthe balding and rot lee ‘than 2S meter and water oveeletng al be sbi ribs, Storage tanks with capaci loss han 4500 Di, which so acts as a warning pipe, 5 shall be provided with an overtlow Storage tanks with capacities exceeding 4,500 lines sall be provided with separate ‘overflow and waming pes 7. Typeef pipe with sizes equal or greater than 100ram pipes lid across reds sl be Mild Stel 8. Theoverlow end warning pipes shal not be interconnect to the cstbaton pipes. 9. Fortank izes exceeding 200 lites, sour pips of adequate sizes shall be provided athe loweat prt ofthe storage tank 10, The etculation system shall be looped up without dead ends. IP dead ends cannot be avoided, scour valves sll be isalled ed dscrge ino a ea, 11. Storage mks ef same usage shall be imerconnected on the outlets of tanks Tor the Daryn of water batanoing and msinenanc, 12, Thoplping system for domestis sup i condoning and fro fghting supply sal be separated 13, All istvaon pipes downpines fm storage tanks) sal not be interconnee! 0 the service a commie stion pes For buildings where inividaa sub-meters aro roguired, pipes leading to the upper Moots stall bina common aes. C STORAGE TANKS 1. Allstorage tans restr sal comply withthe requirements of PRAPP, (Refer to PRAPP lis of approved matric) 2 To-sate capaciy ofan minal cisterns (5 ues capacity per wil bow! or every 585m leat of rina! tal) 5. The nett storage cacy ofthe oof tink shall havea minimum of aneday consumption, 4. Thestorge tanks shal be mosquito profed 5, All bull vales for exposed of op sorage tanks shal be copper aes 5. Themanbole cover ofthe tank shall not be more han 0.6m away on the ll valve. 7. Make-ap tank for swimming pools and water.ccoling ower fr st-conditoning writs shal be esa of fom domes storage teks Access tothe storage tanks shal be provided fom within the building 9, Water tak for domestic purpose which ace greater than 1.2m high shall be provided wih hocalipped galvanised or any oer apyroved ype of lar cn the ouside of he tank with sais se! Ice nse te tae 10, Forman domestica, th iterel ane extemal adder lb tipped ganized ot her approved PE v. 2 2, ‘Water supply fr tee ches sal ubbish bins shall be obtained fom a separate on ‘All domestic tanks shall be sport from other non-domestic tanks Water supply detverd through ps in the sane enslsire and in very lose proximity to water elosets example in bathrooms shall be supplied from Storage tks excep. fot shoes. ‘Roof tanks for domestic use (except reinforced conerets tank) exceeding 4,500 lines storage shall be provided by atleast tro soparste tanks without in between and eppeosimstely oquel capacity whioh are Fined with spate ets Ta elt hall be intecarectad or eves adders to elevated water storage tanks landings shall be adequately provided every om height. “The minimum capacity of tens shal be 100 lies ‘The miniosry hoght for tonks shall be 450mm, “The bse for HDPE or thet apoved tanks sal be adeguete'y suppored tll pont 0 prevent stress failures and miniann Beadmom of 873m shall he provige For exsy Frspesion ae cleaning he storage tanks ate on common rooftop, eu se mt trey shop houses or Mas, the ‘overow pies shall be extend tothe inivial unit where sell isle ‘Water supply to water closets or taps inthe same enclosure withthe water closes shal come fom feed tank except forthe pups oes ws, or roof storage tanks oxceecing 4,500 Lites, the inlet and outlet position shall be on opposite direction Storage suction an locate oa the basemen, the overflow pipe sll be discharged into sump and sump pusps vo be pre to pnp oa the wate. UNTERNAL PLUMBING Siopeocks or gate valves shall bo nse athe following posto (0) Within maxinurn hight of 2 om inlets o al tak, (6) On oitesof storage tanks, fo