mums INSTRUCTIONS FOR OPERATING sums
®
Pioneer
XHD FEEDERS
Printed in U. S.A.DETERMINING DIRECTIONS
DETERMINE RIGHT AND LEFT SIDES OF THE FEEDER BY STANDING AT THE REAR (RECEIVING
END) AND FACING THE DIRECTION OF THE FLOW OF MATERIAL.
NOTE: THIS METHOD 1S CONTRARY TO THE ONE USED FOR JAW CRUSHERS WHERE THE
OPERATOR DETERMINES DIRECTIONS BY STANOING SEHINO THE TENSION SPRINGS,
WHICH IN MOST CASES OPPOSES THE DIRECTION OF THE FLOW OF MATERIAL.
Rigut Sioe
FIG. 1. XHO Feeoer
Tor View Front Rear
Lert Sioe
Fic. 3
2 Cuains & Impact Beam
Ow 48" Wie Fevers,
FIG. 2. Paus BoLteo To CHain
Fig. 4
3 Chains on 60" & 72"
WIoe FreepersDESCRIPTION
Pioneer XHD (ExtRa Heavy Duty) FEEDERS RUGGED DESIGN PROVIDES THE EXTRA STRENGTH
NEEDED TO HANDLE PRIMARY CRUSHER FEED MATERIAL, THE FEEDER PANS AND END FLANGES
OVERLAP TO MINIMIZE SPILLAGE. THE PANS BOLT TO HIGH STRENGTH TRACTOR TYPE cuains
(Fic. 2) wich wave SEALED FINS AND BUSHINGS THAT ARE REVERSIOLE FOR LowcER canvn
tire. Freepers 48" wide Have 2 chains aNo A CENTER ImpACT Beam (Fic, 3)_To Minimize
Pan DEFLECTION, WHILE £0" ano 72" wive FeepeRs use 3 cuains (Fic. 4), Teacron vyce
UPPER ROLLERS (FIG. 5), MOUNTED IN PAIRS FoR EASIER REMOVAL, SUPPORT THE PAN CHAIN
at 12" SPACINGS IN THE IMPACT ZONE, WITH THE BALANCE OF THE ROLLERS AT Exeanoey
SPACINGS.
FIG. 5. Upper Rotters
HEAD AND TAIL SHAFTS USE BABBITTED PILLOW BLOCKS BUT WITH ANTI-FRICTION BEARINGS
AS AN OPTION, THE COUNTERSHAFT AND LOWER ROLLER SHAFTS USE ANTI-FRICTION PILLOW
BLOCKS AS STANDARD. UPPER FOLLERS HAVE BRONZE CUSHING WHICH ARE PERMENENTLY
LUBRICATED BY THEIR OWN INTEGRAL OIL SUPPLY (See Pace 7). Heap SPROCKETS AND
varie wmeets (FIG. 6 & 7) HAVE BOLTED SEGMENTS FoR LONGER LIFE AND EASICR REMOVAL.
THE COUNTERSHAFT To HEADSHAFT GEAR AND PInioN ORIVE (Fia. 8), WITH OIL-TIGHT GUARD
(Fic. 9), mounts on crrucr THe Right sroe (Sranoano) om THE LEFT Side (OrtioNAL ),
THE OP IVE To THE COUNTERSHAFT SHOULD ALWAYS INCORPORATE A SHCAR-PIN HUB (Fle, IO)
OR SOME OTHER MEANS OF PROTECTION FOR THE DRIVE AND FEEDER MECHAWIoN.
THE FEEDER PAN CHAIN UNIFORMLY MOVES PIT MATERIAL OR CRUSHER RUN AT I5 TO 30 FPM.
THE STANDARD PAN SPEED 18 24 Fem FOR ALL SIZE FEEDERS AND WILL BE FURWISHED UNLESS
OTHERWISE SPECIFIED. HoRScroweR REQUIREMENTS (PAGE 4) ARE SASED ON THE FECDER
BEING opeRATED AT 15 TO 30 FeM, AT 15° INCLINE, AMD CARRYING MATERIAL WEIGHING
100 Ls PER cu rT AT A DEPTH EQUAL TO ONE-HALF THE FECOER WIDTH.
FIG. 6. Heap SprockersHORSEPOWER
1004/FTS MATERIAL MATERIAL HEIGHT-'s FEEDER MOTH » 159SLOPE, 20% SLIP WHOPPER SHEAR
“Ail ocd onloger S130 FP neeet
48" CAPACITY 264/529 TPH
60" CAPACITY 420/840 TPH
72" CAPACITY 613/1226 TPH
cx fice] Pro wore
Ne ie
sa
ho}
hs/20
23
F—}— fooa|
hoo
hs
hs/s0 FIG. 7. Tate Wrees
hsv2s
0 [|
50/40
os
0-75
FIG, 8 Pinto ANo Gear
INSTALLATION
MounT THE FEEDER IN A HORIZONTAL POSITION OR AT AN ANGLE, UP TO A MAXIMUM OF
18 DEGREES FROM HORIZONTAL. AT THE HIGHER ANGLES OF INCLINE SPECIAL PANS MAY
BE NECESSARY TO PREVENT THE MATERIAL FROM SLIPPING. IN ALL CASES, MOUNT THE
FEEOER SO THE SHAFTS ARE LEVEL IN A CROSSWISE DIRECTION.ADJUSTMENTS
FEEDER PAN CHAIN: AS THE CHAIN LENGTHENS DUE To WEAR, RETIGHTEN IT BY TAKING
UP PULL BOLTS ON TAILSHAFT BEARINGS (Fic. II). TIGHTEN CHAIN JUST ENOUGH TO
MINIMIZE SAG BETWEEN UPPER ROLLERS. ALSO CHECK FOR CLEARANCE BETWEEN PAN RETURN
LINE AND ANY HOPPER OR DRIVE SUPPORTS.
