FOUNDATION
BUILDING FRAME
FLOOR
WALL
DOOR & WINDOW
STAIRCASE
ROOF
CEILING
FOUNDATIONS Con’t
Foundation
Systems
Displacement Replacement
1
3/26/2012
Elements:
Column
Loads
Beam
Soil Conditions
Cost
Technology
PRE-CAST CONCRETE
FLOOR/SLAB
STRUCTURE
Elements are cast and cured in industrial plants, Pre-cast concrete Slabs:
transported to the construction site and assemble as rigid The most fully standardized precast concrete elements
components. and used for making floor and roof slabs.
Elements: Slabs, beams, columns and wall panels.
Control of the quality of material and workmanship is 4 types of moss commonly used precast slabs:
better than the conversional method. 1. Solid Flat Slab
Use permanent form of steel, concrete, glass-fiber- 2. Hollow core Slab
reinforced plastic or vanish wood.
Forms can be re-used for 100@1000 times before
3. Double Tee
renewed – low in cost per unit. 4. Single Tee
Use steam to accelerate the curing of the concrete and
moisture for full hydration.
2
3/26/2012
PRECAST CONCRETE
WALL PANEL
ADVANTAGES OF PRECAST
CONCRETE STRUCTURE
3
3/26/2012
STAIRCASE
4
3/26/2012
QUARTER TURN
STAIRS
5
3/26/2012
MATERIAL ROOF
FUNCTIONS:
Brick
To keep out of rain, wind, snow and dust
To prevent excessive heat loss in winter
Timber To keep the interior of the building cool in summer
To accommodate all stresses encountered
Concrete To accept movement due to changes in temperature and
moisture content
To provide lateral restraint and stability to adjacent walls
Steel
To resist penetration of fire and spread of flame from external
sources.
TYPES OF ROOF
Pitch Roof
Flat Roof
6
3/26/2012
CEILING FUNCTIONS
To enclose roof structures (pitch/flat) and upper floor in
order to flatten the surface.
Similar to floor construction.
Temperature and heat insulation (labs, factories etc).
Final finishes to the building.
Sound insulation (cinemas, halls, studios etc).
Act as a cover to roof and floor.
Fire resistant (office, factories).
Ceiling installation depends on space
requirement and building design.
Provide space for cables and ducting.
7
3/26/2012
Frame and tiles system – exposed, conceal, combination, All these elements are vital in building
clip/ screw, screw. construction.