You are on page 1of 6
THAI ROTARY ENGINEERING PUBLIC COMPANY LIMITED INSPECTION AND TEST PLAN FOR PIPING 21 NG m8 RETURN STATUS. (a) REET (2) COMMENT 10 (3) APPROVED WITH COMMENT (4) APPROVED / NO COMMENT Restated mate developed alee bythe sp InevreweD/ |coMMENTED By: loare: FOR APPROVAL ee THAI TANK TERMINAL LIMITED PROJECT TITLE: PO & POLYOLS PROJECT CONTRACTOR: Re THAI ROTARY ENGINEERING PUBLIC COMPANY LIMITED ROTARY CLIENT PROJECT NO. : P-143 [ DOCUMENT NO 913-353 4 "| Proaect No. Puspsssi { aT deo LOTT Se Fey ° 20-aug-18 | wanchai | 20-Aug-13 | chanyut | 2o-aug-re | CJ#SSUED FOR | PAGE NO: REY. INTIAL : INTIAL INTIAL 1oF6 [ROC | maveey | ANTAL | cao ey | INTIAL | app: pey | TNTEAE PurPose Sheet No.: 2 of 6 Project No. : P11P3351 INSPECTION AND TEST PLAN FOR PIPING TREL Doc. No, : 9-13-353 Date: 20-aug-18 | Rev.Now: 0 REVISION LOG REV.NO. —_REV.DATE REVISED PAGE/S REVISION DESCRIPTION 0 20-Aug-18 - ISSUED FOR APPROVAL INSPECTION AND TEST PLAN FOR PIPING rovcr name ; FO 8 POLYOLS PROVECTPROIECT fret voc to (ev 9419359 Revo foo nos riraasa paso we owner : THAI TANK TERMINAL LIMITED [Project No.: P-143_ litem Name: Piping Sytem [enrcor Tal Rotary Ergneering Pubic Company ned Desln Coos ASHE s.3-20i6 Eaton [ete 20-H00 18 frask]| ACTIVITY / process ‘QUALITY CONTROL / PROCEDURE ACCEPTANCE ‘QUALTTY SURVEILLANCE | ane No pescriPrion MANUFACTURING ACTIVITY ‘women STANDARD TREL@O) 77 gS] we on controt oocument coo _[srcnaTune | cove _[arenarune| 7 Joesign& caeaation lstattion and orang a contro vate Ping cacao Datasheet 8 8 lo) Fiow Transmitter Approve fo: Canstracton ASME 31.3 R R 2 [pre tepection Meating ln aeview Purchase Order " 4 Joma sninaten 8 c€ | poetapcenon : 7 a Sete inspection coerdnation “ " 3 [mater = 341 fincning Matera impaction |) Damage Inspection purchase Order # sw onros ater nd mn Cerscte i z [erator and even |. roe Harting and iereieaten | AODoWe or Construction “ ow ‘nme ASME Pon AC vert Surtace rsh o Fange i [According Specification eens = ev Se aa Condon * sw seca soer 2 Pasive teal entation tet | ye ter! aetenten sa [Pon er stanesstet JEL Par ta prhet spar or |PostweNatera eNERRES) ye yc * ow Pot Reports i mato eee verity Meet Cade & Specification 4 Ming Proc 7 Mest cade & Seca ay wes war procedure sie 1 8 rsa 5 [Welder & Quettcation List |vony Met Cade & Speciation vEe eee ae women cera la) wor & 4 WR weg © abvication rene a3 b via napection for ive and Compance mt asroved | a Ieinaieat no anor owe eae pooroved owe Pra. 3084.2 : [c) Edge prepe of ASME B 31.3 " “ ld) Joints fit-up & alignment check a a OAT # sw QAP-03 OF ASME'B 313 INSPECTION AND TEST PLAN FOR PIPING rt tara inn SI froject nome > & POLYOLS PROVECTRODECT Fret Ow. No Rev 9-13-82. nev.o po no: pasea2st psc sore JOwner ; THAT TANK TERMINAL LIMITED. z [Project No.: P-143, litem Name : Piping Sytem [coeector Thal Rotary Engineering PublE Company Unied Design code” ASME 8515-2016 Cation [owe ? 0-AWDS Frasi| ACTIVITY / pRocESS: ‘QUALITY CONTROL / ‘PROCEDURE (ACCEPTANCE: ‘QUALITY SURVEILLANCE | REMARK No. DEseniPrioN NanuracruRiNe ACTIVITY ‘Nunaen STANDARD REL (eo) 77 gs) os oR CONTROL DOCUMENT cove_| stonaTune | cone _|SiGNATURE! ea aie Taspecion Ad Yet Procedure] Camplance wah the RPE], 62 [we ) Control of Electrodes and Rod rode oat ow welder conta ae pre WL Welang Procedre sw lowering | wes ewe porasaesotacnena.a | sw mons 2) visual Check ater weld x ow 7 |nor tor Piping vara.38.5.1 of ASME B.31.3 b.1 2o%Rron aust weld a) Radogrannie tet / package noe Procedure "acceptance enteria Normal’ | R ® Br Reporte Category Mud Service 2 pass at wed one (by |Posive materia densteaton testo ae ‘ z i |TREL) [Stainless steel / package = 7 1 |pniming or pipes Supoort Seeecrrecanea i 4 swim ert aileen napa ly Dimension heck alow FC