Technical scope defining c RA

Technical kickoff call/meeting C RA


Solution development c R,A
Solution proposal C RA
Solution proposal accepted R |
Project Definition development c RA
VM resources C R,A
1P network setup C RA
Call flows C RA
Low Level Design C RA
LLD acceptred R I
Responsibility Matrix C RA
E F——
vM SETUP
VM resources provided R c
Network setup done R I
VPN SETUP 8: CONFIRMATION R R
Anam Protect deployment
SW installation c RA
VM System installation C RA
ss7 C RA
SMPP C RA
Analytic Components C RA
Configuration C R,A
ss7 C RA
SMPP C RA
Analytic Components C RA
Integration C R,A
SS7 SIGTRAN Links c RA
SMPP TCP Connection C R,A
Ready for Acceptance C RA
Acceptance testing R RA
ss7 R RA
SMPP R RA
Ready for Service R c
ss7 R C
SMPP R c
Trial phase R c
Routing of trial (limited) traffic for SBDX R c
Routing of trial (limited) traffic for SMPP R C
Trial period evaluation R C

Migration of complete traffic for SBDX R c


Migration of complete SMPP traffic R C
Monitoring of SBDX and SMPP sGate Cl R
Direct Connection implementation
ss7 R,C R,C
SMPP R,C R,C
— Project Closedown . .
Training C R
Documentation maintenance C R
Lessons Learned meeting C R