Atevery Mate poten the reeatiion system, ()Inleand ext pipes of suction nak. fe) All scone pipes, (1) Inte kitchen ep, stm, uranls and Mach valve. ‘To provide pressure-seducng valves or tak pressure taths on dstibation pipes a not met than 50m drop in height an within hand each on the equivalent fer level. ee FE, EXTERNAL RETICULATION MAINS 1 Tosa Stice Valves the following postins:- (2) Atevery oie pin o (0) Atover ire hyd. (©) Allscourpipes, (@)—Atevery ftom for long stretch of water mains, 2, Tosttl no-rtun ste immediately afer the pumps on the deivery ans followed by She Valves or Baterly Valves F. HOTWATERSySTEM 1 Tostre spe of water heating system. 2. The pipe mat but NOT lead, 1 shal be of copper, stailos steal o other coroson resisting material 3. Nopressre petot wate citer shal be ited with assopeoe onthe vet pipe 4 The length 6 pipe conveying hot water to any drawoff tp shall comply with the a following (@)—_Lamest Nominal Pine Demeter (nm) Length ‘Not exceeding 15am 18 Exceeding 151m tt nx execeting 2910 2 Exceeding 20mm fut nx exceeding 25m s veeating 25mm 3 ate rom (©) Thestingspstom, the old ater aust be supplid fom sp the storage tank (©) When ota cold wate is passing dvoagh acorbinnion ta, both ex and eka water sorage tanks MUST e atthe same lve 5. To provide aivlve and non-return valve athe net of he str fr salar heaters, 6. puMPINGsystEM “The following requirements shal apply prise pam rooms pump hens 1 There hall eat less 2 pnp, ere wnt om ty and one a standby, 2. Standby pump sal prac in iin othe duty pump to supplement soply to storage tak ar and when accesary. The sandby pamp shall be able to operate as duty purp and vieesversa through selector eit installed oa the starter pan Operation of the pumping syaton shall be atomically controled through the ase of ‘ities tel cletodes installed a the suction tank and storage tanks. A change ove ‘ite shall be provided onthe rer pan! allow manual startup ofthe purest, The tte of purping ofthe duty pump shall be adequne oil he some tink ethin 6 ows “The storage tanks shall be one dey storage andthe suction tank sha the storage lak copy be a leat 8% of ‘Where stndby generator i provid in th builsng, the pump motors sl e let be onnzie tothe standby generator through stomaic switching over for cperating the pump mtoe sets ‘Make, model and duty pump of sleced pumps shall be approved by PBAPP before installations, Performance curves shall also be submites, Before installation, the ‘onstling engineer or suppice stall surat the type of pump for PBAPP's approval Including the design ctelations. ‘The by-pass on he Incoming mine tothe sore anks shall be incorporates with non return ive. ‘Ax alr circuit shell be iaconpernted inthe starters to give an audible / visual alam when the water Level in he overhead storage tanks drop below sandy pump start ev ‘Te earn sl be suey located ana stable ibe! Sal be rovided. Atal ese tao shi be provided ight the slat. ‘The minimum duration between str-top pump eperations shall nt be less than 20 For location of building on high ground, which is more shan 15 mewes, a complete pumping system is ried For pump house 6 be handed over 0 PHAPP, shal be sound peat Preamtie puns tobe provdod fortwo topmost lor fr all ml storey budge Toprovide be stage of pumping or balding ethan 60 mets high ‘To provide an approved surveyor drawings oF the land where the pup ouse and reservortntbe handed overt PRAP?