PROPOSED DESIGN, BUILD AND COMPLETE FOR THE ENTRANCE STATEMENT AT PLAYGROUND AREA,

PERSIARAN PUNCAK ISKANDAR 26/12, PUNCAK ISKANDAR, SERI ISKANDAR, PERAK


GENERAL CONDITIONS AND PRELIMINARIES BILLS OF QUANTITIES NO.1
ITEM DESCRIPTION
1.0 GENERAL
The Contractor shall insert in this summary of tender, the amount for individual items and sub-items as indicated.
Detasils of individuals items are as per "Section 1.0 - General Conditions and Preliminaries" of "Appendix A -
Specifications
Where the Contractor does not price an item or inserts a dash agaits any item in the Summary of Tender, the value
thereof will be deemed to be included in the rates contained elsewhere in the Summary Tender(s)
1.1 PROJECT PARTICULARS
1.1.1 Definitions
1.1.2 Scope of Works
1.1.3 Location of Site

1.2 GENERAL CONDITIONS


1.2.1 Generally
1.2.2 Fluctuations of Prices
1.2.3 Performance Bond

1.3 INSTRUCTION TO TENDERS


Item 1 General
Item 2 Tender Table Documents
Item 3 Obscurity of Meaning
Item 4 Failure to Communicate Notice of Discrepancy, Obscurity of Meaning
Item 5 Method of Biling
Item 6 Units of Measurement
Item 7 Pricing of Summary of Tender And Bills of Quantities
Item 8 Submission of Tenders
Item 9 Earnest Money
Item 10 Examination of Breakdown of Lump Sum Tenders
Item 11 Rationalisation and Mathematical Errors
Item 12 Star Rates
Item 13 Alternative Tenders
Item 14 Consultant's Certification
Item 15 Director Involvement
Item 16 Arbitration
Item 17 Letter of Acceptance

Carried to Collection:
PL/1
PROPOSED DESIGN, BUILD AND COMPLETE FOR THE ENTRANCE STATEMENT AT PLAYGROUND AREA,
PERSIARAN PUNCAK ISKANDAR 26/12, PUNCAK ISKANDAR, SERI ISKANDAR, PERAK
GENERAL CONDITIONS AND PRELIMINARIES BILLS OF QUANTITIES NO.1
ITEM DESCRIPTION
1.4 FORM OF CONTRACT
1.4.1 Conditions of Contract

1.4.2 Articles of Agreement


Article 1 Contractor's Obligations
Article 2 Contractor's Sum
Article 3 Architect
Article 4 Engineer
Article 5 Quantity Surveyor
Article 6 Specialist Consultant
Article 7 Definitions
Article 8 Meanings

1.4.3 Schedule of Conditions


Clause 1.0 Contractor's Obligations
Clause 2.0 Architect's Instruction
Clause 3.0 Contract Documents, Pogramme and As Built Drawings
Clause 4.0 Statutory Obligations, Notices, Fees and Charges
Clause 5.0 Levels and Setting Out Plan
Clause 6.0 Materials, Goods and Workmanship to Conform to
Description, Testing and Inspection
Clause 7.0 Royalties and Intellectual Property Rights
Clause 8.0 Site Agents
Clause 9.0 Acess to the Works
Clause 10.0 Site Staff
Clause 11.0 Variations, Provisional and Prime Cost Sums
Clause 12.0 Contract Bills
Clause 13.0 Contract Sum
Clause 14.0 Materials and Goods
Clause 15.0 Practical Completion and Defects Liability
Clause 16.0 Partial Possession by Employer
Clause 17.0 Assignment and Sub-Contracting
Clause 18.0 Injury to Persons Or Loss And/or Damage of
Property and Indemnity To Employer
Clause 19.0 Insurance Agiants Injury to Persons And Loss
And/or Damage of Property
Clause 20.0 A Insurance of New Buildings / Works - By The
Contractor
Clause 20.0 B Insurance of New Buildings / Works - By The
Employer
Clause 20.0 C Insurance of Existing Building or Extension - By
The Employer
Clause 21.0 Date of Commencement, Postponement and
Completion Date
Clause 22.0 Damages for Non-Completion
Clause 23.0 Extension of Time
Clause 24.0 Loss and / or Expense Caused By Matters Affecting
the Regular Progress of the Works
Clause 25.0 Determination of Contractor's Employement by Employer
Clause 26.0 Determination of Own EmployementCarriedbytoContractor
collection
PL/2
PROPOSED DESIGN, BUILD AND COMPLETE FOR THE ENTRANCE STATEMENT AT PLAYGROUND AREA,
PERSIARAN PUNCAK ISKANDAR 26/12, PUNCAK ISKANDAR, SERI ISKANDAR, PERAK
GENERAL CONDITIONS AND PRELIMINARIES BILLS OF QUANTITIES NO.1
Item DESCRIPTION
1.4 FORM OF CONTRACT (Cont'd)
1.4.4 Schedule Of Conditions (Cont'd)

