1− ALL DIMENSIONS SHOWN ON DRAWINGS ARE IN

METERS UNITS.

2− DRAWINGS ARE NOT TO BE SCALED. ONLY WRITTEN


DIMENSIONS SHALL BE FOLLOWED.

3− ALL MATERIALS USED IN CONSTRUCTION SHALL BE


OF THE BEST QUALITY TO REQUIRED BRITISH OR
EQUIVALENT STANDARDS AND AS APPROVED BY
CONSULTANT PRIOR TO COMMENCEMENT OF WORK.

PR 4− THE CONTRACTOR SHALL SUPPLY SHOP DRAWINGS


SHOWING DETAILS OF SIZES AND INSTALLATION FOR
DOOR,WINDOWS,KITCHEN CUPBOARDS,HAND RAILING,
ENTRANCE GATE ETC. FOR CONSULTANTS APPROVALS
(WITHIN 6 WEEKS FROM DATE OF COMMENCEMENT)

5− THESE DRAWINGS ARE COPYRIGHT OF (D.H.)


THESE DRAWINGS ARE NOT TO BE COPIED OR
REPRODUCED WITHOUT CONSULTANT’S PERMISSION.
ALL THE DRAWINGS SHALL BE RETURNED BACK TO
THE D.H. ENGINEER ON COMPLETION OF THE JOB.

MODEL (MAKRAMAH 9- 3 BED ROOM)

Case ID: 8984006682


SEWA STAMP:

OWNER:
DIRECTORATE OF HOUSING

BLOCK WORKS

+0.30
INTER.L.

JOB TITLE:

COMPOUND WALL PROPOSED GROUND FLOOR


VILLA

WATER METER CABINET DRAWING TITLE:


SIZE: 20x30x60cm
RECESSED 10cm AT COMPOUND WALL
INSIDE WALL WATER SUPPLY
OUTSIDE WALL SETTING LAYOUT
OUTSIDE INTERLOCK LVL
HEAD OF SEC:
ENG. EMAN HUSSAIN AL JOHARI
ARCH.DESIGNED BY: DRAWN BY:
ENG. NOORA ALSUWAIDI ENG.MOHAMMAD FATHI
STRUCT. DESIGN BY: DRAWN BY:
MAIN WATER LINE ENG.MAHMOUD HAMED ENG.MOHAMMAD FATHI
SERVICES DESIGN BY: DRAWN BY:
SETTING LAYOUT ENG. MOHAMMED MUSTAFA ENG.SYED MAZHAR
1"Ø uPVC CLASS-E PIPE TO VILLA CHECKED BY:
ENG. RAZAN AHMAD
ENG. MAHMOUD HAMED
ENG.AMNA SALIM

DETAIL OF WATER METER BOX SCALE : DATE : DRG NO :


1:100 FEB. 2021 W-01/05
1− ALL DIMENSIONS SHOWN ON DRAWINGS ARE IN
NOTES: METERS UNITS.

1.DRINKING WATER IS NOT ALLOW 2− DRAWINGS ARE NOT TO BE SCALED. ONLY WRITTEN
TO USE FOR PLANTATION. DIMENSIONS SHALL BE FOLLOWED.
2.USE WELL WATER OR TREATED
WATER FOR PLANTATION. 3− ALL MATERIALS USED IN CONSTRUCTION SHALL BE
OF THE BEST QUALITY TO REQUIRED BRITISH OR
3.MAX. 8LITRE CAPACITY IS ALLOW EQUIVALENT STANDARDS AND AS APPROVED BY
FOR FLASH TANK OF W/C. CONSULTANT PRIOR TO COMMENCEMENT OF WORK.
4.LOW PRESSURE TAP SHOULD BE USED. 4− THE CONTRACTOR SHALL SUPPLY SHOP DRAWINGS
SHOWING DETAILS OF SIZES AND INSTALLATION FOR
Ø 3/4". PPR HOT WATER PIPE DOOR,WINDOWS,KITCHEN CUPBOARDS,HAND RAILING,
ENTRANCE GATE ETC. FOR CONSULTANTS APPROVALS
(WITHIN 6 WEEKS FROM DATE OF COMMENCEMENT)
Ø 3/4". PPR. COLD WATER PIPE
5− THESE DRAWINGS ARE COPYRIGHT OF (D.H.)
THESE DRAWINGS ARE NOT TO BE COPIED OR
Ø1". PPR PIPE DROP FROM ROOF REPRODUCED WITHOUT CONSULTANT’S PERMISSION.
ALL THE DRAWINGS SHALL BE RETURNED BACK TO
Ø1.5". PVC PIPE TO ROOF TANK THE D.H. ENGINEER ON COMPLETION OF THE JOB.
PPR
FLEXIBLE HOSE
HW HW HW HW
CW CW CW CW

HW
WATER HEATER

CAPACITY OF ALL BATH-WATER HEATERS TO BE 12 GALLONS.


CAPACITY OF KIT. WATER HEATERS TO BE 16 GALLONS.

