Affected Models: DS404 Drive Housing Used in Peterbilt Air Leaf Suspension Vehicles. See chart below.
Production Production
Wall Suspension Type and Housing P/N On Brackets Welded
Axle Model Thickness Timing Tag By:
DS404 3/8" (9.5mm) Air Leaf - Before 3/99 319402 Peterbilt
DS404 3/8" (9.5mm) Air Leaf - From 3/99 - 6/00 319954 Dana
12:00 Position
Second Pass Direction
Repair Instructions:
Important : Before starting, always wear the proper safety equipment for your protection.
1. Disconnect the battery grounds and oil temperature sensor wire. Caution*** If the battery ground is not
disconnected, vehicle electronic control modules may be damaged.
3. Jack-up driver’s side forward rear drive axle and support with jack stand.
4. Remove driver’s side forward rear drive axle tires and rims only.
7. For the repair of the cover weld crack, locate the ends of the crack, mark 2 inches either side of the crack. These
marks are ONLY for reference! You must grind until the entire crack is eliminated. Then grind an additional two-
inches on either side of the crack.
Old Weld
Housing Fit-Up Line
1/4”
Area To Be
Ground
Cover
12:00 Position Radius
Cover
Grind Profile
Approximate
Depth
1/4”
10. For All Weld Passes Cover Weld – When using a Mig Welder use approximate setting of 30 volts and 180 amps. If
using an Arc welder, use E7018 1/8 inch electrode.
Important** The ground from the welder must be connected to the torque rod bracket. See figure below.
Ground Connection
11. Important: The first weld pass must be centered over the fit-up line and penetrate the failed area. Remove all
slag. The first pass must cool before the second pass can be applied. While weld is cooling move to step 12 to
prepare housing for bracket.
Housing
First Pass
Cover
12. Before the reinforcing bracket is located the housing surface must be clean and paint removed in weld area.
13. Position the reinforcing bracket so that the bracket edge is flush with the surface between the tracking arm bracket
lugs.
Bracket Lugs
Top of Repair
Bracket
Top of Bracket
Between Lugs
15. Second Pass Cover Weld – Remember, do not start or stop at the 12:00 position. The second pass will be placed
slightly above the initial pass. See drawing below. When making the second pass the weld direction should be
reversed. When using an Arc welder you may have to start the weld at the 1:00 position so that you do not run out of
electrode at the 12:00 position. You can then go back and fill in the ends of the weld area. When the second pass
cools, apply the third weld pass as show on the diagram below.
Housing
Second Weld Pass
16. Third Pass Cover Weld – The third pass should cover the lower half of the second pass and stop at the housing
covers edge. Again, reverse the direction of the weld. Remember, do not start or stop at the 12:00 position.
Housing
Cover
Third Pass Cover
17. Bracket Weld – Weld first pass, apply second or third passes as needed. When using a Mig Welder use approximate
setting of 30 volts and 180 amps. If using an Arc welder, use 1/8 inch, E7018 electrode.
If you have any questions about this procedure call the Spicer Call Center at 1-800-621-8084.
For spec’ing or service assistance, call 1-800-621-8084 24 hours a day, 7 days a week.
Or visit our web site at: http://www.spicerparts.com
Dana Corporation
SHAIS132 Copyright Dana Corporation, 2001 Commercial Vehicle Axle Division
August 2001 All Rights Reserved. P.O. Box 321
Printed in U.S.A. www.dana.com Toledo, Ohio 43697-0321