You are on page 1of 8
COVE) HYDERABAD MUNICIPAL CORPORATION fx f Re orate dire) $s HYDERABAD From To ‘The Executive Engineer, Sri Kareem Ansari, Project Division EZ, Yugantar (UJFVHXTZ), 5" floor Parking complex, 3-4-142/6, Barkatpura, Abids,GHMC. Hyderabad — 500027, Sub: ~GHMC — PD-EZ - Request for information under RTI Act filed by Sri Kareem Ansari - Information regarding “Details of Flyovers from 2014 to till date” — Furnished — Reg, Ref: 1, U.O.Note.No.01/GHMC/RTUCE(PYTA2/K 1 1/2022/01 Dt:06.01.2022 seers With reference to the above subject cited Sri Kareem Ansari has requested information under RTI Act 2005 regarding “Details of Flyovers from 2014 to till date”. Accordingly, the information pertaining to PD-EZ is herewith enclosed. SLNo. Question ] Reply 1] Provide information on number of flyovers sanctioned from 2014-till date. Provide this Information zone wise. Zi Total number of flyovers constructed so far in GHMC area from 2014 to till date and also flyovers which are under construction. o 3 | Provide the details budget sanctioned and amount spent for construction of various Flyovers in GHMC area. 4 | Provide the copies of the sanctions given for construction of various Flyovers. Provide this information location wise and zone wise. Copy enclosed Copy enclosed Copy enclosed Copies enclosed Yours faithfully, @2P-EL, GHMC 1. Copy submitted to the Superintending Engineer, Projects (CN&EZ), GHMC for favour of information, 2. Copy submitted to the Deputy Chief Engineer, Projects, GHMC for favour of information. RTI Application of Shri Kareem Ansari Dt-29.12.2021 Information regarding “Details of flyovers from 2014 tll date" a Nec areeie a io ‘Workin Progress Mis BSCPL Infrastructures 448.00 20948 ge fone [Bsiramalgude LHS fyover LB Nagar RES fyover Iago over [Baiamalpuda 2nd level Nyover 1) [Bairamatuga LHS Loop i) [Bairamatuga RHS Loop vi [LB Nagar RHS VUP [Dropped 1) [kamineni VUP Mls M.Venkata Rao nfta eran ‘Work tobe stated 2. | Construction of Grade SepaatoFiyover at Uppal Junction 311.00 0.00 GOVERNMENT OF TELANGANA ABSTRACT JARUD Department - Greater Hyderabad Municipal Corporation - Construetion ©! Mult Level Flyovers and Junetions at various (20 project) important places GHMC Area under Strategic Road Development Prograrmme In Phase-1 on EPC nose -Administrative Sanction - Accorded BAN DEVELOPMENT (F2) DEPARTMENT MUNICIPAL ADMINISTRATI G.0.Ms.No.121 Dated. 08.09.2015 Read the following:- 1 G.O.Rt.No.208, MA & UD (F2) Dept., 0t:30.05.2015. 2 G.O. Rt No, 232, MA & UD (F2) Dept., dt: 20.6.2015. 3.G.0. Ms. No. 94, MA & UD (F2) Dept., dt: 24.7,2015 4. From the Commissioner & Special Officer, Greater Hyderabad Municipal Corporation, Hyderabad, Lr. No. GHMC/ENC/SE(P-W/2)/ PO-W2-1/15-16, Dated: 05.09.15. From the Commissioner & Special Officer, GHMC, Hyderabad, Letter ‘No. GHMC/ENC/SE(P-WZ)/PD-W2-1/15-16/246, dated. 08.09.2015 ORDER: In the G.O. ist read above, Government have accorded in, principle approve! for construction of fyovers/Junctions for the proposed 20 projects Pere BeMT- Annulty mode of procurement under PPP subject to approval of cee fsancial 2nd operational model of the project subsequently by the Saverament. In the 6.0.2" read above, High Level Committee (HLC) has Deen cErSinuted to Co-ordinate the project works. In the G.O. 3” read above, anemone Rave sanctioned to take Strategic Road Development Programme ee emrerdon cf 20 Multi-Level-Flyovers and Junctions in different ares of ese Atktioned in G.0.1" read above under Phase-I subject to certain conditions therein. 