You are on page 1of 1

Installation CZone – MasterBus Bridge Interface

This Quick installation guide provides a brief overview of the CZone – MasterBus Bridge Interface installation.
1
Reading the user’s manual is still necessary for safety instructions and years of trouble-free service.
The CZone – MasterBus Interface manual is available at www.Mastervolt.com.

Read the safety instructions (chapter 2 of the user’s manual).


2
Mastervolt does not hold itself liable for:
• Damage resulting from the use of the CZone – MasterBus Bridge Interface;
• Possible errors in the included manual and the consequences of these;
• Use that is inconsistent with the purpose of the product.

Check the contents of the delivery.


3
Green - Active/OK
Orange Flash - Traffic
Red - Fault

MasterBus
adapter
TM
User’s
manual
CZone - MasterBus
Bridge Interface

CZone - MasterBus
Bridge Interface Contact your supplier if one of the items is missing.
Do not use the Bridge Interface if it is damaged!

4 8 M1 M2 M3
1 3 10
9 9
C1 C2 C3
Mount the interface on a sturdy
2 2 4
underground. Use 4 mm screws 1. CZone terminator
or bolts. The hole-to-hole distance 2. CZone devices
is 55 mm. The minimum 5 6 7 3. CZone terminator
installation height including 4. Bridge Interface
connectors is 100 mm. Install the 5. CZone connector
interface like indicated. The CZone
TM

6. MasterBus connector
connector must be plugged at the 7. Adapter including cable
left hand side (5), the MasterBus 8. MasterBus terminator
connector at the right (6). Notice 9. MasterBus devices
11 10. MasterBus terminator
the polarization nock (11).
11. Polarization nock
Be sure to put terminators at
the ends of both networks!

Check if the CZone - MasterBus Bridge Interface works correctly.


5 Green - Active/OK
Orange Flash - Traffic
Red - Fault
Green - Active/OK
Orange Flash - Traffic
Red - Fault 3
LED (3) functions:
1 2 Green: Active/OK, CZone (1) and MasterBus (2) connected.
Orange flashing: Traffic, communication.
TM
Red: Fault, no connection.
CZone - MasterBus
Bridge Interface
If there is no connection, check the cables first.
Then check the configuration in both networks.

Mastervolt International B.V, P.O.Box 22947, NL-1100 DK Amsterdam, The Netherlands. Tel.: +31-20-3422100 Email: info@mastervolt.com Copyright © Mastervolt v1.1 120718EN

You might also like