‘organisation; Termphwe Uta Temple w: UE QuaL woz
@ YOUR LOGO GOES HERE Project: ample Frowel ‘Template Version: Form Version.
Team: fuampis Team Farm erented oy 1 ner 4 1
Pare t ay
Signature Sophie Tumer. Monday, 29 October 2018, 10:13:59 an
Sexe
5, Concrete Delivery
Question 5.1 Nunbervf Saches ves Comments: 2 batches
Question 5.2 Bach Tine (Frem Delivery Dackea ves Comments: 10:00a7
Question 5.3 Arrival Time a Sit Yes Comments: 1|:00a7
Comments
Question 5.4 Fioish Time ‘opm
6. Concrete Testing
Question 61 NATA Aporoved Testing Authority ves Comments:
‘Question 62 Amblent lemperatire Vetuen Solegren eles ve Comments cengrees
aneth degree celeis) ris
Question 63 ‘etl Coneréte Teriperarure Mee Comments: 15 domees
celeius
Question 6.4 Tanger Slunp 50 mn + tomes, Actual Simp vee Comments: 49r°m
Question 6.5 Amount of Admixture adsed No Comments:
Question 6.6 Ameuntof water added xo
Question 6.7 urbe of Cinders ater ve Comments: &
Question 6.8 Target Strength ve Comments: 8500
7. Concrete Placement
Question 7 Flacemens Mcthad(*ume, Tremie, Chets, Other) ves Comments: Pama
Question 7.2 Sufficient Personne! for Finishing ete Comments
Question 73 Apprendre sete ves Comments:
‘Question 74 Back up Yibrarorson Hana ves Comments:
Question 75 feintorcemene Cover Maintained during Pour Ys Comments:
Question 7.6 Formwork Stable During Placing and Vibration ves
Question 7.7 ConcretePlaced ard Congaded Within: 259¢ ~ ves
Phos = Famine 2koC = OC =60 mIns Ae =e
Question 78 Provision for Cosure of Access/Openings ves Comments:
Question 75 Horns Feo of sareign altar Pre 10 ves Comments:
Question 7.10 Concrete Finished te Approved Talararces Yes Comments:
‘Audit Results No additonal comments
and
Comments
(Section 5-7)
Signature ft Sophie Tuer, Monday, 29 Octoter 2018, 10:22:30 am
Pogezol 2 Maida, 29 Cuisber 2018, 113236 an