You are on page 1of 8
YourRef: ‘ourret: REPORT ON THE COMPRESSIVE STRENGTH OF CONCRETE CUBE PRODUCT TANK, JACK UP BASE -1&2 CAKASA NIGERIA COMPANY/AYM SHAFA FACILITY @ IFIE KPORO, WARRI, DELTA STATE Table of Content i. Cover Page li, Table of Content Test Summary iv, Jack - up Base I - Concrete Strength Test Certificate v. Jack - up Base Il - Concrete Strength Test Certificate vi. Photos vii, Recommendations Determination of Comprehensive Strength of Concrete Cubes Concrete Cube samples in Calibrate Mould of (150X150X150)mm 6no. Moulds are demould after 24hour of sampling from the batching concrete of the stated structures, cured for 7 days and 28days Age. its crushed at the due date to determine the cubes strength at 70% and 100% of age respectively twee 62 WITH ASSURANE LITY COMPLIANCE ore eve ut woe wre wn we 18 wn | oor zm | ew ae ‘orig | hema vanang | hme eve cere eon ‘ove 3e0| na ouvoo weoertoree ‘oyeuioju) SuNNSTID ‘1881 3090 313YON0O 40 AUVANS ‘3ano 3LYONO 40 HLBNAULS JAISSIYAMOD ANAMLY¥d30 TOLLNOD ALITVNO wopdioseq sraues Concrete Crashing Test Cerificate ‘QUALITY CONTROL DEPARTMENT edna Peta (Qandsix/ochaical mix) ceare Ae (hoe of ran): (Compaction et. te) 8S TAS. Fine Hee. (Tpe of erasig): SUMP Su0 Tested by ined. erst Rear TEST RESULTS 7 DAYS ate of casting: ate of Testing te va = Arerage Density: 240 wee ‘verge Steeneth: 26.5 we Mining Stroneth: Wa Test Remarks stisictory Testes os aire Ek hint: TEST RESULTS 28 AYS Pr vm Mrerage nity: 2.0 wee Concrete Crashing Test Ceti ‘QUALITY CONTROL DEPARTMENT cure: am saga rar feavaucroe: cast MICE company vve: _ om Mietaers, ar ‘ropertion ad Masred: WY WE TEST RESULTS ToAys em mie booty raat seme vee ca v Merge besitys 20 wed erate Strength: 26 mt Tested bys tire ke clint: TEST RESULTS 28 DAYS ate of cartngs 142-2003 ate of Testing: 11 on 2008 ty Strout: (mm Strength: 30.0 Mm st Remrisesabifactary RECOMMENDATION Sampling with a prescribed mould. li, Cure in a temperature regulated environment ili, Mix of Coarse aggregates and sand should be in an acceptable percentage and zone for concrete use iv, Use Sharp Sand with less Percentage Content of Silt/Clay Giro L. i 12th nvary, 2024 LEE Spectra Engineering Limited

You might also like