- MANDATORY INFORMATION REQUIRED IN A PLUMBING DRAWING (2) Outside diameter ofeach stretch of poe 0) Post of valves and meses where rue. o @ © © @ o Poston ofall oor tings (eg WC, WB, WCT and et) Pumping nctwork and by-passes whenever applicable) Poshons, dierson, capacity and type ofeach sorge cistem. “Typical cross-sectional detail of och storage ta ‘ute, overtiow, warning and scour pipes. an shoving positions of inlet, Relevant ates specifying the pips node of pipes, materials ee Key or legend fr abbreviation and synbols used 2 APPENDIX [APPENDIX APPENDIX DETAMS FAGENO. ‘aoe fr een pp mers ae | Pu Eta nis “ | Puc: cra Ping 15 | Gono Tonk Mas ces 6 Speciation fr tr for PAP apse ke ¢___| Pun Peed Seis wna bncr@ordomexioue) | 17:20 Pot 2: FR panel wera arent x Pat: se Sr ks or nonce) 2 D | Pavpisg sys runonens 336 E | Hen Wit Fora 7 F [Hz Wiis Fora How Catalan Cat x ‘| Tpkal enippe up a vals wih Sah Sel ort ugs| 39 1 [Detnion oye a pes 0 Typical plumbing works before meter position 2)” mas = 259 a , |i actors teve 2 i im Fe % 1) Stes tet a 2) Stain an 2 toes s K | Dept tl ten Sats Se postin wk é (cable valve pene [Tea et of 2 Se Semcon a NM [yp al of Sen Sas Sel meter porkon a N ‘Typical deiail of 100mm meter position 9 © [ypwal a of stn mer poston 0 Pe PBAPP standard address plate | & © Dell of ise Vale boxes [_2 [Dati of at io SV. au ie [os 9) et af pica pinata le st S| Deaiershon pir hymn mucus deur 5S 0) T_T ea fen sss [36 | Minimum wer ge capacy 7 [Basile pg eine ton pee ram Fs Stinks Stl epson Mer pn ws ctr nvibal oe @ w|i) Nets psten erin se ang ” a fi) Meter position inside cat 8 APPENDIX A (Pat 1) OUTSIDE DIAMETERS FOR DIFFERENT PIPE MATERIALS TABLE, (EXTERNAL MAINS) Wanlziioa ‘Outside Diameter) acti roa ‘Mild Stet DPE 25a) & 50m 2") 8 75am) »” 100mm (8°) 1s 10am (6) 170 ima 180 200m @") 2 a2 300mm 2") 35 Ma | Som (18) 80 S020 dam 2) oo eso 0m 6") aso 1.20000 48") _ 1255.0 | 1,380mm 54") Lasso | 1,800 72") 18750 TOLERANCE ON PIPE OUTSIDE DIAMETER ‘The tokerance oa the outside diameter ofthe pipe shall be coated by the creunrence ofthe pipe measted on the outside ‘The varane onthe circumference of he pipeon the oust tal not be greater than + Sm APPENDIX, aera) (OUTSIDE DIAMETERS FOR DIFFERENT PIPE MATERIALS TABLE, (INTERNAL PLUMBING) ieemal pose Norn ee Saag] na 2tian GA") zo | 160 smn) 2 aso | 200) om 5 0 a0 | 320 scam") « x0 | so sim se oo 100mm 125 asim 6° |_170_[ 723 | 10 | accom) | 222 | 2322 | Simm ie] 96 | sas 1] TOLERANCE ON PIPE OUTSIDE DIAMETER allowed for ue under exposed condition. For conceal piping, UPYC ‘Tnetolerance on the outside diameter ofthe pipe sal be conte by th circumference of he pipe meneured onthe ote ‘Ths saiance onthe cireurnference ofthe pipe on the ouside shal othe greater than 0.5mm APPENDIX B FIRST SCHEDULE ‘SCALE OF CHARGES AL Rosotiat Premises 1 Brick Houses (2) Terrace or Link Home RM300-00 per unit (0) Soniadeuched Howe RML400.00 peri, (©) Detached House RMS00.D0 porenit, 2 Hate For vary at having soverol floor aren- (a) Notexeceding 80059, RM100.00 per uit (b) Exceading $005q, but nov were haw 140099. RMGOODD per unit [e)Fxeoading 1400 89. RMS00.00 per uit 3. Tiomber Houses (2) Howse with timber walls RX 20.00 pe wit (6) House wih hl bck Rolie walls RNC 20.0 por unt Busnes For every business premises an factory having coveted Moor ae () Not exceeding 2009. RM 20.00 permit (8) Exceeding 200g, 6 bu ot more tha 1,000 sq, RM300.00 pe ait G6) Exccding 1,000 4, But notre than 2000s. RMSOD.0O pe uit Forever 10059 fo part thereof is exces of 2.00 qa charge of RMC.00 sal be payable SECOND SCHEDULE @ o © @ © Apncove low oost houses ad ats, ‘Government schools or oer approved institutions of earings Aeligousistuions ad approved bilcings for charitable orgonizations oases connected fo communication pies installed wit eres ie Haas Approved by the Pefanan Beka Att Pala Finang Sdn BL ‘Ry otnor on commercial eaitaion a aprosea bythe Pethodanan Hekalan Air Pale Pinang Sd Bb 6 SPECIFICATI 2 Allhet ip golvanising shall comply wi 3. Priet weitea approval from PBAP? sh the hot-ip