Summary of Solar Power

System Proposal
GET Green Energy Corp., Ltd
2015-05-11

GET Green Energy Corp., Ltd Confidential 1


Table of Content

1. Our competitive advantage of Solar power system


2. Our proposal to build Solar power system in Namibia
3. How do we create job opportunities of skilled worker and help
micro-entrepreneurs
4. Must to have list

GET Green Energy Corp., Ltd Confidential 2


Competitiveness of
Solar power system projects
1. GET Green, a company from Taichung, Taiwan. A country and place full
of professionals in Solar industry.
2. Our team member has over 15 years experiences in Solar module and
Solar power system
3. We have patented solar module technologies
4. GET Green is one of the leading companies in Taiwan providing high
quality silicon materials for solar ingot growth. It stands at the upstream
in Solar industry.
5. GET Green trade solar wafer and solar cell of total amount over 1
million USD monthly.
6. Our team member has lived in Namibia for 10 years and worked in
South Africa area for totally 20 years.
7. Many of our team members are capable to communicate with fluent
English
8. We set up training programs and help to build engineers and skilled
workers in Namibia

GET Green Energy Corp., Ltd Confidential 3


Solar power system Plan in Namibia

GET Green Energy Corp., Ltd Confidential 4


Population vs. power capacity
Rank Name Population Solar PV Plant Capacity

1 Windhoek 322,500 55MW

2 Walvis Bay 85,000 40MW

3 Rundu 63,431 35MW

4 Swakopmund 44,725 30MW

5 Oshakati 36,540 25MW

6 Rehoboth 28,843 15MW

7 Katima Mulilo 28,362 15MW

8 Otjiwarongo 28,249 15MW

9 Ondangwa 22,822 10MW

10 Okahandja 22,639 10MW

Total 250MW
Population base on Wikipedia 2014

GET Green Energy Corp., Ltd Confidential 5


Investment Plan
• Investment amount for 5MW power plant :15,000,000USD

• The total investment including,


1. 250MW solar power plant in 10 cities,
2. one solar module assemble line,
3. one high level maintenance center,
4. one training center,
5. cost of operation and financial at first year

763,500,000USD

GET Green Energy Corp., Ltd Confidential 6


Estimated Power Generated

• 5MW Solar Power Plant : 9,500,000KWh/yr

• 250MW Solar Power Plant : 475,000,000KWh/yr

• Assume House of 4 people in Namibia use 1,000KWh/yr

• 250MW Solar Power Plant can support 475,000 houses

GET Green Energy Corp., Ltd Confidential 7


How do we create job of skilled workers
and help micro-entrepreneurs
1. Solar farm plant base on 5MW

• Construction and Installation stage: 40-50 direct workers (12 months)


• Finish stage : 3 operators, 3 maintenance staff

2. Solar farm plant base on 250MW (10 sites)

• Construction and Installation stage: 2,000-2,500 direct workers (12 months)


• Finish stage : 30 operators, 30 maintenance staff

3. Courses to fulfill workers demand of Solar power system


• Industrial Electronic Technologies
• Industrial Wiring
• Fundamental Mechatronic Systems
• Fundamental Surveying Engineering

GET Green Energy Corp., Ltd Confidential 8


4. Short term and long term plan

• First phase
- Engineers and skilled workers demand for Solar system projects
- Technical training for Micro-entrepreneur for household solar
system
- Engineers and skilled workers demand for Solar module assembly
lines in Namibia

• 2nd phase
- Expand the scale and expertise of the training programs to fulfill
the demand due to economic growth in Namibia and neighboring
countries .

5. Support on micro-entrepreneurs

• Finance support
• Technical training and advise
• Business mentoring

GET Green Energy Corp., Ltd Confidential 9


Must to Have List
1. Investment Protection
1.1 A Special executive bill/law/order/notice allowing, protecting and
enhancing foreign investment for construction, engineering, operating and
maintaining Solar Power Station in Namibia.
1.2 A Special executive bill/law/order/notice forbidding of tampering
Electricity Supplying Equipment, which including but not limited to: “Cable Wire”,
“AC Distribution equipment”, “Transformer”, “Reading Meter”
1.3 Pre-Approval of Foreign Exchange on Foreign Loan Payment and
profit repatriation

2. Fast Track Assistance in Visa / Immigration Matters


2.1 At least 50 foreigner working visa;
2.2 Fa
3. Tax Incentive
4. PV Power Plant Property