You are on page 1of 1

KEY PLAN

A L
QIB

Jalan Soekar
N

no - Hatta
Jalan Arjuna

Y 9185100 VILLAGE
JALAN STREET
KAMPUNG
4
3

12500
GSB 12,5 M
NOTE & LEGEND
DISCLAIMER:
DRAWING SHOWS IS NOT A SHOPDRAWING:

GSB 10 M
GSB 12,5 M
INFORMATION DEPICTED IS SUBJECT TO CLIENT AND A/E APPROVAL IN
SUBMITTALS ISSUED BY THE CONTRACTOR IN THE PRE-CONSTRUCTION
12500
PROCESS.
APPROVED SUBMITTALS SHALL BE SUBJECT TO FIELD-VERIFICATION BY THE
ENGINEER PRIOR TO INSTALLATION ON-SITE.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
PHASE 4
FINISHED G ALL LEVEL ARE IN METERS UNLESS NOTED OTHERWISE.
OODS WAR BD-12
E HOUSE

SITE LOCATION :
RUANG
EET

POMPA ADDRESS : Jl. SOEKARNO HATTA, Dk. BRAJAN RT 01/RW 04


KEL. NOBOREJO / KEC. ARGOMULYO
VILLAGE STR

SALATIGA, CENTRAL JAVA


BD-10 AREA : +/- 32.935 M2
OHB

X = 446154.31 GEOGRAPHIC COORDINATES : -7.373586, 110.514702


Y = 9185017.08
SR-9
A
PARKIR TOPOGRAPHIC COORDINATES :
BD-16 CNG
6225

X = 446464.48
B 5 Y = 9184996.88
8700

OHB
C
40000
EL. -1.037
Ramp 1:14 22000
WWTP PEDESTRIAN
Outdoor
8700

(IPAL)
Ramp 1:14

Hydrant Box

RUMIJA
PEDESTRIAN

GSB
SR-8

40 M
SIAMESE

22 M
Y 9185000

TO SEMARAN
OHB
OHB CONNECTION

SR-7 BD-14
17 18
Parkir mob
il Pemadam

14 15 16 6
6x15m
SR-6
8700

BD-9
Ramp 1:14
PHASE SR-5 OHB
E PRODUCTIO 3

10000
PEDESTRIAN

N FACIL SR-4 BD-6


ITY BD-17 SMALL VEHICLE
B
RTH
8700

ENTRY/EXIT

G
FUTURE PHASE 10 M
PRODUCTIO 2

PEDESTRIAN
F

G (16)
WWTP AUDITORIU
N FACILITY KAPASITAS M

CAR PARKIN

G (12)
(IPAL)

(12)
380 ORANG

G
CAR PARKIN
BD-1 BD-5

CAR PARKIN
Ramp 1:14

G (16)
EL. +1.000

SOEKARNO HA
RIA
STAFF - MO Ramp 1:14
TOR

EST
CAR PARKIN
CYCLE

PED
BD-4
PEDESTRIA
PARKING (7 N
GSB 30 M 1)

EL. +0.000
AREA ASEMBLY
BONGKAR
MUAT LOBI
POINT
X = 446137.82 A
PEDESTRIAN

Y = 9184955.24 BD-8 ASEMBLY


PARKIR
EL. +0.000

TTA STREET
TRUK (2)
RUMIJA 18 STAFF - CA
POINT R
2 OHB
M PARKING (5
6)
30000

SUTM 20kV
Ramp 1:14 RUANG
- = REVISION MARK = REVISION CLOUD
SR-1 RAPAT
PEDESTRIAN
PEDESTRIAN

OBIL (15)
18000

PEDESTRIAN
EL. +1.442
FENCE
SR-2
PEDESTRIAN
PEDESTRIAN

3 OHB

PARKIR - M
1
EXIT TRUC
K
2 EL. -1.050 Parkir mob
il Pemadam
6x15m Ramp 1:14
BD-7 EL. +0.000 OHB
SR-3
STREET
CENTRE
Ramp 1:14 Parkir mob
il Pemadam
6x15m
LINE
OHB
Ra
SIAMESE mp
CONNECTION 1:1
ARJUNA ST