gavanising 4. The following additions specifics APPENDIX C (Patt) FOR PHArP APPROVED. ER (FOR DOMESTIC USE L.Allcomponents ofthe rested steel sections tanks shall comply with BS1S64:1975, hk MS740:1981, hall be obtained as regan tothe source of mn shall be Fly complied with ‘COMPONENT MATERIAL, A) Peesod Steel Tank Plates Hocaip galvanized ak pats 1) Cleats, intemal braces to nk plates and internal adder Stness Sts! 316 Ti) Reot cover otal 1) Hovdip avasized pressed ses. tof plates of minim 3.0mm ‘OR ') GRP/FRP secon ater tan ro panel taSS245:1981 In) Supports to roof plates 3) Stainless Siosl 316 roofing plates a in OR 1) UPVC for GREZFRP rooting plates in Gi (by 28 tocommended by the GRIER roofing panels manufatirer Sipping of ning cot tap porimatr elas Stanies Stel 316 | Bolts, aussand washes, intemal o ank ates i) Bolts, nuts and waters, extern [Lats tom ai Stanies Stet 516 Hot. dip galvanized vider Kner igh Density Plyedinlene GIDPE) aaa ‘hisknes of 2.0080 ‘COMPONENT. MATERIAL, ‘x Tank suppoc ste! Lboams and extemal | Hot-dip galvanizing to all uppor steal bans leder ann extemal lees [B Outer Sunless Stel Brass mpes 5. Tank idenitcation- Tens musth sums plate affixed. 6 Submission of plan eppeoval~Consutent must sate on plas hot-dp gavanied presse steal anh with HDPE Tnias PBAPP opproved isp 7. The following documents will be used by umber here earying ou the ob 8) Job Dacaration Farm 1) Method of Ststoment for nstallston OF LDPE Lining Tank 8 The HDPE lining of the hot dipped galvanized pressed steel tanks shall be dane by PBAPPapprovec lining applicator. Name OF Project, PBAPP Fil Ret. No. Name Of Consultaat Nane Of Developer Nane OF Plunder [Name OF Tank Manafictser Name OF Tank sie Name OF HDPE Lining Applicator Material Dosis Tank Delivery Onder Brana Lining + Delivery Onder Brand Dat of tart of insialaion: Date of compietion ‘Ecruson welding gun for Lining lst calibration date SigmiursOFPiamber ‘Nancof planer 4 PBAPP Plumber Registation No 09: ro ll Zi INSTALLATION ON HDPE LINING /TANK Micro OF STATEMENT. ‘Toke delivery f Lining (rom: approved saree) sting /astallaion as pr menufictre's pei Spread ining ono intemal of water before insallaton of tank cover Lining wil be from approved PRAPP supplier together with certification issu by BAP. ‘Welding by extrusion with minimam 75mm overlap, Prior to welding the surice must be nde or reughened to recive welds eda 20 - 226 Celshus for molten resin sick to joi generous application of molten resin io be discharged and preted manally one poss (ice) Ces approved enset be nw to provet Iakages, ova of ay cove. ‘ets / net - pod cuatity gasket to prevent Ieakage Double eng feral opesings. “Tes for leakage epi be suited Genera cing, wings to be provid for ispection 20 “ aiiy 6) oi) APPENDIX € (Pat 2) {CATION FOR MATERIAL FOR PEAPP APPROVED TANKS FRP-PANEL WATER TANKS REQUIREMENT Intemal Ladder to tank be of Stiles Stel Type 316, _vanized to MS740. spe Tank support sks tobe HO Internal bolts, aut ar washers tobe Stainless Steel Type 316. Bolts ond nus washers exterel to tank and roof plates ee to be only HOT DIP GaWanised vo M740. [AIL internat feinforcerens (tie rods) used, if of Stainless Stel, all be of the Type 316, Roof cover to tanks shall only bo of FRP-GRP panels only. a APPENDIX € (Pant) PRESSED STEEL TANKS (FOR DOMESTIC 1. Allcomponents ofthe presse steel sectional tas shall comply with BS1S64:1975, 2 All ota by PRAFP fin stall comply wih MS740:1981 and fom the souree approved 3. The fllowing additional spoviticaton shel bo fully complied with COMPONENT MATERIAL, i] Pressed Sion! Tank Plats Hot dip galvanized tak plat 19 Gets neal aes wR | yi 36 7 Reafeoer aa Hokdip enied red elcid er rere Tagawa nsiaon Sil Se 31 rho paid opis