This document provides guidance on labor and payroll requirements for construction projects. It states that certified payrolls must be submitted weekly for all contractors and subcontractors working on site. It outlines the information required on payrolls, such as employee names, identification numbers, hours worked by trade, and wage rates. The document also discusses conducting wage rate interviews, prevailing wage rates, and where to find applicable wage rate information.
This document provides guidance on labor and payroll requirements for construction projects. It states that certified payrolls must be submitted weekly for all contractors and subcontractors working on site. It outlines the information required on payrolls, such as employee names, identification numbers, hours worked by trade, and wage rates. The document also discusses conducting wage rate interviews, prevailing wage rates, and where to find applicable wage rate information.
This document provides guidance on labor and payroll requirements for construction projects. It states that certified payrolls must be submitted weekly for all contractors and subcontractors working on site. It outlines the information required on payrolls, such as employee names, identification numbers, hours worked by trade, and wage rates. The document also discusses conducting wage rate interviews, prevailing wage rates, and where to find applicable wage rate information.
• Certified payrolls are to be submitted for all contractors
(prime & subs) working on site.
• Not required from suppliers, manufacturers, broker
services, etc. • Recommended to keep a log or spread sheet to track which firms are on site and the dates they are on site. • Payrolls are to be submitted on a weekly basis or after every pay period. (Some paychecks issued bi-weekly) • Require annotation of race/gender/name & an individually identifying number for the employee(s) – the identifying # is generally the last four digits of the employee’s SSN. The entire SSN should NOT be shown on the payroll. 4
PAYROLLS (cont.)
• Employees FULL address is required on the first payroll
on which the employee appears. • Must show hours worked in each trade or classification (journey worker/apprentice). • Must show Wage Rate. Fringe Rate must be shown if paid in cash. • Payrolls are to be submitted on form HC-231-1 or form WH-347 (Exhibits in CAM) for Federal Aid Projects. • A printed payroll submitted from a payroll system may be accepted for non-federal aided contracts if it contains all required information and the Statement of Compliance, original signature by the Contractor, is included. HC-231- 1 is also acceptable. 5
PAYROLLS (cont.)
• All payrolls are to be kept on file in the Field Office – DOL
may be on-site to inspect. • May use ProjectWise excel log sheet to log. • Field Office is to verify payrolls are accurate and reported in EBO. • Log into EBO – Payroll Audit – Select D#, Contractor, Payroll Week Ending and confirm that Certified Payroll matches data entered in EBO. • Once completed – click REVIEW button and Save/Continue. • Regional Compliance Specialist may conduct audits to compare information in electronic Civil Rights Reports to the payroll received by the EIC.
NOTE: The certified payroll is the LEGAL document – EBO is
a data repository. EBO’s accuracy is limited to: Race/Gender/Trade/Class and Total Hours. 6
WAGE RATES
• Prevailing wages are to be paid to all contract personnel
(Prime & Subs). • Wage Rates Are Updated July 1st Each Year for MOST trades. • Receipt of Labor Affidavits, AC2947, received for every Prime Contractor. (May go to Regional Office, Exhibits in CAM). • Receipt of Labor Affidavits, AC2948, received for every subcontractor as part of the sub-approval package (Exhibits in CAM). • A revised AC2947/AC2948 is required for all contracts once the wage rates change. (This is part of the Contract FINAL Package – important to get them when rates change – makes for a smoother FINAL). 7
WAGE RATE INTERVIEWS
• Wage rate interviews should be conducted as soon as
possible after workers in a new trade appear on the contract site. • At least one interview should be conducted in each trade employed by the contractor AND one interview for each subcontractor. Intent is to sample each Contractor/ Trade combination. • On multi-year contracts, interviews should be conducted annually (particularly after the July 1st payroll). • It is recommended to perform wage rate interviews on the contractor/subcontractor payday so that the employee will know their pay rate. • Use MURK 10 Wage Rate Interview Form • The completed wage rate form should be filed in the contract’s Labor subfolder in ProjectWise. 8 9
WAGE RATE INFORMATION
• Back of Proposal (Up to July 1st. Thereafter you will need
an update from the DOL Website). • Site Manager – Contract Administration Contract Records Contracts Attachment Link • Link By PRC Number: (See example at end of Chapter 9) • Link By County: (See manual) • Link For Archived Rates: (See manual)
NOTE: When checking rates, be aware that updates can be processed
after initial Wage Determinations Listed in Proposal. By Checking the General Rates By County, You Get Updates. Federal Aid projects have federal rates which are usually less than the State rates but not always for all classifications. 10