F/A FROM ABOVE

T/B TO BELOW

+0.90
+0.90 G.F.L.
G.F.L.
W.H
CW HW CW HW CW HW CW HW

MODEL (MAKRAMAH 9- 3 BED ROOM)

HW
+0.30

CW
INTER.L.
Case ID: 8984006682

HW
SEWA STAMP:

HW HW
HW
HW
HW

HW CW HW CW HW CW HW CW HW CWHW

OWNER:
DIRECTORATE OF HOUSING

+0.90
G.F.L.

+0.30
INTER.L.

JOB TITLE:
PROPOSED GROUND FLOOR
VILLA

DRAWING TITLE:

GROUND FLOOR PLAN


GROUND FLOOR

HEAD OF SEC:
ENG. EMAN HUSSAIN AL JOHARI
ARCH.DESIGNED BY: DRAWN BY:
ENG. NOORA ALSUWAIDI ENG.MOHAMMAD FATHI
STRUCT. DESIGN BY: DRAWN BY:
ENG.MAHMOUD HAMED ENG.MOHAMMAD FATHI
SERVICES DESIGN BY: DRAWN BY:
ENG. MOHAMMED MUSTAFA ENG.SYED MAZHAR
CHECKED BY:
ENG. RAZAN AHMAD
ENG. MAHMOUD HAMED
ENG.AMNA SALIM

SCALE : DATE : DRG NO :


1:100 FEB. 2021 W-02/05
NOTES: 1− ALL DIMENSIONS SHOWN ON DRAWINGS ARE IN
METERS UNITS.
1.DRINKING WATER IS NOT ALLOW
TO USE FOR PLANTATION. 2− DRAWINGS ARE NOT TO BE SCALED. ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
2.USE WELL WATER OR TREATED
WATER FOR PLANTATION. 3− ALL MATERIALS USED IN CONSTRUCTION SHALL BE
3.MAX. 8LITRE CAPACITY IS ALLOW OF THE BEST QUALITY TO REQUIRED BRITISH OR
PPR EQUIVALENT STANDARDS AND AS APPROVED BY
FOR FLASH TANK OF W/C. CONSULTANT PRIOR TO COMMENCEMENT OF WORK.
4.LOW PRESSURE TAP SHOULD BE USED.
4− THE CONTRACTOR SHALL SUPPLY SHOP DRAWINGS
SHOWING DETAILS OF SIZES AND INSTALLATION FOR
Ø 3/4". PPR HOT WATER PIPE DOOR,WINDOWS,KITCHEN CUPBOARDS,HAND RAILING,
ENTRANCE GATE ETC. FOR CONSULTANTS APPROVALS
(WITHIN 6 WEEKS FROM DATE OF COMMENCEMENT)
Ø 3/4". PPR. COLD WATER PIPE
5− THESE DRAWINGS ARE COPYRIGHT OF (D.H.)
Ø1". PPR PIPE DROP FROM ROOF THESE DRAWINGS ARE NOT TO BE COPIED OR
REPRODUCED WITHOUT CONSULTANT’S PERMISSION.
ALL THE DRAWINGS SHALL BE RETURNED BACK TO
Ø1.5". PVC PIPE TO ROOF TANK THE D.H. ENGINEER ON COMPLETION OF THE JOB.

FLEXIBLE HOSE

WATER HEATER

CAPACITY OF ALL BATH-WATER HEATERS TO BE 12 GALLONS.


CAPACITY OF KIT. WATER HEATERS TO BE 16 GALLONS.

F/A FROM ABOVE

T/B TO BELOW

+4.50
S.S.L.

MODEL (MAKRAMAH 9- 3 BED ROOM)

Case ID: 8984006682


SEWA STAMP:

+5.60
P.L.

OWNER:
DIRECTORATE OF HOUSING

ROOF FLOOR PLAN

JOB TITLE:
PROPOSED GROUND FLOOR
VILLA

WATER METER
DRAWING TITLE:
WITH VALVE

ROOF FLOOR &


M SCHEMATIC DIAGRAM

VALVE CHAMBER HEAD OF SEC:


ENG. EMAN HUSSAIN AL JOHARI
G.FLOOR ARCH.DESIGNED BY: DRAWN BY:
ENG. NOORA ALSUWAIDI ENG.MOHAMMAD FATHI
INCOMING WATER SUPPLY 1"Ø P.P.R PIPE CLASS "E" 1"Ø P.P.R PIPE CLASS "E"
STRUCT. DESIGN BY: DRAWN BY:
FROM SEWA ENG.MAHMOUD HAMED ENG.MOHAMMAD FATHI
3/4"Ø PVC PIPE CLASS "E"
SERVICES DESIGN BY: DRAWN BY:
ENG. MOHAMMED MUSTAFA ENG.SYED MAZHAR
CHECKED BY:
ENG. RAZAN AHMAD
ENG. MAHMOUD HAMED
ENG.AMNA SALIM

SCALE : DATE : DRG NO :


1:100 FEB. 2021 W-03/05