REPORT ON THE COMPRESSIVE STRENGTH OF
CONCRETE CUBE
PRODUCT TANK, JACK UP BASE -1&2
CAKASA NIGERIA COMPANY/AYM SHAFA
FACILITY
@ IFIE KPORO, WARRI, DELTA STATETable of Content
i. Cover Page
li, Table of Content
Test Summary
iv, Jack - up Base I - Concrete Strength Test Certificate
v. Jack - up Base Il - Concrete Strength Test Certificate
vi. Photos
vii, RecommendationsDetermination of Comprehensive Strength of Concrete Cubes
Concrete Cube samples in Calibrate Mould of
(150X150X150)mm
6no. Moulds are demould after 24hour of
sampling from the batching
concrete of the stated structures, cured for 7 days
and 28days Age.
its crushed at the due date to determine the cubes
strength at
70% and 100% of age respectively
twee 62 WITH ASSURANE LITY COMPLIANCEore eve ut
woe wre wn we 18
wn | oor zm | ew ae
‘orig | hema vanang | hme eve cere
eon ‘ove 3e0|
na
ouvoo
weoertoree
‘oyeuioju) SuNNSTID
‘1881 3090 313YON0O 40 AUVANS
‘3ano 3LYONO 40 HLBNAULS JAISSIYAMOD
ANAMLY¥d30 TOLLNOD ALITVNO
wopdioseq srauesConcrete Crashing Test Cerificate
‘QUALITY CONTROL DEPARTMENT
edna Peta
(Qandsix/ochaical mix) ceare Ae (hoe of ran):
(Compaction et. te) 8S TAS. Fine Hee. (Tpe of erasig): SUMP Su0
Tested by ined.
erst Rear
TEST RESULTS
7 DAYS
ate of casting: ate of Testing
te va =
Arerage Density: 240 wee ‘verge Steeneth: 26.5 we
Mining Stroneth: Wa
Test Remarks stisictory
Testes os aire Ek hint:
TEST RESULTS
28 AYS
Pr vm
Mrerage nity: 2.0 weeConcrete Crashing Test Ceti
‘QUALITY CONTROL DEPARTMENT
cure: am saga rar
feavaucroe: cast MICE company
vve: _ om Mietaers, ar
‘ropertion ad Masred: WY WE
TEST RESULTS
ToAys
em mie booty raat seme
vee ca v
Merge besitys 20 wed erate Strength: 26 mt
Tested bys tire ke clint:
TEST RESULTS
28 DAYS
ate of cartngs 142-2003 ate of Testing: 11 on 2008
ty
Strout:
(mm Strength: 30.0 Mm
st RemrisesabifactaryRECOMMENDATION
Sampling with a prescribed mould.
li, Cure in a temperature regulated environment
ili, Mix of Coarse aggregates and sand should be in an acceptable percentage and zone
for concrete use
iv, Use Sharp Sand with less Percentage Content of Silt/Clay
Giro L. i
12th
nvary, 2024
LEE Spectra Engineering Limited