This invoice is for the transportation of 14 pallets of local beer from Bali to an unknown location. The shipment took place on March 12th and consisted of 2800 cases occupying 72.03 cubic meters of space. The total cost for the transportation was 3,595,560 Indonesian Rupiah, which included fees for truck rental, forklift usage, storage, labor, and cancellation of a previous forklift booking. The invoice requests payment to be made to a bank account under the name Sutarmin.
This invoice is for the transportation of 14 pallets of local beer from Bali to an unknown location. The shipment took place on March 12th and consisted of 2800 cases occupying 72.03 cubic meters of space. The total cost for the transportation was 3,595,560 Indonesian Rupiah, which included fees for truck rental, forklift usage, storage, labor, and cancellation of a previous forklift booking. The invoice requests payment to be made to a bank account under the name Sutarmin.
This invoice is for the transportation of 14 pallets of local beer from Bali to an unknown location. The shipment took place on March 12th and consisted of 2800 cases occupying 72.03 cubic meters of space. The total cost for the transportation was 3,595,560 Indonesian Rupiah, which included fees for truck rental, forklift usage, storage, labor, and cancellation of a previous forklift booking. The invoice requests payment to be made to a bank account under the name Sutarmin.
HP : 085608896706 BALI Revisi Date COMMODITY NOPOL SIZE 14 palet x 3 14 palet x 4 B 9052 FXY N 12-Mar BEER LOCAL 1X WING BOX = 28 PALLET 114*99*100= 1.128,4*14 = 15,792 m3 114*99*128= 1,444*14 = 20,216m3 9824 EI
TGL TOTAL COLLY VOLUME (M3) SUB TOTAL BIAYA
NO BM / BK KETERANGAN IN OUT HARI RP IN OUT TOTAL IN OUT TOTAL RP BONGKAR/MUAT ** 1 WINGBOX 12-Mar 1400 1400 36,01 36,01 1 WINGBOX 12-Mar 1400 2800 36,01 72,02 sewa gudang 19-Mar 7 5.000 2800 72,02 2.520.560 BIAYA FORKLIFT 3 TON Forklift 3 Ton 2800 72,02 450.000 mobile 2800 72,02 150.000 handling driver foklift 2800 72,02 125.000 Pembatalan Forklift tgl 11/3 2800 72,02 200.000 KULI 1 ORANG 2800 72,02 150.000 NOTE 2.520.560 1.075.000 BY FORKLIFT Selanjutnya Rp. 150.000/jam GRAND TOTAL IDR 3.595.560 Belum termasuk Forklift Muat Transfer rek: BCA 8725182321 a.n SUTARMIN