SURAKARTA
4
PARKIR - M
REET

TO SURAKARTA
OBIL (24)

A FIRST ISSUED
EL. +0.000
1
JALAN
X 446100

18000
INDUST
X 446200

27000 9000
ENTRANCE RI
50000 TRUCK EL. -0.407

1 77000 10600
4 6
33000

Y 9184900 7 43600

12 13
19 CIVIL = EL. + 745.500 A 07-07-2023 KIN TM HMJ
CHECKED BY: APPROVED BY :
EA BN IFT

ARS = EL. ± 0.000 REV. DATE CLIENT ISSUANCE


PLAN - SITE
Drafter Sr. Eng. Eng. MgrProj. Mgr
NO. DESKRIPSI NO. NAMA BANGUNAN CLIENT :
SCALE1 : 600
SR-1 SUMUR RESAPAN-1 KAPASITAS 15 M3 DIM. 3x2x2,5 M BD-1 BD-1 PRODUKSI (PABRIK)
SR-2 SUMUR RESAPAN-2 KAPASITAS 15 M3 DIM. 3x2x2,5 M
SR-3 SUMUR RESAPAN-3 KAPASITAS 15 M3 DIM. 3x2x2,5 M
BD-2 BD-2 GUDANG (RENCANA) UNTUK TEMPAT PARKIR
SR-4 SUMUR RESAPAN-4 KAPASITAS 15 M3 DIM. 3x2x2,5 M SEMENTARA (KENDARAAN KARYAWAN) PT. Erlangga Edi Laboratories
SR-5 SUMUR RESAPAN-5 KAPASITAS 11,25 M3 DIM. 3x1,5x2,5 M BD-3 BD-3 BANGUNAN UTILITAS CONSULTANT : PT TeamworX Indonesia
Beltway Office Park
SR-6 SUMUR RESAPAN-6 KAPASITAS 11,25 M3 DIM. 3x1,5x2,5 M BD-4 BD-4 AREA LOBBY
TeamworX
Building C, Ground Floor
SR-7 SUMUR RESAPAN-7 KAPASITAS 11,25 M3 DIM. 3x1,5x2,5 M Jl. TB. Simatupang No. 41, Cilandak

SR-8 SUMUR RESAPAN-8 KAPASITAS 11,25 M3 DIM. 3x1,5x2,5 M BD-5 BD-5 AUDITORIUM Jakarta Selatan 12550 - INDONESIA
Phone : +62 21 780 0940
SR-9 SUMUR RESAPAN-9 KAPASITAS 115 M3 DIM. 3x2x2,5 M BD-6 BD-6 POS JAGA 1 Fax : +62 21 789 2151
Website : www.teamworx.co.id

BD-7 BD-7 POS JAGA 2 PROJECT TITLE :

BD-8 BD-8 POS JAGA 3


EPCM Services for New Facility
BD-9 BD-9 WWTP (IPAL)
Expansion Project at Salatiga
BD-10 BD-10 SHELTER CNG
BD-11 BD-11 TANGKI AIR BAHAN BAKU DRAWING TITLE :
SCALE
0. GENERAL - PHASE 1A
BD-12 BD-12 RUANG POMPA PLAN - SITE
PLOT
1:1
BD-13 BD-13 TANGKI AIR PEMADAM KEBAKARAN
BD-14 BD-14 GARDU PLN
BD-16 BD-16 GUDANG LIMBAH B3 DRAWING NUMBER :
4217-CSD-A-1A-0101-RA
BD-17 BD-17 KANTIN
THIS DRAWING IS PROPERTY OF PT. TEAMWORX INDONESIA AND IS SUBJECT TO at A1
COPYRIGHT

You might also like