Lamipak Indonesia New Plant Construction Daily Report
Rept - DDDAMIND TB PUPRGDROOT
Jone; Lamipk PT: Lami Packaging Indonesia)
Pom: BV (PT. Bureau Vers Irdosesa)
Joc: DDD (PT. DIRGAMAYA DAYA DHARMALAKSANA)
lowe 1808 2028
800-1200 1200-1700 | 1700-0800
xe wc
DoD 0 t 0 0 0
DDD: = 5 Stal: 4 Worker: 1 Suveyor Safely Logistios ‘foreman worker
Doo: 0 1 T 1 a
[Supporting Construction | aC ‘WAN HOURS
JOperator 2 |__D00 1 0
[Yesterday (4) | atx) | Today 0%)
insie oo [oo 00 all
0.00 000 0.00
|Next Day Construction Plan
Training Room [Safely Induction
WTP |Moasuring For Tray Positon
Transmittals & Inspection
Contractor | Materials Quantity Remarks
a ED Si etal all
Contractor EQUIPMENT ON SITE T ‘Quanity Remarks
bp 0 I ° ; -
= TOTALHEAVY EQUIPMENT L o mene
Site Inspection! Technical
‘Contractor Them Work Rar
DoD {None Riek Garner Ba :
ame : Tara tan Svandara
Position 3 Site Manager ‘OwnerfEmployer
signature ibaP
oe
“Lower
Date i Tuesday, Deverber 19, 2023 Tusedey, December 19,2028,