Procurement Audit Checklist

This checklist monitors procurement processes within procuring entities to ensure they follow procurement manuals. It covers planning, documentation, advertising, evaluation, negotiations, contracting, payments and retention. The checklist contains 57 questions to assess compliance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views5 pages

Procurement Audit Checklist

This checklist monitors procurement processes within procuring entities to ensure they follow procurement manuals. It covers planning, documentation, advertising, evaluation, negotiations, contracting, payments and retention. The checklist contains 57 questions to assess compliance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Checklist for monitoring all procurement within the procuring entities

This checklist is based on the LWF/ DWS Procurement manual, for Goods, consultancies and works. The
checklist will act as a monitoring tool within a procuring entity to ensure that procurement processes are
carried out according to the laid down procurement manual.

Checklist item Y/N/NA Date/NA Comments

Planning the Procurement

1 Has the requirements from the user


been received?

2 Are the funds available/firm


commitments to meet the procurement?

3 Has the requirements been incorporated


in the Procurement Plan?

4 Has the general procurement Notice


been issued?

5 If it is non-competitive procurement
(i.e. emergency procurement, restricted
procurement or single source
procurement) has the report been sent to
HO/CR?

6 If it is an emergence procurement,
retrospective approval was thought from
the CR?

7 Have the specifications/ BoQ/


Drawings/ ToR been defined?

8 Has the procurement methods been


defined?

9 If it is an International or a National
competitive tender were requirements to
apply margin of preference in favour of
local firm observed?

10 Has consideration been given to


whether any specific procurement
policies apply such as consideration of
donor’s policy?

Preparing the Documentation

11 Have prequalification documents and


tender notice been approved by the PC?

12 Have competitive tendering procedures


been followed?

13 If Non Competitive procurement has


been used have the reasons been
Prepared by: Ganesh Bahadur KC (internal auditor)
Checklist for monitoring all procurement within the procuring entities
documented?

14 Has the tender number been allocated


prior to advertising?

15 Does the tender document provide all


the information necessary to enable
potential tenderers to prepare
appropriate submissions?

16 Has the evaluation creteria been


developed and approved before issuing
invitations?

17 Is a clear distinction made between


mandatory and desirable criteria?

18 Has an evaluation matrix been prepared


using appropriately weighted evaluation
criteria determined in the tender
documentation prior to advertising?

Advertising and Inviting

19 Did the advertisement get approval of


the Procurement Officer?

20 Is the advertisement place in the


newspapers of national circulation and
foreign or international publications or
trade journals in the case of
international tendering?

21 Has a copy of the advert been sent to


HO?

22 Was a policy on late or incorrect form


of submission stated in the invitation?

23 Are enquires, questions and


clarifications about the tendering
documented passed onto potential
tenderers?

Tender Receipt and Opening

24 Are tenders received in a locked tender


box/secure place?

25 Are the tenders opened only after the


closing time?

26 Are the tenders opened in accordance


with the procedures specified in the
tender documents?

27 Are the tender details recorded on a


Tender Opening summary Sheet?

Prepared by: Ganesh Bahadur KC (internal auditor)


Checklist for monitoring all procurement within the procuring entities
28 Were the receipts issued for tenders?

29 Are the original tenders and summary


sheet kept securely?

Evaluation and Assessment

30 Are the officers evaluating the tenders


authorised to do so?

31 For goods, works and non consultancy


services, are the evaluations performed
by a panel of three or more people (odd
number)?

32 For consultancy services, are the


evaluations performed by a panel of
three or more people (odd number)?

33 Are the tenders evaluated in accordance


with the criteria set in tender document?

34 Are all tasks, calculations, deliberations


during evaluation documented?

35 Was the evaluation report reviewed by


the PMU for review?

36 Was the evaluation report approved by


the PMU?

37 Was the evaluation report approved by


the PC?

Negotiations

38 Was the Negotiation Committee


appointed?

39 Were the results clearly agreed upon by


both parties to the negotiations?

40 Were the negotiations adequately


recorded and signed by both parties?

41 Have the negotiations results been


approved?

42 Are unsuccessful tenders notified


accordingly?

Monitoring the Contract

43 Did the PC review the contract?

44 Has the contract been signed by


someone with appropriate authority?

Prepared by: Ganesh Bahadur KC (internal auditor)


Checklist for monitoring all procurement within the procuring entities
45 Was the contract properly witnessed?

46 Have the contract details been entered


into Contract Register?

47 Has the copy of the letter of award and


contract been sent to:

(i) HO?

(ii) The Technical Audit Unit or


management committee?

48 Have the necessary security Been


obtained from the insurance policies
certificates, etc. contractor?

49 Have the necessary security insurance


policies certificates, etc. been obtained
from the contractor?

50 Have the processes, data used and


conclusions of contract performance
been fully documented?

51 Has the end user been involved in the


review of contract performance?

Progress Payments and retentions

52 Are progress payments appropriately


approved?

53 Are progress payments backed up with


an evaluation of performance, stage of
completion etc?

54 Are progress payments paid on time?

55 Does the entity hold the appropriate


retention from payments in accordance
with the contract?

56 Has the performance security been


appropriate released when the
contractor has been paid all moneys
excluding retention?

57 Have retention moneys as specified in


the specific conditions of contracts,
been deducted from payments to the
contractor?

58 Were there any variations in the


contract?

59 If there were variations in the contract,


were they approved by the CR?

Prepared by: Ganesh Bahadur KC (internal auditor)


Checklist for monitoring all procurement within the procuring entities

Prepared by: Ganesh Bahadur KC (internal auditor)