APPENDIX A13
ANNEX B
SCHEDULE 1; SUMMARY OF DOCUMENTS TO BE ENCLOSED WITH SUBMISSION
TEM DESCRIPTION OF DOCUMENTS YesiNo
1 Environmental Protection Works (EPW) Proposal contains;
| (@) EPW activities in work program
| (6) Environmental impact Assessment (EIA) - letter to/from DOET
NREB for legal requirement
jocial Impact Assessment (SIA) — letter to/from PLANMalaysia or
ing authorities for legal requirement
(@ Preservation of Flora and Fauna (Wildlife) - letter tofirom Foresty
| Department or other approving authorities for legal requirement
(@) Erosion and Sediment Control Pian (ESCP)
~
Layout Plan
i Concept Drawing
ii, Name of ESCP Preparer
iv. Drawing certified by Professional Engineer
(Dust & Mud Control
(9) Environmental Monitoring
(h) Environmental Auditing
(Fuel Spillage Management
(J) Waste Management & Disposal System — Scheduled Waste &
Construction and Domestic Waste
(k) Catalog for rain gauge and turbidity measuring equipment
(Schedule of prices for the works
2 Name of Environmental Consultant and company profile, Curriculum Vitae
of Registered Environmental Consultant for preparation of EMP including
copy of related certificate (Registered with DOE/NREB/EPD/other
approving authorities)
3. | Name of Independent Environmental Auditor including copy of related
certificate (Registered with DOE/NREB/EPD/other approving authorities)
4. | Name of Accredited Laboratories including copy of related certificate
(Certified with Skim Akreditasi Makmal Malaysia from Department of
‘Standard Malaysia)
‘5. | Name of Environmental Officer including copy of related certificate (Degree
in Civil Engineering or Environmental Management/Science/ Engineering or
diploma in Environmental Management/Science/ Engineering with minimum
three (3) year experience and be certified to CePSWaM, and CISEC/CESSWI/
JLDP2M2 or equivalent.
Signature of Tenderer
Name of Authorized Personnel
Official Stamp of Tenderer
Date