2. The Commissioner & Special Officer, Greater Hyderabad Municipat “tion, Hyderabad In his letter 4 read aboye, have informed that to oréers issued in G.O. 3% read above, tender notification for 18 Scat to the extent of PPRS available under SROP Phase-1 works was issued Poe senuer Notice No.1O/SE (P-W2)/GHMC/2015-16 Dated: 07.08.2015. In the Pre Bid mecting certoin af have relsed apprehensions on the ne Pees project, mainly on the (#) Bankabllity of the said EPC-Deferred Annuity Peeeese? Bocument (1) Compensation on account of delays not attributable to actor ete ‘The Commissioner & Spedal Officer, Greater Hyderabad Municipal ssporston, Hycerebad has further Informed that the EPC mode is not ony sooo ene! sdvantages of BOT annulty and the EPC Deferred Annuity pe Rdne Mode contracts but algo eliminates all the demerits of BOT - Annuity ‘ike tucrbitant emount of claims by the Contractors / Concessionalres in we Runt of departmental delays in handing over of encumbrance free sites in US. Sitean sites on sczount of (I) Land Acquisition, i) Utility shiting, li) Tree je Socetoneutting leading to huge loss to Government exchequer without ivul- work. done. Further, EPC mode will be more appropriate io the “yoical Urban ‘Metro Scenario to achieve the targets within the “ee\pie ume frome without much financial burden to the department on “Couve of depertment delays. Also Informed that the GHMC Is taking up Sciuiuecon of Grade Separators / fiyovers under EPC mode of contract forthe JD years and successfully completed the proyects ‘he Commissioner & Special Officer, Greater Hyderabad Municipal fn, Hyderabad has therefore, requested to accord approval for calling fresh package wise tenders for 20 junctions for which PPRs are readily available ior Eee mode as per G.O.Ms. No: S04 MA & UD (Al) Department, buiew.12.07.2007 superceding G.0. Ms. No. 94, M.A & U.D (F2) Department, 2m ynct! sox and afso to. accord adrninistrative £2 4951.00 Dated: 24.07.2015 and aes er ares) to take-up the 20 Sfuttt level flyover res (RS. 2631 Grores (Rs. 2631 ot area of GHMC duly canceling Te roy the GHMC junction and Junctions (eu annuity mode, The expendnure Ww Budget missioner samont after earefu examination of the proposal of Com! B_,Sowernment after care ang muri! corporation, Hyderabad, Special Offices, Greater Hyderabat ate atirin the reference 3” read above, nereby accord ee ee inetions wth 2 mencludng cost) as supersession of 0) administrative outlay of Rs proposed in the Indifferent packages ond also permission to acquire t simultaneous'y. duly meeting the expenditure © Tis order Issues with the concurrence vide Spl. €.S. to Govt., Finance Bepartment reshi No.677/Spl. C5/2015, Dated: 8.9.2015. (BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA) M.G.GOPAL PRINCIPAL SECRETARY TO GOVERNMENT & Gre: \eredod Municipal Corporation, Hyderabad, The P. ” sree to Prncips| Secretary te Chlef Minister The P'S. to Chiet Secretary to Government Tne P'S to Special Caf Secretary ccretary, Finance Department The evepoiten Commusionery —’ Nn nu> Depersmen Tiycerabog Hetropoltan Bevélapment Author, Hyderabad whehabodoe // FORWARDED :: BY ORDER // Joe GOVERNMENT OF TELANGANA ABSTRACT ‘NWA & UD Department - GHMC — Strategie Road Development Programme - Engineering Procurement and Construction (EPC) System - Tenders for the work of "Construction of mmultlevell Grace Separators at four junctions at LB Nagar and surroundings in. Hyderabad ender Engineering Procurement and Construction (EPC) -Turnkey” ~ (Packagerll) - Approved = Orders ~ Issued ; MUNICIPAL ADMINISTRATION & URBAN DEVELOPMENT (F) DEPARTMENT SO. Ms. No.t6 Dated: 08-01-2016 -Read the following:- } |. GO. Ms No, 504, MA & UD (A1) Depariment, ated: 12.7.2007 Govt. Memo, No. 2192/11/2008, MA BUD Depi.. dt 13 3.2008. GO. Ms, No. 121, MA &UD (F2) Department, dated: 6-9-2015 * From the Commissioner & Special Officer, GHMC, Hyderabad, Lr No. SE(P-WZ)IGHMCI 2015-16 cated, .1 2016 O20. GO 3° read above, orders havs been issued according administrative sanction onsisting Flyovers / Junctions with an outlay of Rs 2631 crores for civ worke

You might also like