Siang fig ontop pr ge] Hoeap gaan a Se ee [iio sated oops [end ptemind ix) 2) Tank support Concrete or hot-dip galvanized stec! beam 9) extemal der Sues sa, iano H-p aie Se APPENDIX D ‘PUMPING SYSTEM REQUIREMENTS ‘The foiling reqsioments apply 0 pm houses an reservoirs which ae ta be Rended over ve PBAPP. A Pump Howse |The and on whieh the pusyphouse fs constracte sd the acess mad leading fom he nzsrest public roa to he pmphouse sall be handed over tothe Jabatan ekalay AIP Pla Pang, 2 Suitable drainage shall be provided inthe pumphouse to allow overflow or dripping ssler tobe drised otto Ue prints dain ouside the bili, 5, Suitable sn sulTiien ventaion shall be provide inthe ston, A ventilation outs rise covered with Stainless Sts! most meting 4, Tho pump room shall be Inbelld and its doors are tbe made of ard timber with opening extwards. 5, A-oist or gantry crane as approprite should be installed for iting the pumps 5. The building sal be of enforced cemerete design with fst reinforced conerte roar ‘nd patted necordng fo he ec scheme of PRAPP. 7. The pura station shall b fenced up with 24 metres high ho dip galvaned fencing pul crbeded in bickwall, half fencing and half brichwall surrounding the Building withthe compound tated ll und 8 Freextingiser to be provi 9. Faprovie fist aid CDR posters fama p on wl 10. To provie bly sized rubber mot info of sith Bord. B.Suctlon Tanks Seton aks size shal ot be ess than 5% at strege tank eapncity 2. Ball valves i uso, shal be ofthe copper pe Pumps |. Miainum of we puns with ne duty and he eter as stand. 2 Pumps of pumping automatically consoled with stsinles sie electrodes installed at be suction and storage an, 3. Rate of pumping ms fil storage tink Between 4 = Ghowrs 2 Bypass sal provid tthe pump incorporate with non-return valve To state the make, model and dy of pumps. [A suitable sntge-antispoting valve shall be installed on the dativery ine and the Every tem may not apply toa panel station, Thislistis ment to he ased as aide only. It et alinctsive. Bach pumping statin to be sontructed must be designed for the parila wages and neds oF its station > The design of pnp tions it be consent with all levan authority repulsion or ny epee information, sould it become availble. This cheeKist dated 13/0808 supersede eatice chee GENERAL YES NO Five (sens ofthe oprtion & rsintemance manual prepared bythe ‘consultant engineer aad ina form accepable to PBAPP ae tebe ‘Ssbmited upoa completion inclusive ef asi drawings ‘The consracton ofthe puming sation ft Be supervised by @ PBAPP registred professional engineer. CCleustion for tho sizing of he panp-et roto provided. Complete pins and writen specification are wo be povided. (ne dy of owner orientation it be provided 10 PBAPP prior tthe tuunover ofthe sation, “The station mst be flly operational and have been checked ont by the engineer peer othe over arexation. [MAGE conan plans have tbe eit fer PBAPO’s approval BUILDING CColpsile sel dears o be provided, Door sw be wide eaough e aller rue to be tack yp the dor for renova equipment Ey Constr se NR on looks and keys ring eonsratons| Wien the stator is tuned over to PBAPD, is tobe replaced with PBAPP's stand locks nd keys All surices cto be pitted. nd the eolorof which ito be approved by Bare. ‘The ctor for markings BLACK eters and aro, Paap house lor tobe tile. ‘One outdoor light tobe provided above each doo. "Two 1S ap. stitch soot outlets and adequt lighting in and around the sation shouldbe provided. ‘The generator and contros are oe in. a room separate fir the ‘oon The yer ees seca ow On sear era oF the buaing Gers a0 be provides as raged and arto be dined aay fom the building. Adquate oom to maacurer and maintain all quipnent is 1 be proved in each oom, “The