THE CHAIN'S USEFUL LIFE 18 OVER, WHEN THE TAKE UP REACHES ITS LIMIT, OR WHEW THE
CHAIN DOES NOT RIDE DOWN PROPERLY ON HEAD SPROCKET TEETH. THEW EITHER REPLACE
THE CHAIN OR OBTAIN ADDITIONAL LIFE FROM THE OLO CHAIN BY PRESSING OUT PINS AND
BUSHINGS, ROTATING THEM I80°.AND REINSTALLING. WHEN ASSEMEL ING CHAIN ONTO FECOER,
NOTE CORRECT DIRECTION IN FiG. 4,
IMPORTANT: WEN TAKING UP THE TAILSHAFT, KEEP IT PARALLEL TO THE HEADSHAFT so
THE PAN CHAIN RIDES SQUARELY OVER HEAD SPROCKETS AND TAIL wnECLS,
TAKING UP ONE SIDE OF THE TAILSHAFT MORE THAN THE OTHER SIDE WiLL
MAKE THE CHAIN RUN CROOKED CAUSING UNDUE WEAR ON SPROCKETS AND CHAIN.
FIG. 9. On Trawt
Gear Guaro
FIG. 10. SHEAR Pin Hue
ROLLER CHAIN RIVE: MAKE SURE SPROCKETS ARE IN ALIGNMENT AND ADUUST eHAIN TENS 108
SO CHAIN HAS A SLIGHT SAG ON THE SLACK SIDE. ADJUST CHAIN TENSION BY Removing
AOUUST ORES ee eeeie DRIVE assemaLy (Do Nor Suir Pinton CounTERSHarT AsseneLy).
SojuUST DRIVES EQUIPPED WITH A CHAIN IOLER BY BRINGING THE IDLER aGainet tue ccace
SIDE WuST TIGHT ENOUGH TO REMOVE THE WHI IN THE CHAIN. CHAINS THAT smite rman
segue TOO LOOSE CAUSE EXCESS WEAR AND VIBRATION. ALSO A LOOSE CHAIN way Jute A
cmon) CAUSING THE CHAIN TO COME OFF OR BREAK. CHAINS THAT ARE TOO TIGHT arSoLT In
SHORT CHAIN AND SPROCKET LIFE AND ADD UNDUE LOADS ON SHAFTS END BEAR Ines.
GEAR AND PINION: Move COUNTERSHATT UNTIL PINION AND GEAR TEETH ARE IN PROPER MESH.
AVOID HOVING THE WEADSHAFT To OBTAIN THIS ALIGNHENT UNLESS ABSOLUTELY neceoccae
PRCAUSE THIS WILL AFFECT FEEDER CHAIN ADJUSTMENT. MAKE SURE BOTH Harts ac
Panter tye ee SSUARE MESHING AND CHECK WITH FEELER GAUGE ON BOTH Sines oF Geane
Rene INTERFACE. PROPER MESH 15 WITH .029" To .032" cLeaRance BETWEEN Teerne
RECHECK ALIGNMENT OF DRIVE 70 COUNTERSHAFT«KEEP KEYS AND BOLTS TIGHT: To INSURE PROPER ALIGNMENT OF SPROCKETS AND ROLLERS,
INSPECT AND TIGHTEN GIB HEAD TAPERED KEYS ANO BOLTS OAILY FOR THE FIRST WEEK OF
OPERATION, THEN AT REGULARLY SCHEDULED INTERVALS DEPENDING ON SEVERITY OF SERVICE
AND AS EXPERIENCE AND CONMON SENSE DICTATES,
FIG. 11, Puce Bours
MAINTENANCE
REPLACING FEEDER PANS: OpCRATE FEEDER DRIVE UNTIL PANS TO SE REPLACED ARE POSITIONED
BY THE TAILSHAFT. THIS WILL GIVE THE NECESSARY CLEARANCE FOR REMOVAL OF FIRST PAN
AND ALSO ROOM TO GET AT CENTER CHAIN IF FEEDER 1S SO EQUIPPED. ALWAYS USE NEW HEAT
TREATED CAPSCREWS WITH LOCKNUTS WHEN REINSTALLING PANS. USE OF DRIFT PUNCHES TO
ALIGN HOLES WILL SIMPLIFY INSTALLATION. AFTER NEW PANS ARE INSTALLED, CHECK THEM
IN OPERATION TO INSURE PROPER CLEARANCES.