orawing| APCHIN Ad Tes Procedare # w anos 10, [release Notes Just number ow SO daming Drawing Fe Drawing Fe " « ers 1 [Qe Bossier Jo watery seer ® ® Report by wor Rept roning IF crewing I ‘ at lc Painting enor Pipes Sunort) R pot 12 | Filed erection 124 |reup semanion cack / Wes, weir, | "HPAON And Test Pacedire| Complance win Approved | ae | pro» WS, Welder, For ing WG. isual inspection for pipe and fitting Je preparation ane apne # Ww lo visual inspecton forppe and fing | Gage pre oe s le ge peeparaton Aoproved ONG. Para.328-4.2) sw ts fit-up & alignment check een hee pail Ww ?- [ros eae ecanonane oF ASME B 31.3 ‘ i nen Sahn Jy coa oecnoes wre was (PRO RETR eI Ce TE TSRE | or ly welders control as pre Wilding Procedure " ) Weld 1 as pre WQL ‘Specification a lo wetsng ws & wre varaszeserasneo3i.3 | ow lor vst check er wets 4 ow INSPECTION AND TEST PLAN FOR PIPING ane eta Cm ne [ED from name FO 8 POLYOLS PRONECTPRONECT Fret voc wo / nev: 93359 Revo foo ne. pneaasi fue: sore [bwnar THA Tne TERMINAL UTED project nos Item Rare Ping Sem [crtractr Toi Rotary Engineering Pubic Company United [Desen Code 7 ASHE 831.3 2016 Faien [ome > PO-muG-1O Trask] ACTIVITY / process ‘QUALITY CONTROL / ProceouRe TCCEPTANCE ‘QUALITY SURVEILLANCE | rane No. DescrirrzoN awuracTunING aCTIVITY NuMoen STANDARD REL (20) 1 Pa on conrRoL DOCUMENT cove | stowaTune | cone _|SinaTure| [Rena cocoa ord vin, vcs apacion ev pe and ang Tonpiance win Powered | = 123 [dang tae no ) al napecon for ip ana tng a 3 Ta [ten Destructive ramaton oer ATES 7 a a 12-4 |welding Se ti 3 rs 13 Pipes support ee a oar tsomten arose msn tn epoved | co wes, wie, 4 sw 7a [wo Jn) Conta af ocrodes ond Rod a ow |b) Welder's contro! as pre WOL Sela teens 4 — oe Inspection And Test Procedure ‘Specification ~~ la wetang enn poras28SorAsme B313 | H sw le vst check ter wes " ow 133 [NOT for Pes Support a) 100% vr at we Jay vist check ster wea nocrecedre | mmaetsiotasuensta | 4 ow “a ine check tol Toomebi= Ta a Corance wi Aroved | z a [Drawing = DWG.8 ASME B31.3. = ape a i Campin wt aoroved | 5 7 [punch A cleared Vaal 8 Owen Awe oor aos ecard 16 aegby erg ORO org " * Anas 17. |Pre-Flushin leanir Tee S iat | | site ae we Report lpre-Fushing& cleaning cea Taied a Sernsneesa | A 00 18 [Prossure Tost bo ioaronae Totrate rst and fushng} THEDSSOTASHEBSLS |W 7 mrs > cove eatraton racers lo Presuore Recorder inal Flushing & Cleaning Hydostate Test And Fisting | re 345 of 8 wa Report 19 [Fina rushing & clean roma Test 0 FUNG | Tale 345 of ASHE B33 ‘ ao [feintatement toiow eometic | ua napeton rowing | orwing " w ra 21 [eoninaToraveof mange aoint | vivo! napecton rowing " sw 32 fleskrest teal check rang 4 w INSPECTION AND TEST PLAN FOR PIPING "alsin Pa Camper Late RS Jeroiect Name : PO & POLYOLS PRODECTPRORECT [rest Dee. No / Rev 913-353 Revo hob no. : aP3351 Pace: 60r6 [Gomer THAT TANK TERMINAL LIMITED Project Nox PaaS Rem Name Piping Sytem lnore a+ Sw: Soot Wess Point Monta (or Observe) as — [contractor = Thai Rotory Engineering Puble Company Umited [Design Code» ASME €31.3-2016 cation [one 20-Aug-18 Task] ACTIVITY / PROCESS (QUALITY CONTROL / PROCEDURE, ‘ACCEPTANCE, (QUALITY SURVEILLANCE | REMARK No. DESCRIPTION MANUFACTURING ACTIVITY NUMBER STANDARD TREL (@0) 17 g] oo (oR CONTROL DOCUMENT cope | stanarure | cove [SIGNATURE 23, [Touch up Painting for Pipes ‘Surface Preparation And i on a [Suuport Painting Procecure oa ow 24 [insulation instalation ‘visual inspection Tein Taal 0 (sashimi sweet procedure for piping / TTP u su 25 [Final Punch List (B,C) Package Testing 4 wR roe 26 [wor Drawing H R Jove an Review Oocument Reviewed By, ‘approved BY Ww: Whness Pent (** ) Hs Holding Point == ) eae Hage ‘Shall Naty min. 3 Working Days ‘28 PTREUs Inepection and Test Form

You might also like