pup none 19 be soe proof to S0dh measur at ur side he building ‘An cnlcton sign which most PBAPP speciation i tobe mounted ‘a the oatsde ofthe builng ‘The pump areas at locsare to be pth dais oa sump are om which water wl drain by gravity or be removed by 2 sump pump. ‘The divetay and compound ae fo be ee ‘A metes wide lide type ety gates be povided inthe ene. » The anon which the pump hous s construed shal be hands ever tolsbatn Helen Air Pala Prong 25 met high bck wall plu ion gril foe shal be erested around ‘ump house compound, MECHANICAL A minim oftwo purple (one backup is tobe installed ‘The backup pump shoud beable tobe operate as duty and vee vera ‘osiate the brand, model and ype of perps “The paps arto have mechanial seas. ‘Two posse gages pe pupae io be provide. Comte urn curves arto be supplied to PBARP. Paps tobe instal as recormmonded by pup manueeturer spt and approved PBAPP. A ganector Witham automatic nauser switchs wb provided ‘The fuel tank provided wth he generator tall ako Have a anual seaefer pamp to be seated null inthe event of an emery. Allegupmeat is be held “Tos punp howe sto be freshe ith buen Bomba & Ponyelimst certifi Sie extgnisher Panpescts are tobe aligned to TSO sama Pumps vitradon is eto 19130 standard x0 er | 2». 24 a, Pampsts bearing empentre shouldn't be ebove 0 Coss, Pumping te shoot he cenforied o designed Now rate, To fil stone reservaivan within - oer amp shouldbe designed to maximum possible eficinsy Pumps above 120k shoul have ovetead ere Wit cerifnton IKKE: amp setion an delivery sper shoul be econ A bute valve i tbe insaled teach sid ofe pump. An adagtle mecca coupling reinfared with te 0 Be italia at ath ie of pu tora shes valve should be inal in eah pump delivery pipe ‘Suge rele vale fc be asad ise the pump hose and piped tie hs bln A perms final piping diagram tan rom ston tk, pnp and resorseleated tank ist be eed in tho scion, Pipesand fings ceo be alec spore. ELECTRICAL cable Sie + Termin + Marking 2 Meter + TNDaacter be natal onside noe = Volante function test + Amaieter anstion est +P mater nedon test a + Amp indestor + Stas indicator 4 Panel 2 Imeroctang + Esl fan + Mowrproetion + Mover learance + Pane leases + Lon assem a + Spare par compartment Protection devices + Volueter selection switch + Ammar soesion sien + Motor nn selector itch + MCCR sing 1 Sequenes tt + Lond es + Tapping test + Bathe Drawings = Ma singe tne + Conteris + Cableroue + CPR peer 2 ALARM ‘The follwing armas are to be provided. 1, Buehigh ter vel lam that ago urs paps off 2. Extn low water level alarm that als tas puta on, 3. igh system presur slam also shes everything down, 4. Intron alarm with djusable dla. 5. Fre alann wihwithowt CO2 ye, 6. Powerfie aim. 7, High boring eperatre lam tha als tum pomp of Phong in bulling alam, RECORDERS /CHARTS/ METERS 1. Ranning Hor etets arto be provide fr genertr, pump an mata 2. Seven days pressive recrder for sus and delivery with ane. yeae supply of sans 3. Seven days level reeoner and indicator cemspicusly visible fom distase for suction and stage reservoir with one-year sippy ofdurs, 4. Magnetic ow mer with incicator of instantaneots flow RESERVOIRS /TANKS, ‘Seton tank hal not be ss han $6 storage tank capaci Dall valve can bo use ifinlet is 20m ad below, Andit shoul be enoper ype. "Te Land on which the reserotenk i consruste hal be Rad over to Jaton Hekslan At Pals Pang ‘PBAPP'sengincr shal approve Reservoiestonks dsians to PRAPP'spesifcations. “Thereservoirsl eof reinfored anes Conerte iiease sll be provided for walking up othe top oF ‘recervitttl and insrtin rool Aces ino the reserva shal be provide: Concrete sinless so siete, Int: a postion atthe Mss) ander pipe shal be pita in 30a roms base ‘Overow pipe sal be