7 Total cost of Project 162.86 2.90 4.36 7.26 116.47 12.94 9.11
Supreintending Engineer
Supreintending Engineer Uttarakhand Supreintending Engineer Irrigation Treasury Officer
Uttarakhand Jal Sansthan Circle
Pey Jal Nigam Haldwani Department Haldwani Haldwani(Nainital)
Haldwani
Page Nos. :-
(Amount in Lacs)
1 2 3 4 5
1 Distribution System 0.00 0.00 64.78
Community Contribution 5 %
on Sl. No. 4
2.05 2.05 4.09
Assistant Engineer
13
#REF!
Assistant Engineer
Page Nos. :-
Assistant Engineer
REVISED SETHI DHARKOT WATER SUPPLY SCHEME
Break up of Cost
S.N. Particulars Total Pipe line Building works Machinery works Miscellaneous
1 2 3 4 5 6 7
1 Intake works 798217.00 41296.00 756921.00 0.00
2 Storage reservoir 996154.00 0.00 713654.00 7500.00
3 Gravity main 2856666.00 2544142.00 276418.00 36106.00
4 Distribution system 6477954.00 5810753.00 434611.00 43547.00 -
5 Cartage of materials 2050767.00 2050767.00
Water & Materials Testing (2 sample of
6 water and 5 sample of pipes @Rs. 4480- 31360.00 31360.00
/Sample)
Expenditure on trail and testing (6 month
7 30100.00 30100.00
O&M cost.)
Sub total (A) from sl. 1to 8 14096218.00 9251191.00 2181604.00 87153.00 2112227.00
9 Contingencies @ 3.0% of Sub total (A) 397237.00 397237.00
DPR Preparation and Consultancy
10 135315.85 135315.85
Charges@1%
Total 14628770.85 9251191.00 2181604.00 87153.00 2644779.85
Total water supply cost in Lacs 146.29 92.51 21.82 0.87 26.45