Clause 28.0 Nominated Suppliers


Clause 29.0 Works by Craftsmen, Tradesmen or other Contractors Employed or Engaged by
Employer
Clause 30.0 Certicates and Payment
Clause 31.0 Outbreak of Hostilities
Clause 32.0 War Damage
Clause 33.0 Antiquites
Clause 34.0 Adjudicaton and Arbitration
Clause 35.0 Medication
Clause 36.0 Notice
Clause 37.0 Performance Bond
Clause 38.0 Governing Law
Clause 39.0 Quality Managment System

1.4.5 Law Governing Contract


1.5 SITE REQUIREMENTS
1.5.1 Visit to the Site
1.5.2 Site Inspection and Site Survey
1.5.3 Adjoining Properties
1.5.4 Acess and Egress
1.5.5 Site Management and Supervision - General
1.5.6 Site Management and Supervision - Site Agent
1.5.7 Site Management and Supervision - Contractor's Site Staff
1.5.8 Site Management and Supervison - Contractor's Technical Support to
Employer's Technical Project
Team
1.5.9 Working Hours
1.5.10 Labour - On- Class
1.5.11 Plant and Equipment
1.5.12 General Scaffolding and Staging
1.5.13 Existing Services
1.5.14 Existing Roads and Drains
1.5.15 Protection of Operatives, Site and Supervisory Staff, Member of the Public,
Existing Adjoining
Buildings, etc
1.5.16 Protection of the Works
1.5.17 Site Fire Preventation and Fire Fighting Facilities
1.5.18 Preventation of Slit into Watercource
1.5.19 Preventation of Earth Slopes
1.5.20 Security of Workds
1.5.21 Programme of Works
1.5.22 Site Meetings

Carried to Collection:
PL/3
PROPOSED DESIGN, BUILD AND COMPLETE FOR THE ENTRANCE STATEMENT AT PLAYGROUND AREA,
PERSIARAN PUNCAK ISKANDAR 26/12, PUNCAK ISKANDAR, SERI ISKANDAR, PERAK
GENERAL CONDITIONS AND PRELIMINARIES BILLS OF QUANTITIES NO.1
Item DESCRIPTION
1.5 SITE REQUIREMENTS (Cont'd)

1.5.23 Progress Report


1.5.24 Progress Photographs
1.5.25 Site Office and Temporary Buildings
1.5.26 Hoarding, Gates and Fencing
1.5.27 Signboard
1.5.28 Advertising
1.5.29 Telephone
1.5.30 Temporary Drainage
1.5.31 Temporary Lighting
1.5.32 Temporary Water For The Works
1.5.33 Temporary Electricity Supply
1.5.34 Reimbursement For Power Consumed By Sub-
Contractor
1.5.35 Restriction of Persons to Site
1.5.36 Liability For Nuisance
1.5.37 Noise Nuisance
1.5.38 Pollution
1.5.39 Traffic Congestion Around Site

1.6 LAW, REGULTIONS, LOCAL AUTHORITIES & GOVERNMENT


1.6.1 Permits And Licenses Required In Connection
With The Works
1.6.2 Requirements From The Construction Industry
Development Board (CIDB)
1.6.3 Custom Restrictions, Quotas And Duties, Etc.
1.6.4 Registration Of Workmen With Department Of
Labour
1.6.5 Foreign Workers And Specialists
1.6.6 Safety Measures
1.6.7 Police Requirement
1.6.8 Environment Protection
1.6.9 Factories And Machinery Act 1967 / Occupational
Safety and Health Act 1994
/Environmental Quality Act 1974
1.7 1.6.10 Contractor
COORDINATION Safety Performance
WITH OTHER PARTIES Incentive Scheme
1.7.1 Nominated Sub-Contractors
1.7.2 Nominated Suppliers
1.7.3 Co-ordination With Other Contractors Employed On
The Site
1.7.4 The Independent Contractors Or Craftsmen
1.7.5 Responsibility For Specialists Carried to Collection

Carried to Collection:
PL/4
PROPOSED DESIGN, BUILD AND COMPLETE FOR THE ENTRANCE STATEMENT AT PLAYGROUND AREA,
PERSIARAN PUNCAK ISKANDAR 26/12, PUNCAK ISKANDAR, SERI ISKANDAR, PERAK
GENERAL CONDITIONS AND PRELIMINARIES BILLS OF QUANTITIES NO.1
Item DESCRIPTION
1.8 OTHER MATTERS
1.8.1 Ordering Of Materials
1.8.2 Samples
1.8.3 Material Tests
1.8.4 Loading In Excess Of Design Load
1.8.5 Shop Drawings
1.8.6 Manufacturers' Warranties
1.8.7 As-built Drawings And Operating And Maintenance Instructions
1.8.8 Cleaning The Works And Handing Over
1.8.9 Leave Works Perfect
1.8.10 Supply of Materials
1.8.11 Deferment of Installation of Loose Or Dismountable Items

Carried to Collection:

COLLECTION:

Page BQ NO. 1 - 1/5


Page BQ NO. 1 - 2/5
Page BQ NO. 1 - 3/5
Page BQ NO. 1 - 4/5
Page BQ NO. 1 - 5/5

BILL NO. 1: CARRIED TO FINAL SUMMARY :


PL/5