SITE DIARY

BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: FINE
DAY : Sunday 29/10/23
RAIN :

WORKING TIME: 8.00am - 5.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 1 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 10 1 23 Grabing Machine/M.G
Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 11

Summary of work done and activities:-

Description of work
1 Earthwork zone B,E,D
2 Sediment basin construction
3 CLQ construction
4 Silt trap construction

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Monday 30/10/23 2pm-3pm
RAIN :

WORKING TIME: 8.00am - 5.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 1 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Waterproof Mini Compactor Pile Hammer Machine
6 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 10 1 23 Grabing Machine/M.G
5 Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 16

Summary of work done and activities:-

Description of work
1 Earthwork zone B,E,D
2 Sediment basin construction
3 CLQ construction
4 Silt trap construction
5 Trial pile and piling work : 2nos 350mm zone A

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (SPC REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Tuesday 31/10/23
RAIN :

WORKING TIME: 8.00am - 5.00pm 8.00am - 5.00 pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 10 1 23 Grabing Machine/M.G
5 Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 16

Summary of work done and activities:-

Description of work
1 Earthwork zone B,E,D
2 Sediment basin construction
3 CLQ construction
4 Piling Work : 2 nos trial pile 350mm zone A

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : 1/11/23 Wednesday
RAIN :

WORKING TIME: 8.00am - 5.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 5 10 1 23 Grabing Machine/M.G
Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 16

Summary of work done and activities:-

Description of work
1 Earthwork zone B,E,D
2 Sediment basin construction
3 CLQ construction
4 Piling Work : 3 nos pile 350mm zone A

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Thursday 2/11/23 2pm-4pm
RAIN :

WORKING TIME: 8.00am - 5.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 4 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 5 10 1 23 Grabing Machine/M.G
Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 20

Summary of work done and activities:-

Description of work
1 Earthwork zone B,E,D
2 Sediment basin construction
3 CLQ construction
4 Piling Work : 8 nos pile 350mm zone A

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Friday 3/11/23
RAIN : 3pm-4pm

WORKING TIME: 8.00am - 7.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 4 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 8 10 1 23 Grabing Machine/M.G
Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 23

Summary of work done and activities:-

Description of work
1 Earthwork zone B,E,D
2 Sediment basin construction
3 CLQ construction
4 Piling Work : 8 nos pile 350mm zone A
5 Wash trough construction

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Monday 6/11/23 4pm-5pm
RAIN :

WORKING TIME: 8.00am - 7.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 2 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 8 10 1 23 Grabing Machine/M.G
Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 21

Summary of work done and activities:-

Description of work
1 Earthwork zone B,E,D
2 Piling Machine delivery
3 CLQ construction
4 Piling Work : 8 nos pile 350mm zone A
5 Sediment basin construction

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Tuesday 7/11/23 2pm-3pm
RAIN :
WORKING TIME: 8.00am - 7.00pm 8.00am - 5.00pm
FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15
Aluminium
Clerk of Work 15 Barbender 26 Dumper Truck 1 Water Jet
3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 2 Mobile Crane Rubbish Skip
5 Worker 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter
Site Clerk 32 Air Compressor Crawler Crane
9 Door Leaf Installer 9 22
20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 8 10 1 23 Grabing Machine/M.G
Bulldozer
Safety Supervisor 1 34 Tower Crane Bentonite Plant
11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25
Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig
13 13 26
Total ManPower 21

Summary of work done and activities:-

Description of work

1 Earthwork zone B,E,D


2 Sediment basin construction
3 Piling Machine Assemble
4 Piling Work : 7 nos pile 350mm zone A

Material delivered to site Visitors on site


No Material Remark No Name Time
1 Pile 350mm and 300mm 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Wednesday 8/11/23 3pm-7pm
RAIN :

WORKING TIME: 8.00am - 7.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 2 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 8 10 1 23 Grabing Machine/M.G
Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 21

Summary of work done and activities:-

Description of work
1 Earthwork zone B,E,D
2 Piling Work : 7 nos pile 350mm zone A
3 Wash trough construction
4 Assemble piling machine

