PartID: OM9016_01
CAUTION
Prior to any operation, the operator must read this manual entirely. The product / materiel should
not be deviate of its initial destination.
2 GENERAL INFORMATION
2.1 GENERAL SAFETY PRECAUTIONS
This section provides important safety information for anyone responsible for installing, operating,
adjusting; maintaining, cleaning, repairing or transporting the GCU.
Safe operation of the unit can only be guaranteed if it is properly installed, commissioned and
maintained by a qualified person (who is not under the effect of any drugs or alcohol or any product
which could modify/affect the behavior) in compliance with the operating instructions and the
maintenance file.
Language: Summery 1 of 3
Version: 001.3
Gas Combustion Unit (GCU) Standard Maintenance File
PartID: OM9016_01
It must also be complied with general installation and safety instructions for pipeline, plant construction
and Liquefied Natural Gas (LNG) carrier operation as well as the proper use of tool and safety
equipment.
2.2 WARNING
Some of units may cause physical injury if it is not handled and disposed of carefully.
Consider whether closing isolating valves will put any other part of the system or personnel at risk.
Danger may include: isolation of vents, protective devices or alarms. Ensure isolation valves are turned
off in gradual way to avoid system shocks.
Before attempting any maintenance:
• Consider what is or may have been in the pipeline (natural gas, nitrogen, fuel oil, inert gas, …)
and follow the safety rules accordingly (wear of protective clothing including gloves and glasses,
measurement of natural gas or oxygen content, …).
• Ensure that any pressure is isolated, and safety vented to atmospheric pressure before attempting
to maintain the units.
• Ensure that the electrical power supply is shut down and all the control and power cabinets are
locked.
Electricity can cause severe injuries. Never open control or power cabinets, never attempt any
maintenance or setting of equipments before shutting down the electrical power supplies of the
installation.
Allow time for temperature to stabilize to ambient temperature after isolation or stop of the installation to
avoid the danger of burns and always consider that protective clothing (including safety glasses) is
required.
IMPORTANT
Any failure to follow these rules regarding "General safety precautions" and "Warning" releases
Alfa Laval Aalborg from all responsibilities.
IMPORTANT
If the Buyer uses non Alfa Laval Aalborg parts or non Alfa Laval Aalborg approved repairs and
such parts or repairs cause personal injury, death or property damage to third parties, Buyer shall
indemnify and hold harmless Alfa Laval Aalborg from all claims and liabilities associated therewith.
• Objective of visual checking is to point out any change from the origin or from previous inspection
(Rust, lack of paint, crack, deformation, displacement of element, missing part such as screw,
unscrewed nuts, etc).A dye penetrant inspection can complete the visual check.
• At visual checking, in case of abnormal observation, please take pictures and inform Alfa Laval
Aalborg through email: Global ServiceOperation@alfalaval.com.
D122 Visual inspection and Check the calibration. The calibration values are indicated
Air differential pressure transmitter x
D123 output signal check in the operating manual
Figure 1 main_ax6267020en.wmf
Language UK 1/6
OM9016_02#A.3
GAS COMBUSTION UNIT (GCU) STANDARD MAINTENANCE FILE
Tag No Operation
Dry Dock
Referenced Description Start-up Every 3 Operation Remarks
Monthly 1 Year 2 Year Overhaul
P&ID months
Through the view port when stop and when running
x Visual inspection Check that there is no visible damage on the burner
Figure 2 main_bx6267050en.wmf
2/6 Language UK
OM9016_02#A.3
GAS COMBUSTION UNIT (GCU) STANDARD MAINTENANCE FILE
General Inspection
Fan Motor Bearings x
Greasing Refer to fan manual in the instruction manual
XD610 Fan Motor
Figure 3 main_cx6267060en.wmf
Language UK 3/6
OM9016_02#A.3
GAS COMBUSTION UNIT (GCU) STANDARD MAINTENANCE FILE
POWER CABINET
Tag No Operation
Dry Dock
Referenced Description Start-up Every 3 Operation Rem arks
Monthly 1 Year 2 Year Overhaul
P&ID m onths
Figure 4 main_dx6267070en.wmf
4/6 Language UK
OM9016_02#A.3
GAS COMBUSTION UNIT (GCU) STANDARD MAINTENANCE FILE
x Visual inspection
Nitrogen manual lockable
D250 Upstream / dow nstream Leak test under standard pressure
isolating valve x
leak test
D212, D224, Gas & nitrogen & Air
D247 compressed pressure
x Visual inspection
D252, D280 indicator
D264 (if present)
Junction box and electrical Visual inspection and Check that the w ires are not damaged
D10 x
wires check Check the screw tightening for the terminal screw s
D213, D215,
D217, D223,
D283, D225, x Visual inspection Check
D286, D288,
D253, D263, 2 ways manifold
D265, D281,
Pressure test under standard pressure
D248, D290, Upstream /dow nstream
x No visible bubbles w ith leak detector
D292, D125, leak test
at manifold vent outlet
D124
Figure 5 main_ex6271470en.wmf
Language UK 5/6
OM9016_02#A.3
GAS COMBUSTION UNIT (GCU) STANDARD MAINTENANCE FILE
Tag No Operation
Dry Dock
Referenced Description Start-up Every 3 Operation Rem arks
Monthly 1 Year 2 Year Overhaul
P&ID m onths
Flow meter Off Gas (if x Visual inspection Electrical connections to be checked
D276
present) x Calibration
x Visual inspection
D255 Non return valve
x Leak test
x Visual inspection, Cleaning
D251 Nitrogen Strainer
x Changing if required
D231, D227 GVT
D266, D268 (if Gas Vent valve Leak test
present) x
D256, D208
Nitrogen Shut off valve Leak test
D206 (if present)
x
x Visual inspection
D226, D284 Temperature transmitter
x Check of calibration
D805 Manual butterfly valve x Leak test
D804 Heating Element x Visual Inspection
Visual inspection including
D801 Fan
x anti vibration supports
Check in accordance w ith
D802 Fan Motor x general inspection of See Air heater fan motor manual
manual
AVT Visual Inspection,
D810, D808 (if applicable) Instrumentation Calibration, and Changed if
D800 x required
Pressure test under standard pressure
Upstream /dow nstream
D809 2 w ays manifold x No visible bubbles w ith leak detector at manifold vent
leak test
outlet
Check in accordance w ith
D806 Motor Valve x x general inspection of
manual
Junction box's and Visual inspection and
D13 x
electrical w ires check
Figure 6 main_fx6271480en.wmf
6/6 Language UK
Gas Combustion Unit (GCU) Quality plan
PartID: OM9016_03
2 TABLE OF CONTENT
Phase / Equipment Controls 1 2 3 Remarks
Design Internal drawing review R
Certificates R R R
Certificates R R R
Welding procedure R R
Language: Introduction 1 of 3
Version: 001.4
Gas Combustion Unit (GCU) Quality plan
PartID: OM9016_03
Weighing R R
Table 1:
Certificates R R R
Marking R R S
Weighing R R
Certificates R R R
Marking R R S
Weighing R R
Welding procedure R R
Marking R R S
Weighing R/W S
Combined air fans and electric motors Drawings and calculation notes R R
Marking R R S
Weighing R/W S
Welding Procedure R R
Welding R/W S
Delivery Packing R R
Gas trials W
Table 2: