KsKcMahanad Power Company La
mnt__] KMPCL/OPERATION/sOP/I-155
& ‘6X 600 MW Power
PKSK
‘CONDENSER CW ONE PASS ISOLATION
Power from knowledge |
Tue Nor se ate
Revision Wo: 00 Revision Date: leno!
ed
1.0 Purpose:
This Procedure is intended to provide guidance and instructions for carrying
ut the CW line one loop isolation and charging,
2.0 Scope:
This Procedure is epplicable to Turbine Area and CW pump house.
3.0 Responsibility:
3.1 All the personnel involved in carrying out /supervising the above activities
{re required to ensure implementation of this procedure and may consult any
other relevant documents indicated under Reference section below.
3.2 In the event of any changes required in the procedure such changes may
be requested with HOD, who would take appropriate action with approval from
respective departmental heads.
4.0 Abbreviations:
+ PTW = Permit to work
+ SOP = Standard Operating Procedure.
+ HOD = Head of the Department
+ CWP = Circulating water pump
+ CT makeup- Cooling towers makeup |
+ IOCT = Induced draught cooling towers
+ OCW = Open cycle circulating water
+ CCW = Closed cycle circulating water
+ MDBFP - Motor Driven Boiler Feed Pump
+ TOBFP = Turbine Maximum Continuous rating
+ RGMO - Restricted governing Mode of Operation
+ ARV = Al Release Valve
Page 20f7