You are on page 1of 1
Kastor: PT GALA JAYA BANJARMASIN Foe ats Heavy Equipment Spare Part Specialist Tebp SLT R2TS885, 3276688 Komatsu, Hitachi, Caterpillar, ete. Fax = OSILAD7SHH0 Generating Set 10-1000 ka (Sales, Rental, HP OxS-O218 18K Spare Parts, & Service) nail galgjyabjngmai com Banjammas + Pontianak 0561-40407 * Pckanbaru 0761-36499 © Manado 0431-872878 © Ketapang 0534-34102 No 188/QUO-GRS/GI-BIM/VII/2021 Perihal _: Penawaran Harga Sewa Genset 300 KVA & 400 KVA Kepada PT. Waru Kaltim Plantation Kab. Penajam — Kalimantan Timur Up. Bp. Syahputra Lubis Dengan hormat, Sehubungan dengan adanya sewa genset kapasitas 300 Kva / 400 KVA, maka dengan ini kami memberikan ‘penawaran harga sewa Genset sebagai berikut: ‘Cummins Diesel Genset, Silent Type, Capacity 300 Kva, 380/220 V, 3 Phase, 50 Hz, 1.500 Rpm, PF0.8 Engine + Cummins, 6 Cylinder, 4 stroke cycle radiator cooling system. Generator Stamford /Setara, Brush-less type, Insulation class H with AVR, Perlengkapan Silent Box, Daly tank, Battery, Electric Control Panel, Kabel. Total Biya Sewa bias Kerang Genset 500 Kya Silent T | Haga Sewa 300 KvalUnivBulan (Maks 250 Tam/Bulan) Rp. 40:000,000- = Overtime Rp. 160,000,-/Jam (Exclude PPN) Mobilisasi ~ Demobilisasi GensevUnit (PP) Biaya Sewa Bulan Pertama PPN 10% ‘Total Pembayaran Sewa Bulan 1 TL | Harga Sewa 300 Kva/Univ/Bulan (Maks, 250 Jam/Bulan) Rp. 40,000,000,- = Overtime Rp. 160,000,-/Jam (Exclude PPN) Biaya Sewa Bulan Ke ~ Dua sid Seterusnya PPN 10% ‘Total Pembayaran Sewa Bulan 2 s/d Seterusnya Rp. 44.000,000,- Perkins Diese! Genset, Silent Type, Capacity 400 Kva, 380/220 V, 3 Phase, 50 Hz, 1.500 Rpm, PF0,8 Engine + Perkins, 6 Cylinder, 4 stroke cycle radiator cooling system. Generator Stamford / Setara, Brush-less type, Insulation class H with AVR, Perlengkapan Silent Box, Daily tank, Battery, Electric Control Panel, Kabel Total Biaya Sewa Be howe Genset 500 Kya Silent T__ | Harga Sewa 400 KvalUnit/Bulan (Maks. 250 Tam/Bulan) Rp. 50,000,000 = Overtime Rp. 200,000,-/Jam (Exclude PPN) Mobilisasi ~ Demobilisasi GensevUnit (PP) Rp. 20,000.000,- Biaya Sewa Bulan Pertama Rp. 70,000.000, PPN 10% Rp._7,000,000, Total Pembayaran Sewa Bulan 1 Rp. 77.000.000,- TL__ | Harga Sewa 400 Kva/Unit/Bulan (Maks. 250 Jam/Bulan) Rp. 50,000.000,- = Overtime Rp. 200,000,-/Jam (Exclude PPN) Biaya Sewa Bulan Ke—Dua s/d Seterus Rp. 50,000,000, PPN 10% Rp. 5.000.000, ‘Total Pembayaran Sewa Bulan 2 s/d Seterusnya Rp. 44,000.000,- Halaman 1

You might also like