i
Mod_15_D SUPPLIER EVALUATION QUESTIONNAIRE Rev.01
1) GENERAL INFORMATION
lar Metal San, ve Tit St.
Company name: Ogul
address
A
3s: Gaziosmanpasa OSB Mah, 8 Street No:10 Alueylol/Bahkesir| i
City Babkesir County:Turkey
VAT number: 6340039022 Fiseal code: 10100 Share capital:
wig bk
Operative address |
‘Adress: Gaziosmanpasa OSB Mah, 8 Suse No:10 AlveyloVBalkesir
City Balkesir Country |
Tel, 902662811426 Fax |
Internet: www foreechain.com E-mail: esem@foreechain.com
stat
General Manager: Orcun Egiliogla Administrative DiectorOrgun Eginlioglu
= ‘Technical Director:Mithatcan Eginlioglu Sales Director: Ezgi Selguk |
Production Manager: Mithatcan Eginliogla Quality Assurance Manager‘erkcan Eginlioglu
2) COMPANY RESOURCES
Number of employees
Total 293, | Managing/Engincering 10 [Administrative'Commercial 168] Manufacturingl27 | Quality Assurance 10]
a
Pepa quipments and facilities (list hereunder and enclose a list) | 5
es 4
| ;
. 3) PRODUCTS/MATERIALS (list hereunder or enclose a list) |
4 |
-
4) REFERENCES |
fomers (list hereunder your most important customer and enclose alist) |
lance with our company policy, we keep customer and supplier information confidential ]
j ]
l
‘Suppliers list your current nost important suppliers and enclose a list)
‘Im accordance wth our company policy, we keep cusomer and supplier inform-ion onthdcauar j ]
ij
ri ae> Mod_15_D SUPPLIER EVALUATION QUESTIONNAIRE Rev.01
5) QUALITY ASSURANCE SYSTEM
yi Do you have you an operative Quality System? | 88 | No
According to what standards?
| Future plans regarding Quality Assurance
1s our Quay System cet?
PP resets ecencecn) Cencton Agency Cena mame
Would you be available to receive an inspection
visitby Aliot inspectors? Lal id
a The following procedures must be attached only if you have a Certified Quality System.
n. | Procedure name. ] Note
|_| ‘Supplier evaluation procedure tis included in our quality control processes.
2 | Quality contol procedure on incoming material Itis included in our quality control processes.
, Production procedure and related checks carried out during te | pg ee
a] tence oes Its included in our quality control process
4 | Quality contro! procedure on material hefore shipping tis included in our quality control processes. |
+
3_| List of instrumentation and machinery Its included in our quality control processes
| Questions [Noe
|_| Do you have a quality policy? ¥ES | No
2 eee [mal
3 | Ie Quay System in ecordanse aon [gpg | ng
4 | Has the Quality Manager been designed? wes | xo
5] ‘Do you make the review of als order and was | No
6 | Do you control your documentation? ‘MES | No
7_| Do you assess and select your suppliers? ‘es | No
8 | Do you have a list of qualified suppliers? ES | No
9 | Doyou check the incoming products? wes | No
BB | | can you acheveprodectimesbigy wus | No
11 | Do you control production process? 68 | No
12 | Do you make inspections on your product lots? | on 100% ‘on percent 100%
13 | Dezeu have te contol ofnoncontomning | was To
Page 2 of 3/Alioto,Group)
Mod_15_D SUPPLIER EVALUATION QUESTIONNAIRE Rev.01
14 | Do you make intemal quality inspections/audits? | 868 | NO
15 | Are measuring and test equipments available? | HES | NO
fe eer ates a
17 | Do you make intemal checking and tests? ed | epoca | inal
18 | Do you able issue Test Reports? ¥ES NO
19 | Do you issue Statements of Compliance? WES | No
Date
19.03.2090
Signature
CSS
Title
Gusiomee Zelatios Officer
$
Page 3 of 3