posioned 100mm sbove the T.WL and slscharge nod ‘oversaw warming pipe shal be positioned 100mm above “TW L shld be vr eoespleucis and cleharge no a Ventilation sll bs adeguatly provide ‘CenezeteSelaes tes sructue sll be povided 1 service the level sects ‘tines sto gant shal be eect around toto of reservoir ‘An ienlicaton sign tha nce PBAPP specications i to be mounted fn the cutsde ofthe veservoistanks. The driveway and compound are to De are 8 ‘A metres wide sie type entry ete tobe pried athe ens 2.5 mete high bic wal plu inn gpl Fence should be erected around ‘compoued. The flrs eto be ph 1 drain t a sump are om wih waler sul drain by gravity or removed by sump pap. [All yalves hal be stalled in B.C. amber The chamber sal be dry tell ine, Permanent idrbsicaton Ibe shouldbe ated ‘Alitade valve sal be provided te prevent overflow should elses ‘al 36 APPENDIX E IAZEN WILLIAMS FORMULA ‘Hazen Wiliams Fora works. {is generally ured to calelate the diameter ofthe ppetine forthe wer D= 1.6258 CH®™* 0.38 + (7% {Diameter of he pipeline (a) Cocticeney slated to the pipe condition, er te ceateot morta ined ductile ron pe, CH valu of 150 can be wed. However, for design purpose 130s recommenced which includes esses i Cains, ‘valves and omer facilites pis sme allowance ‘Volume ofthe water 6) Q=8 DM, V: flow velocity (mis) 4 Hydrate gradient T= BNL, heed loss (mL: Length of pipeline rm) [Above formal ean be changed as below: 0.666 CH * DAM Q's Q=0.27853 CHY D+ “The dismeer ofthe pipe, hydraulic gradiea! an dhe water volume can be caine ot ealy by ‘the abowe forma als ty the Mw lean cht as shown in Fig HL 9” APPENDIX F HAZEN WILLIAMS FORMULA id CAMMY PE lf. UES 1 tot pen oe "ig THT Pow caleulaton chan (by Bazan Wiliam, Cu = 130) 38 APPENDIX SONILLIA SSVUM YO THALS SSA INIVLS HLIM TTIVM LV) dV.L adId NVLS TVOIdAL ‘ddld TaaH/aasay m7 NOLAVaY FTV BACH/Ma/SaV wn9z fx ee comet ssvas wurst 5 2 ‘S3dld JO 3dAI 50 NOILINIS30 Vee te ee el tg ose __| ‘3did NOLNGIMISIC | did 30IN3S | INOINAWWOD- | I | | vi | | avd 3 | Lt | (Supue4 epsino) is ie. BABA 91924907 LINK oe a ‘ tan -sI2N alg SSeS Haig snag i aaaageal | SBS APPENDIX HG) Tas samrNmsapwuR fh Bs ee ‘us ssamuisuusenie watt Hz (Moe's 121s SSETNVIS Wen ~ yy anys ge OSES. | i sunny onoeta = 43 ee stan mower weet ~ 4 ba aa APPENDIX. i) NOILISOd S3LAW 380538 SHXOM ONISWNd WOIdAL Lulssenaa a esumimo) _ 13818 ssqiN.S se ‘aii Sen Uz APPENDIX I (i) } a # pF eat a a a Pe ° ree ‘ moma tai seas se) APPENDIX a [ (onions aa;ino) arown ‘Pinon lsnnouisod WSLIN SALSSSSTNNAS APPENDIX (0 | pun CTVPICAL PLUMBING WORKS BEFORE VETER POSITION APPENDIX K ‘BRASS EBOW FNL — ‘TYPICAL DETAIL OF 20MM STAINLESS STEEL METER POSITION WITH 20MM LOCKABLE VALVE 6 APPENDIX | NOILISOd MALS TSALS SSTINIVIS WG? 40 WLC WOldAL W z SS 3 NOWISOd YSIS TAALS SSTINIVIS WWOS 30 IVI WOIdAL BaIANGTA ‘vias ne APPEND APPENDIX APPENDIX alVid ssayqqy "SONTHSLLTT GZAVEONS HLM BIVTd SSVueIMIMININNTY NOTH wus “LON 1+8-7- 847 nigeos 7331s SSaINIIS SLV1d SWYN ‘A'S NOU! LSV9 40 TIVL30 Wid %§1—————+# + 4+-0h—+-— 9 +--+ W-¥ NOILWASTS TYNOILOSS PH O41 APPENDIX Hospitals /Hestels/ Boarding sehools Hoses Day sehools/ Kindergarden / Nursery Wet market Office Block / Public Facility Light Indus Buildings Heavy indus Bullies [Resauranie Mose oibers ties per mate square £22000 lex por overs 45,000 ives per ects 25 ives pee metre square vo es per mete sate (One day supply or a8 decid by PBRAPP é NOMISOd WALEW ESIS SSTINVIS UTOE WOr Wald LSOHS Ly GSlSsni 39 OL OMe SSvas GL woz, ce ddsa APPENDIX W ‘did WaddOUC SAV HIM ‘SIVId HOI NOILISOd UALSM-ENS TWAGINGNI APPENDOCW ci pund 506 04 spuenoy ej oh eon Bue) teu STON EALNOOTSGOL ON BOOT SHE ISNINOLISOd WaLaN guDsBNOI qaais'S dance) pe 001 sz. ed +008 —+— 08 008 > a

You might also like