You are on page 1of 8
GST NO: 29A0WPY3016Q1ZP- PRISM =o engineers & constructions MAHALAKSHMI ARCADE WwW TUMAKURU-S72102 MOB: 7411706003. DETAILED ESTIMATION yr OF WORK # Ome DETAILED ESTIMATED FOR PROPOSED CONSTRUCTION OF RESIDENTIAL BUILDING ON WARD NO:01, SY NO:64/20, PID NO: 119215 AT HONNENAHALLI VILLAGE ,KASABA HO, TUMKUR - IN FAVOR OF B K MUKHYAPRANA DETAILS. 2 7 KSRB 2-22: Earthwork excavation for foundation of Buildings, culverts, water supply. sanitary lines and electrical conduits either in pits or in trenches 1.5m and above in saath, lr ordinary soil not exceeding 1.5m, in depth including dressing the bottom and Sides of pis and trenches, stacking the excavated soil clear from edges of excavation with lead Upto 50m.after breaking of clods complete as per specification. (page No. 51 No 2.3) PWD SR -2023-24 Columns 3 150 150 180 1215 Walls 1 4560 0.90 060 __824 ‘cum 20.36 _ 186.00 3787.00 5 KSRB 422: Providing and laying in position plain reinforeed concrete of mix M20 with OPC cement @ 320 kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.878cum and fine aggregates @ 0.459cum, with Superplastisiser @ Sits confirming to {69103-1990 Reaffrmed-2008, machine mixed concrete laid in layersnot exceeding 15cms thick, vibrated for all works in foundation plinth and ground ffoor level for roof slabs, staircase, lintess, retaining walls return ‘wails, wall (any thickness) including attached plasters, columns, piers, abutments pillars, posts, struts, buttresses, string oF lacingcourses, parapets, coping, bed blocks, anchor blocks, plain window cils, filets etc., including cost of all materials, labour, HOM of machinery, curing complete as per specification, (page No 131 No4.11) PWD S.R -2023-24 Columns 1st footing Footing 3 150 150 045 304 For Columns 3 023 045 1245 __387 690 6268.00 43407.00 Plinth Beam 1 7856 023 060 10.84 cum 10.84 5892.00 63877.00 Lintel 1 22 023 015 Cum 5892.00 4472.00 1 2 023 0.15 cum 5952.00 411.00 Sqm 46 440.00 4910.00 @ KSRB 4.9.2: Providing TMT steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position lapping and/or welding wherever required, tying with binding wire and anchoring to the adjoining members Wherever necessary complete as per design (laps and wastage shall not be measured paid) cost of materials, labour, HOM of machinery complete as per specifications. PWD SR -2023-24 690 20000 138065 Footing & Columns Plinth 10.84 200.00 2168.26 Lintel 083 200,00 165.60 Beams 15.34 200,00 306629 Roof 37,91 200.00 7581.00 Chejja 14.16 200,00 _2232.00 16595.79 Tonne 16.60 7171400 1190151.00 9 KSRB 4.6.7: Providing and removing centering, shuttering, strutting, propping etc. ‘and removal of form work for sides and soffis of beams, beam haunchings, Cantiever girders, bressumers and lintels not exceeding 1m in depth including Cost of all materials, labour complete as per specification. (page No 17 | No4 34) PWD SR -2023-24 Plinth 1 7856 030 __23.57 ‘Sqm 23.57 292.00 6882.00 Lintel 1 2200 015 330 1 2.00 015 3 075 023 075 0.39 7464.00 142844.00 cum First Floor 1 1457 023 275 922 Deduction 3 090 023 210 1.30 4 180 023 135 224 cum 7464.00 42364.00 14 KSRB 94-3 : Providing Matti / Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves ( excluding cost of cement concrete and side clamps ), but including cost of materials, labour, HOM of machineries complete as per specifications, Specification No, KBS 9.32 P 45 Ino9.12 PWD S.R -2023-24 4 230 015 01 0.14 5 180 015 O01 0.14 0.27 7344.00 20569.00 KSRB 9-7 1: Providing and fixing in position fully panelled Honne wood shutters for doors, styles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail ‘and styles 100mm wide as per drawing and panels of 25mm thick including cost of ‘materials, labour, HOM of machineries complete as per specifications. ( excluding cost of fixtures ) Specification No, KBS 9.34 (page 56, I.No. 9.20) PWD S.R -2023-24 15 1 1.05 240° 221 4 090 210 7.56 1 075 240 © 1.58 11.34 $973.00 .2B15-3.4: Providing 15mm thick certs masonry including rounding removing scaffolding, including cost of teats. (page NO 109 No 15.14)PWO S.R 2023-24 18 KSI 1:6, to brict fendering: Providing and Caring complete as per spec Allround out side 1 3368 10.88 366.44 8 0.92 10.88 80.08 Chejja 17 1.80 4.20 _ 36.72 48324 Deduction Dp 1 105 210 2.21 4 090 210 © 7.56 3 075 210 4.73 w 17 075 075 (9.86 24.05. Sqm 474.24, 321.00 151258.00 49 KSRB1S-37; Providing 18mm thick cement plaster 9 single coat with cement mortar te te brick masonry including rounding of comers wheney required smooth ie jenng,, Providing and removing scaffolding, inceing cost of materials, [abour, Giang complete as per specifications. (page NO 110! No 15.17) PWD SR -2023-24 Inside 4 100 3.00 __ 3.00 3. 313.00 939.00 1 150 1.47 2.24 1 199 1.50 2.90 21.49 380.00 8166.00 1 300 3.00 9.00 1 360 412 14.83, 1 395 4.12 16.27 Tait 241.00 9666.00 Sqm to wall and ceiling, including rendering for plastering specifications. (page No 1111No 21 KSRB15-7: Providing lime curing complete as per cost of materials, labour, 45.33) PWD S.R -2023-24 20421 749.0 61.60 810.64 Sqn T1064 32.00 25940.00 2 Froviding and faxing Virifed glazed ties of approved moe quality & colour of size 600 x 600 x ‘ian thick fixed on bed of 12 tick cement

You might also like