PEMBANGUNAN/RENOVASI KANTOR
PONDOK PESANTREN DARUSSALAM
MARTAPURA
LOKASI
+ 12.00
Muka Ring Balok (RB)
MARTAPURA - KAB. BANJAR
POTONGAN C - C 1:100
WF 500.175 Casetelated
+ 8.00 Muka Lantai 3 (ML3)
36
DIGAMBAR OLEH
WF 500.175 Casetelated
+ 4.00 Muka Lantai 2 (ML2) 18
DISIAPKAN OLEH
Kolom beton 30x30 cm
SUGENG IRIANTO
Sloop 20/30 -1.50 Muka Poer Nuet (MP1) PELAKSANA
Poer pondasi 150x150 t = 25 cm
Lantai kerja K100 t = 10 cm
DISIAPKAN OLEH
Pasir urug t = 10 cm
PENGELOLA TEKNIS DPUPR
Minipile □ 20x20 Panjang 12 cm