Professional Documents
Culture Documents
S-093000 OWS Operation, Risk Assessment Form Rev02 July 1 2019.
S-093000 OWS Operation, Risk Assessment Form Rev02 July 1 2019.
Reasonab
‐Major casualties excluding total loss
3 ly Occur once every 1 year 3 Major
‐Single fatality or multiple severe injuries
Probable
‐Total loss (actual loss and constructive total
4 Frequent Occur every month 4 Catastrophic loss)
‐Many fatalities
* See below Appendix 1 " Example of Severity Index".
A 6L
Monitor/Review
###Frequent 5 7 8 (Who Responsible/Next Review/By Implement Decision
Whom)
A6 R
Reasonab
### ly 4 5 7 a. Select the expression for Frequency which most applies to the hazard ( 1st column)
F.I.
Probable
###Remote 3 4 5 P6 b. Select the expression for Severity which most applies to the hazard
c. Cross reference using the above table to determine the level of risk
Extremel e.g., the Frequency=Remote, and Severity=Minor, then the risk is Lev
### y 2 3 4 5
d. If the Risk Level 3 or less The work is permitt ( Green Zone)
F.I.
Insignificant Minor Major Catastrophic 4 or 5 Additional control is requi (Yellow Zone)
S.I.
As Low As Reasnablely Practicable>>
1 2 3 4
S.I.
6 or abov The work is prohibited (Red Zone)
* If the column of Additional control is "Yes", please proceed sheet B.
*PLEASE ONLY SUBMIT "REPORT FORM" TO COMPANY. THIS SHEET NOT NECESSARY TO ATTACH.
SANTOKU SENPAKU CO., LTD.
RISK ASSESSMENT REPORT FORM Form No. S-09.30.00, Rev.02
Ship Name : M/V FERRUM AUSTRALIS SEA CONDITION : Mod
Assessor : Rank/Name/Sign : 1AE/ Khandakar Hamidur Rahman/ SHIP CONDITION : Laden
Master Approval : Name/Sign : Capt. Md Rafed Al Shad /
Date : 31st May' 2020. *Please fill in glay cell only. Other Cell protected. Please select most applicable work
activity category from below.
No. Hazard Associated Possible Existing Control safety measure S.I. F.I. Risk Level Additional
with Activity Consequences (Zone Color) Risk Control
Operation in Violations of Confirmation from the master the positon
restricted area regulations of ship is not within the special area
2 according to international & local
government regulation.
1 2 3 NOT
REQUIRED
No. Hazard Associated Possible Existing Control safety measure S.I. F.I. Risk Level Additional
with Activity Consequences (Zone Color) Risk Control
Malfunction of Accidental Tested 15ppm audio and visual alarm, oil
OWS ODM. dischage of oily sensing prove operation prior to start OWS.
4 water overboard Found working good condition. 2 2 4 REQUIRED
No. Hazard Associated Possible Existing Control safety measure S.I. F.I. Risk Level Additional
with Activity Consequences (Zone Color) Risk Control
Overpressure Leakage Monitor all stage differential water
/Machinary pressure between inlet and outlet to
6 damage observe performance, Purge all chamber
during operation.
1 2 3 NOT
REQUIRED
No. Hazard Associated Possible Existing Control safety measure S.I. F.I. Risk Level Additional
with Activity Consequences (Zone Color) Risk Control
8 0 AUTO