REMOVING HEAD OR TAILSHAFTS: LOCATE MASTER LINKS ON CHAINS, IDENTIFIED ey A DIMPLE
ON END OF PIN. REMOVE TWO ADJACENT PANS OVER THESE PINS A5 EXPLAINCO ABOVE. Tusw
FEEDER ORIVE UNTIL THE EXPOSED CHAIN LINKS ARE ON THE TOP SIDE, NEAR THE SHAFT
BEING REMOVED. SLACK OFF TENSION ON THE PULL BOLTS (Fig. II) LocaTED AT FEEDER
TAILSHAFT. Block THE sHart (HEAD OR TAIL) NOT BEING REMOVED SO IT CAN NOT ROTATES
SUPPORT THE LOWER PORTION OF THE PAN CHAIN SO IT WILL HE SECURE WHEN DISCONNECTED,
DISCONNECT THE PAN CHAIN AT THE EXPOSED LINKS AND FOLD CHAIN BACK. BEFORE REMOVING
THE WEADSHAFT, THE GEAR, PINION, AND GEAR GUARD MUST ALSO Bf REMOVED. UNBOLT
BEARINGS AND REMOVE THE HEAD OR TAIL SHAFT ASSEMBLY.
AFTER REINSTALLING SHAFT, DE CERTAIN THAT THE ALIGNMENT OF ALL SHAFTS 1S conmECT AS
EXPLAINED PREVIOUSLY. THE HEADSHAFT 1S TO SE PERPENDICULAR TO FEEDER CENTERLINE,
USING SHIMS IF NECESSARY. ALSO HEAD SPROCKETS AND TAIL WHEELS ARE TO BE LocaTeO
ON CENTER LINE OF UPPER ROLLERS FOR PROPER TRACKING OF CHAIN, AND THEN KEYED 10
SHAFTS.REMOVING UPPER ROLLERS: REMOVE OUTSIDE ROLLERS TO REPLACE BUSHINGS ANO/oR StALS
WITHOUT DISCONNECTING THE PAN CHAIN. Do THIS BY SLACKING OFF ALL TENSION ON THE
TAILSHAFT PULL BOLTS AND BLOCKING UP PAN LINE OFF THE ROLLERS. REMOVE ROLLER
CLAMP BOLTS ON THE NEAR SIDE OF TWO ADJACENT ROLLERS, WHILE MERELY LooseNinc
THE CLAMP BOLTS ON THE ROLLERS FAR SIDE. UNBOLT AND REMOVE COMMON CHANNEL ON
THE NEAR SIDE AND LIFT our ROLLERS.
REMOVE CENTER ROLLERS ON FEEDERS EQUIPPED WITH A THIRD CHAIN, OY DISCONNECTING
THE PAN LINE (Ste PAGc 6) OR BY REMOVING ALL OF THE OUTSIDE ROLLERS ON ONE SiDC.
AFTER REBUILDING ROLLER, STAND ROLLER UP-RIGHT TO REFILL IT WITH LUBRICANT
(See Berow) ocrone ATTACHING ROLLER TO FEEDER. CHECK LUBRICANT LeveL eveRY 6
MONTHS. BEFORE SECURING ROLLERS TO FEEDER, CHECK ALIGNMENT OF ALL ROLLERS
WITH A STRAIGHT EDoe.
REPLACING SPROCKETS: WHEN HEAD SPROCKETS OR TAIL WHEELS BECOME WORN, REVERSE
OR REPLACE SEGMENTS BY ROTATING A SHAFT TO EXPOSE ONE SEGMENT. REMOVE BOLTS
ATTACHING SEGMENT TO THE HUB AND REVERSE OR REPLACE EXPOSED SEGMENT, REPEAT
PROCESS FOR OTHER SEGMENTS. WHEN REPLACING HEAD SPROCKETS, ALIGN SPROCKET
SEGMENTS TO GET EQUAL PULL ON ALL SPROCKET TEETH. DO THIS BY LOOSENING THE
BOLTS AND SHIFTING SEGMENTS SLIGHTLY TO OBTAIN PROPER TIMING. Some recoEns
WITH 3 CHAINS HAVE AN OPTIONAL THIRD SPROCKET.
LUBRICATION
LUBRICATION LuBe LUBRICANT AMOUNT. OF
POINT INTERVAL ABOVE 40°F BELOW 400F LUBRICANT
Bassitreo Ba, 8 Hours G2 ce FiLt Hous ina:
AFB Piitow BLK. 50 Hours G2 ce Fie Housine
Track Rouer Bro. PERMANENTLY
Luar icateo EP90 EPEO 90% oF Housina
Gear Guar ePi4o £30 To Port
LUBRICANT _INTERCHANGEABILITY LIST.
~~ STANDARD.
LUBRICANT PURE OIL TEXACO MOBILE AMOCO
Ge Poco HTEP MuttiFaK Mositux EF2 Amoco
#2 EPA oR Livsiun MP
MosiLecrease.