Professional Documents
Culture Documents
News Scan @L
News Scan @L
Ali. M
Electrical & Instrument
+6282174049940
alitopan9900@gmail.com
Batam, Indonesian
EDUCATION
Senior High School ETIKA‐2 Pontianak
CERTIFICATED
E & I Inspector : NO. OTI.EI.XXXI.05.15.666
CABLE GLANDING and TERMINATION : NO. OTI.CBT‐IV.03.16.060
TENISI K3 LISTRIK : NO.5/371/AS.02.04/XI/2021
SUMMARY JOB
More than 16 years extensive experienced in field of engineering, supervision, inspection,
fabrication, construction and installation of Electrical and instrumentation of offshore/onshore
in Oil & Gas platform such as platform utility module, Marine, Power Plant and Building. I have
ever been Work under Pressure. I like team work & have never leave a project under bad
condition. it gives a good sense of achievement and job satisfaction to have been a part of
team that gets the job done.
Install Glanding HAWK, CMP, and CAPRI product of Gland all Size
Wiring Termination Control, Instrument, Lighting & small Power
Inspection Equipment Installation, Cable Routing & Termination
Page 1 of 6
Pre‐Comm and Commissioning
Familiar with Instrument tools Multi Tester, Insulation Tester, Earthing Tester, Clamp
Meter
Other system control I/O system list function test
Hydraulic, Electrical pneumatic function test
F&G, Instrument Device, HVAC, and sensor I/O function test
Lighting system, Internal Communication system
Cause and Effect general system testing
Leak test, hydrotest of installation tubing instrument system
Computer
Microsoft Office (All Ver.)
Understanding
Ensure Contractor compliance with requirements of Inspection Test Plant & work
procedures.
Monitor field construction activities to ensure requirements are meet in compliance
with drawings, specifications, and applicable codes.
Issue Observation Report, Occurrence Report & NCR on Non‐complying products.
Identify quality deficiencies and root causes at infancy to avoid substantial repetition
prior to discovery and minimize rework.
Inspection equipment of Hazardous Area‐ensure equipment is suitable for the area in
which it is installed.
Inspection all frame/support equipment electrical include installation for power
transformer, Main Switchboard, Emergency switchboard, Fixation Panels, Engine
Generators, etc.
Familiar with electrical equipment inspection, installation, testing of electrical cable
LV/MV/HV, IPB/NPB, Substation Switchgear, Transformer, HV/LV motors, DCS, AC/DC
UPS‐Battery, Earthing systems, lightning arrester, Heat tracing system, etc.
Prepared Check List & Datasheet of Electrical & Instrument Equipment.
Witness and verify cable continuity test and insulation test or Insulation test including
the correct use and installation of cable glands.
Squence Test Panel, Check Vibration, Temperature, RPM Motor.
Check Earthing (proper electrical grounding) checks for continuity and resistance during
installation.
Preparation of test records and reports.
Completion of check sheet requirement and Planning of process to completion report.
Page 2 of 6
Prepared Final Document dossier as Inspection Test Record include with incoming
material summary according ITP & requirement.
Electrical Drawing, Symbol, Legend, Single Line Diagram, Layout Drawing, Cable
Schedule, and Detail Drawing.
Learn about Hazardous Area Drawing.
Material Specification, Standard Project / Specification. NEMA, NEC, IEC, IEEE, ANSI,
NFPA.
Inspection Electrical work, Electrical Cabling, Cable Marking, Cable Glanding, Grounding
Cable and Pulling Cable, Connection and termination Cable, etc.
Inspection Instrument work, Tubing Installation, Installation TT, FT, TE, LT, PDT, PDG, RTD.
Pneumatic Testing Tubing.
Electrical Equipment such as Panel Box, Junction Box, Marshalling Cabinet, Circuit
Breaker.
Inspection of specification Installation Equipment.
Cable Ladder and Cable Tray Installation and Inspection of Installation.
Learn about Inspection, As built drawing, ITR, ITP, RFI, FIN, FIR, Material Control.
Troubleshooting of control system.
Page 3 of 6
WORK EXPERIENCE
Page 4 of 6
Name of Company : PT.PP ( EPCC )
Work Location : PLTMG. MERAUKE 2X50 MW
Position : Supervisor Electrical
Period : Jan“ 11 2019 – Jul“ 11 2019
Reason for Leaving : Job Completed
Page 5 of 6
Name of Company : PT.EIN INDONESIA
Work Location : PT.ASL MARINE BATAM
Position : Electrician Facillity Drydock
Period : Feb” 10 2008 – Sep” 2013
Reason for Leaving : Job Completed
Page 6 of 6
PT PP (Persero) Tbk.
Plaza PP – Lantai 3
Jl. Letjend. TB. Simatupang No. 57
Pasar Rebo - Jakarta 13760
Telpon : (021) 840 3902
Fax : (021) 840 3992
epc@pt-pp.com
Nama : ALI M
Name
Dengan ini perusahaan menyampaikan terima kasih atas jasa dan pengabdiannya
selama bekerja di proyek Portsite Dual Fuel Power Plant 140 MW , semoga
keberhasilan menyertainya dimasa mendatang.
_____________________________________________________________________
We highly appreciate for the good service, he rendered during the term of his working
period, and wish him to get success in the future.