SURVEY REPORT

Project : KINE PROJECT JO Report No. : ITR-WP7-POR-CIV-00252


DWG No. : LINE-906-CG-1-1013 Date : 18-02-2024
Location : ACTUAL COP #2 OBD1 AFTER Subcontractor : PT PORT ENGGINERING
Page
NO B.S F.S I.H G.L D.W.S Remark
BM 6.469 0.882 7.351 5.075
1 2.303 5.048 -0.027
2 2.302 5.049 -0.026
A1
3 2.301 5.050 -0.025
4 2.303 5.048 -0.027
1 2.269 5.082 0.007
2 2.266 5.085 0.010
A3
3 2.266 5.085 0.010
4 2.265 5.086 0.011
1 2.293 5.058 -0.017
2 2.297 5.054 -0.021
B1
3 2.301 5.050 -0.025
4 2.302 5.049 -0.026
1 2.271 5.080 0.005
2 2.274 5.077 0.002
B2
3 2.276 5.075 0.000
4 2.275 5.076 0.001
1 2.282 5.069 -0.006
2 2.285 5.066 -0.009
B3
3 2.286 5.065 -0.010
4 2.304 5.047 -0.028
1 2.265 5.086 0.011
2 2.271 5.080 0.005
C1
3 2.271 5.080 0.005
4 2.269 5.082 0.007
1 2.303 5.048 -0.027
2 2.307 5.044 -0.031
C2
3 2.306 5.045 -0.030
4 2.306 5.045 -0.030
1 2.265 5.086 0.011
2 2.263 5.088 0.013
C3
3 2.264 5.087 0.012
4 2.264 5.087 0.012
Inspection Result :  Accept  Reject

Inspection by Subcontractor Contractor Company

Name

Signature
Date