Given data embankment in different points as shown in figure at every 15m are given in the table belo
Length of Road 75.00m
Width at top 4.00m We have the following data:
Length between
Top surface RL
consecutive 100.00m
section 15.00m Width (b) : 4m
side slope Embackment length (L75 m
1.00V 2.00H Slope (1/S): 1/2
Interval: 15 m
S: 2
C/S rl1 rl2 rl3 rl4 rl5
0 97.6 98.1 97.8 97.6 97.4
15 97.1 97.4 97.6 97.8 97.9
30 98.1 98 97.9 97.8 98
45 97.4 98.9 99.5 100.1 100.9
60 100.1 100.8 100.9 101.3 100.2
75 99.1 99.4 98.9 99.4 99.5
x
0 3.8 5.8 7.8 12.6
0 5.2 7.2 9.2 13.6
0 4 6 8 12.4
0 2.2 4.2 6.2 6
0 -1.6 0.4 2.4 -0.2
0 1.2 3.2 5.2 6.4
0 0 2 4 4
3
secti on2
2.5
1.5
0.5
0
0 2 4 6 8 10 12 14 16
0.5
0
0 2 4 6 8 10 12 14 16
secti on5
0
-2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3
-0.2
-0.4
-0.6
-0.8
-1
-1.2
-1.4
lling for the embankment 75m long having 4m width at the top. It's RL is 100m. The RL of the
5m are given in the table below. The side slopes on both sides is 1:2. Calculate filling and cutting and draw the cross sections.
area
Base of Triangle right triangle rectangle triangle total area m2 Mean area
4.80000000000001 3.61 4.1 4.6 5.76 18.07
4.40000000000001 6.76 5 4.6 4.84 21.2 19.635
4.40000000000001 4 4.1 4.3 4.84 17.24 19.22
-0.199999999999989 1.21 1.6 0.4 0.01 3.22 10.23
-2.59999999999999 0.64 -1.7 -2.2 1.69 -1.57 0.825
1.19999999999999 0.36 1.7 1.7 0.36 4.12 1.275
y 3
0 1.90m 2.20m 2.40m 0
2.5
0 2.60m 2.40m 2.20m 0
0 2.00m 2.10m 2.20m 0 2
0 1.10m 0.50m -0.10m 0 1.5
0 -0.80m -0.90m -1.30m 0 1
0 0.60m 1.10m 0.60m 0
0.5
0 0.00m 0.00m 0.00m 0
0
0 2 4 6
s3
2.5
1.5
14 16 0.5
0
0 2 4 6 8 10 12 14
1
14 16 0.5
0
0 2 4 6 8 10 12 14
secti on6
2 2.5 3 1.2
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7
raw the cross sections.
294.525
288.3
767.775
153.45
12.375
19.125
2 4 6 8 10 12 14
section4
1.2
0.6
0.4
0.2
1.2
0.8
Pratik Nandan Choudhary 0.6
1902030023
A(A1) 0.4
0.2
0
0 1 2 3 4 5 6
-0.2
n4
4 5 6 7