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Thursday 9/11/23 2pm-5pm
RAIN :

WORKING TIME: 8.00am - 7.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 2 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 8 10 1 23 Grabing Machine/M.G
Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 21

Summary of work done and activities:-

Description of work
1 Piling Work : 8 nos pile 350mm zone A
2 Piling Work : 8 nos pile 300mm zone A
3 Concreting enterance
4 CLQ construction

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

WEATHER: Fine
DAY : Friday 10/11/23
RAIN :

WORKING TIME: 8.00am - 5.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 4 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 10 1 23 Grabing Machine/M.G
3 Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 18

Summary of work done and activities:-

Description of work
1 Housekeeping
2 Piling Work : 8 nos pile 350mm zone A
3 Piling Work : 8 nos pile 300mm zone A

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
SITE DIARY
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI:
i) 1 BLOK PANGSAPURI PERKHIDMATAN 18 TINGKAT (306 UNIT)
ii) PODIUM 6 TINGKAT YANG MELIBATKAN:
a) 1 TINGKAT KEDAI 19 UNIT BERSERTA RUANG KEMUDAHAN DAN TEMPAT
LETAK KENDERAAN (ARAS TANAH)
b) 1 TINGKAT KEDAI 22 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 1)
c) 3 TINGKAT PANGSAPURI PERKHIDMATAN 60 UNIT DAN TEMPAT LETAK KENDERAAN (ARAS 2 - ARAS 4)
d) 1 TINGKAT PANGSAPURI PERKHIDMATAN 17 UNIT DAN RUANG KEMUDAHAN (ARAS 5)
iii) 1 UNIT RUMAH SAMPAH

Fine
WEATHER:
DAY : Saturday 11/11/23
RAIN :

WORKING TIME: 8.00am - 5.00pm 8.00am - 5.00pm


FINE:

Manpower Plant and Machinery

No Trade Total No Trade Total No Trade Total No Trade Total No Trade Total

1 Project Manager 1 13 Concretor 24 Façade 1 Excavator 1 14 Poker Vibrator

M&E Manager 14 Carpenter 25 Plumber Backhoe 1 Diesel Tank


2 2 15

Clerk of Work 15 Barbender 26 Aluminium Dumper Truck 1 Water Jet


3 Formwork 3 16
4 Site Agent 1 16 General Workers 3 27 Scaffolder 4 Water Truck 17 Bobcat

Earthwork General
Site Engineer 1 17 Bricklayer 28 4 Mobile Crane Rubbish Skip
Worker
5 5 18
C&S Supervisor 1 29 Mini Compactor Pile Hammer Machine
6 Waterproof 6 19
18 Plasterer & Skimcoat
7 QA/QC Engineer 30 Ceiling 7 Water Pump 20 Hydraulic Conc. Breaker
Diesel Genset/ Bar Bending Machine
8 M&E Coordinator & Supervisor 19 Painter 31 IBS 8 21
Welding Set and cutter

9 Site Clerk 32 Door Leaf Installer 9 Air Compressor 22 Crawler Crane


20 Electrical, ELV, Aircon
Back Pusher/
10 Safety Officer 1 33 Piler 8 10 1 23 Grabing Machine/M.G
Bulldozer

Safety Supervisor 1 34 Tower Crane Bentonite Plant


11 11 24
21 Firefighting
Surveyor and helper 2 35 Concrete Mixer Showel
12 12 25

Archi Coordinator & Supervisor 23 Tiler 36 Concrete Pump Pile Rig


13 13 26

Total ManPower 23

Summary of work done and activities:-

Description of work
1 Housekeeping
2 Piling Work : 8 nos pile 350mm zone A
3 Piling Work : 8 nos pile 300mm zone A

Material delivered to site Visitors on site


No Material Remark No Name Time
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Prepared By: Syed Nasir Checked By:
(KIMLUN Representative) (ECO REPRESENTATIVE)
BUILDING WORKS FOR CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK PANGSAPURI PERKHIDMATAN 24 TINGKAT (383 UNIT) YANG MENGANDUNGI: