You are on page 1of 80

Data Curah Hujan Maksimum Tahunan

No. Tgl/Bln/Thn Sta. Songgon (mm) Sta. Kabat (mm) Sta. Rogojampi (mm)
1 30/12/1988 80 38 82
2 28/03/1989 38 12 64
3 3/3/1990 54 55 77
4 14/02/1991 92 25 94
5 18/01/1992 41 47 89
6 20/11/1993 60 28 ***
7 11/2/1994 58 85 119
8 13/02/1995 65 21 31
9 19/02/1996 *** 15 35
10 26/01/1997 115 34 96
11 13/02/1998 98 20 99
12 16/12/1999 60 18 76
13 12/3/2000 81 92 100
14 13/01/2001 44 0 63
15 21/04/2002 86 8 75
16 13/01/2003 75 25 28
17 28/01/2004 83 80 75
18 11/12/2005 60 0 48
19 5/2/2006 158 130 67
20 4/12/2007 52 22 56
21 1/1/2008 49 178 83
22 15/04/2009 87 76 53
23 1/3/2010 71 43 21
24 31/04/2011 68 12 67
25 18/02/2012 42 0 47

Pada Sta. Licin


Jumlah 1352 859 1239 0
Data Hilang Sta. Licin
30.90

Pada Sta. Kabat


Jumlah 488 311 556 0
Data Hilang Sta. Kabat
59.21
Data Curah Hujan Maksimum Tahunan
No. Tgl/Bln/Thn Sta. Songgon (mm) Sta. Kabat (mm) Sta. Rogojampi (mm)
1 30/12/1988 80.00 38.00 82.00
2 30/12/1989 38.00 12.00 64.00
3 30/12/1990 54.00 55.00 77.00
4 14/02/1991 92.00 25.00 94.00
5 14/02/1992 41.00 47.00 89.00
6 14/02/1993 60.00 28.00 34.00
7 14/02/1994 58.00 85.00 119.00
8 14/02/1995 65.00 21.00 31.00
9 14/02/1996 31.00 15.00 35.00
10 14/02/1997 115.00 34.00 96.00
11 14/02/1998 98.00 20.00 99.00
12 14/02/1999 60.00 18.00 76.00
13 14/02/2000 81.00 92.00 100.00
14 14/02/2001 44.00 0.00 63.00
15 14/02/2002 86.00 8.00 75.00
16 14/02/2003 75.00 25.00 28.00
17 14/02/2004 83.00 80.00 75.00
18 14/02/2005 60.00 0.00 48.00
19 14/02/2006 158.00 130.00 67.00
20 14/02/2007 52.00 22.00 56.00
21 14/02/2008 49.00 178.00 83.00
22 14/02/2009 87.00 76.00 53.00
23 14/02/2010 71.00 43.00 21.00
24 14/02/2011 68.00 12.00 67.00
25 14/02/2012 42.00 0.00 47.00
Lampiran 10. Tabel dan Grafik Uji Konsistensi Data Hujan Sta. A

Kumulatif Sta. Licin (mm)


Kumulatif
Sta. Songgon Kumulatif Rerata 3 Sta.
Tgl/Bln/Thn Sta. Pembanding
(mm) (mm) (mm) (mm)
30/12/1988 80.00 1748.00 60.00 1371.50
28/03/1989 38.00 1668.00 38.00 1311.50
2000.00
3/3/1990 54.00 1630.00 66.00 1273.50
14/02/1991 92.00 1576.00 59.50 1207.50 1800.00
18/01/1992 41.00 1484.00 68.00 1148.00 1600.00
20/11/1993 60.00 1443.00 31.00 1080.00
11/2/1994 58.00 1383.00 102.00 1049.00 1400.00

13/02/1995 65.00 1325.00 26.00 947.00 1200.00


19/02/1996 31.00 1260.00 25.00 921.00
1000.00
26/01/1997 115.00 1229.00 65.00 896.00
13/02/1998 98.00 1114.00 59.50 831.00 800.00
16/12/1999 60.00 1016.00 47.00 771.50
600.00
12/3/2000 81.00 956.00 96.00 724.50
13/01/2001 44.00 875.00 31.50 628.50 400.00
21/04/2002 86.00 831.00 41.50 597.00
200.00
13/01/2003 75.00 745.00 26.50 555.50
28/01/2004 83.00 670.00 77.50 529.00 0.00
0
11/12/2005 60.00 587.00 24.00 451.50
5/2/2006 158.00 527.00 98.50 427.50
4/12/2007 52.00 369.00 39.00 329.00
1/1/2008 49.00 317.00 130.50 290.00

Kumulatif Sta. Kabat (mm)


15/04/2009 87.00 268.00 64.50 159.50
1/3/2010 71.00 181.00 32.00 95.00
31/04/2011 68.00 110.00 39.50 63.00
18/02/2012 42.00 42.00 23.50 23.50
Sumber : Hasil Analisa dan Perhitungan, 2015
1800.00

Lampiran 11. Tabel dan Grafik Uji Konsistensi Data Hujan Sta. B 1600.00
Kumulatif
Sta.Kabat Kumulatif Rerata 3 Sta. 1400.00
Tgl/Bln/Thn Sta. Pembanding
(mm) (mm) (mm) (mm) 1200.00
30/12/1988 38.00 1064.00 81.00 1713.50
28/03/1989 12.00 1026.00 51.00 1632.50 1000.00
3/3/1990 55.00 1014.00 65.50 1581.50
800.00
14/02/1991 25.00 959.00 93.00 1516.00
18/01/1992 47.00 934.00 65.00 1423.00 600.00
20/11/1993 28.00 887.00 47.00 1358.00
11/2/1994 85.00 859.00 88.50 1311.00 400.00
13/02/1995 21.00 774.00 48.00 1222.50
19/02/1996 15.00 753.00 33.00 1174.50 200.00

26/01/1997 34.00 738.00 105.50 1141.50


0.00
0
400.00

200.00

0.00
13/02/1998 20.00 704.00 98.50 1036.00 0
16/12/1999 18.00 684.00 68.00 937.50
12/3/2000 92.00 666.00 90.50 869.50
13/01/2001 0.00 574.00 53.50 779.00
21/04/2002 8.00 574.00 80.50 725.50
13/01/2003 25.00 566.00 51.50 645.00
28/01/2004 80.00 541.00 79.00 593.50
11/12/2005 0.00 461.00 54.00 514.50
5/2/2006 130.00 461.00 112.50 460.50
4/12/2007 22.00 331.00 54.00 348.00
1/1/2008 178.00 309.00 66.00 294.00
15/04/2009 76.00 131.00 70.00 228.00
1/3/2010 43.00 55.00 46.00 158.00
31/04/2011 12.00 12.00 67.50 112.00
18/02/2012 0.00 0.00 44.50 44.50
Sumber : Hasil Analisa dan Perhitungan, 2015

Lampiran 12. Tabel dan Grafik Uji Konsistensi Data Hujan Sta. C
Kumulatif
Sta. Rogojampi Kumulatif Rerata 3 Sta.
Tgl/Bln/Thn Sta. Pembanding
(mm) (mm) (mm) (mm)
30/12/1988 82.00 1679.00 59.00 1406.00
28/03/1989 64.00 1597.00 25.00 1347.00
32935.0 77.00 1533.00 54.50 1322.00
14/02/1991 94.00 1456.00 58.50 1267.50
18/01/1992 89.00 1362.00 44.00 1209.00
20/11/1993 34.00 1273.00 44.00 1165.00
34640.0 119.00 1239.00 71.50 1121.00
13/02/1995 31.00 1120.00 43.00 1049.50
19/02/1996 35.00 1089.00 23.00 1006.50
26/01/1997 96.00 1054.00 74.50 983.50
13/02/1998 99.00 958.00 59.00 909.00
16/12/1999 76.00 859.00 39.00 850.00
36863.0 100.00 783.00 86.50 811.00
13/01/2001 63.00 683.00 22.00 724.50
21/04/2002 75.00 620.00 47.00 702.50
13/01/2003 28.00 545.00 50.00 655.50
28/01/2004 75.00 517.00 81.50 605.50
38668.0 48.00 442.00 30.00 524.00
38839.0 67.00 394.00 144.00 494.00
39184.0 56.00 327.00 37.00 350.00
39448.0 83.00 271.00 113.50 313.00
15/04/2009 53.00 188.00 81.50 199.50
40181.0 21.00 135.00 57.00 118.00
31/04/2011 67.00 114.00 40.00 61.00
18/02/2012 47.00 47.00 21.00 21.00
Sumber : Hasil Analisa dan Perhitungan, 2015

Lampiran 13. Tabel dan Grafik Uji Konsistensi Data Hujan Sta. D
Kumulatif
Sta. Rogojampi Kumulatif Rerata 3 Sta.
Tgl/Bln/Thn Sta. Pembanding
(mm) (mm) (mm) (mm)
30/12/1988 0 0 67 1497
28/03/1989 0 0 38 1430
3/3/1990 0 0 62 1392
14/02/1991 0 0 70 1330
18/01/1992 0 0 59 1260
20/11/1993 0 0 41 1201
11/2/1994 0 0 87 1160
13/02/1995 0 0 39 1073
19/02/1996 0 0 27 1034
26/01/1997 0 0 82 1007
13/02/1998 0 0 72 925
16/12/1999 0 0 51 853
12/3/2000 0 0 91 802
13/01/2001 0 0 36 711
21/04/2002 0 0 56 675
13/01/2003 0 0 43 619
28/01/2004 0 0 79 576
11/12/2005 0 0 36 497
5/2/2006 0 0 118 461
4/12/2007 0 0 43 342
1/1/2008 0 0 103 299
15/04/2009 0 0 72 196
1/3/2010 0 0 45 124
31/04/2011 0 0 49 79
18/02/2012 0 0 30 30
Sumber : Hasil Analisa dan Perhitungan, 2015
Kumulatif Sta. Licin (mm)

GRAFIK LENGKUNG MASSA GANDA


STA. LICIN
2000.00

1800.00
f(x) = 1.29112576034611 x + 21.0242172528154
R² = 0.994026304770681
1600.00

1400.00

1200.00

1000.00 Data CH (mm)


Linear (Data CH (mm))
800.00

600.00

400.00

200.00

0.00
0.00 200.00 400.00 600.00 800.00 1000.00 1200.00 1400.00 1600.00
Kumulatif Rerata Stasiun Hujan Pembanding (mm)
Kumulatif Sta. Kabat (mm)

GRAFIK LENGKUNG MASSA GANDA


STA. KABAT
1800.00

1600.00
f(x) = 1.18182413537028 x − 96.9736669283011
1400.00 R² = 0.976232884724508

1200.00

Data CH (mm)
1000.00
Linear (Data CH (mm))

800.00

600.00

400.00

200.00

0.00
0.00 200.00 400.00 600.00 800.00 1000.00 1200.00 1400.00 1600.00
Kumulatif Rerata Stasiun Hujan Pembanding (mm)
400.00

200.00

0.00
0.00 200.00 400.00 600.00 800.00 1000.00 1200.00 1400.00 1600.00
Kumulatif Rerata Stasiun Hujan Pembanding (mm)
Kumulatif Sta. Songgon (mm) GRAFIK LENGKUNG MASSA GANDA
STA. SONGGON
1200.00

f(x) = 0.603077818022075 x + 76.7257419866932


1000.00 R² = 0.955393640967178

800.00

m)
600.00 Data CH (mm)

a CH (mm)) Linear (Data CH (mm))

400.00

200.00

0.00

Kumulatif Rerata Stasiun Hujan Pembanding (mm)


Kumulatif Sta. Rogojampi (mm)

GRAFIK LENGKUNG MASSA GANDA


STA. ROGOJAMPI
1

m)
Data CH (mm)
a CH (mm))
Linear (Data CH (mm))
1

0
0 f(x) = 0200 Kumulatif
400 600Rerata Stasiun
800 Hujan
1000Pembanding
1200 (mm)
1400 1600
R² = 0
0
0 f(x) = 0200 Kumulatif
400 600Rerata Stasiun
800 Hujan
1000Pembanding
1200 (mm)
1400 1600
R² = 0
Tabel 4.8 Rekapitulasi Konsistensi Data Curah Hujan
No. Stasiun Hujan Persamaan R²
1 Licin y = 1.1338x + 57.608 0.9944
2 Songgon y = 0.5997x + 86.483 0.9534
3 Kabat y = 1.077x - 59.586 0.9861
4 Rogojampi y = 1.2385x - 86.465 0.9903
Sumber : Hasil Analisa dan Perhitungan, 2015

Data CH (mm)
Linear (Data CH (mm))

Data CH (mm)

Linear (Data CH (mm))

600
600
Keterangan
Konsisten
Konsisten
Konsisten
Konsisten
DATA CH STA LICIN SETALAH DIPERBAIKI
(H0) KUMULATIF STA. SONGGON
Tgl/Bln/Thn HZ = 1.6*H0
STASIUN SONGGON SETELAH DIPERBAIKI
30/12/1988 80 128 2022.00
28/03/1989 38 61 1894.00
3/3/1990 54 86 1833.000
14/02/1991 92 147 1747.000
18/01/1992 41 66 1600.000
20/11/1993 60 96 1534.000
11/2/1994 58 93 1438.000
13/02/1995 65 1345
19/02/1996 51 1280
26/01/1997 115 1229
13/02/1998 98 1114
16/12/1999 60 1016
12/3/2000 81 956
13/01/2001 44 875
21/04/2002 86 - 831
13/01/2003 75 - 745
28/01/2004 83 - 670
11/12/2005 60 - 587
5/2/2006 158 - 527
4/12/2007 52 - 369
1/1/2008 49 - 317
15/04/2009 87 - 268
1/3/2010 71 - 181
31/04/2011 68 - 110
18/02/2012 42 - 42

DATA CH STA LICIN SETALAH DIPERBAIKI


(H0) KUMULATIF STA. KABAT
Tgl/Bln/Thn HZ = 2,75*H0
STASIUN KABAT SETELAH DIPERBAIKI
30/12/1988 38 104.5 1979.25
28/03/1989 12 33 1874.8
3/3/1990 55 151.25 1841.75
14/02/1991 25 68.75 1690.50
18/01/1992 47 129.25 1621.75
20/11/1993 28 77 1492.50
11/2/1994 85 233.75 1415.50
13/02/1995 21 57.75 1181.75
19/02/1996 15 41.25 1124.00
26/01/1997 34 93.5 1082.75
13/02/1998 20 55 989.25
16/12/1999 18 49.5 934.25
12/3/2000 92 253 884.75
13/01/2001 0 0 631.75
21/04/2002 8 22 631.75
13/01/2003 25 68.75 609.75
28/01/2004 80 541
11/12/2005 0 - 461
5/2/2006 130 - 461
4/12/2007 22 - 331
1/1/2008 178 - 309
15/04/2009 76 - 131
1/3/2010 43 - 55
31/04/2011 12 - 12
18/02/2012 0 - 0

DATA CH STA LICIN SETALAH DIPERBAIKI


(H0) KUMULATIF STA. KABAT
Tgl/Bln/Thn HZ = 0,5*H0
STASIUN ROGOJAMPI SETELAH DIPERBAIKI
30/12/1988 82 41 1112
28/03/1989 64 32 1071
3/3/1990 77 38.5 1039
14/02/1991 94 47 1000.5
18/01/1992 89 44.5 953.5
20/11/1993 34.00 17 909
11/2/1994 119 59.5 892
13/02/1995 31 15.5 832.5
19/02/1996 35 17.5 817
26/01/1997 96 48 799.5
13/02/1998 99 49.5 751.5
16/12/1999 76 38 702
12/3/2000 100 50 664
13/01/2001 63 31.5 614
21/04/2002 75 37.5 582.5
13/01/2003 28 - 545
28/01/2004 75 - 517
11/12/2005 48 - 442
5/2/2006 67 - 394
4/12/2007 56 - 327
1/1/2008 83 - 271
15/04/2009 53 - 188
1/3/2010 21 - 135
31/04/2011 67 - 114
18/02/2012 47 - 47

DATA CH STA LICIN SETALAH DIPERBAIKI


(H0) KUMULATIF STA. ROGOJAMPI
Tgl/Bln/Thn HZ = 0.61*H0
SETELAH DIPERBAIKI
KUMULATIF STA. ROGOJAMPI
Tgl/Bln/Thn HZ = 0.61*H0
STASIUN ROGOJAMPI SETELAH DIPERBAIKI
30/12/1988 0 0 0.00
28/03/1989 0 0 0.00
3/3/1990 0 0 0.00
14/02/1991 0 0 0.00
18/01/1992 0 0 0.00
20/11/1993 0 0 0.00
11/2/1994 0 0 0.00
13/02/1995 0 0 0.00
19/02/1996 0 0 0.00
26/01/1997 0 0 0.00
13/02/1998 0 0 0.00
16/12/1999 0 0 0
12/3/2000 0 0 0
13/01/2001 0 0 0
21/04/2002 0 0 0
13/01/2003 0 0 0
28/01/2004 0 0 0
11/12/2005 0 - 0
5/2/2006 0 - 0
4/12/2007 0 - 0
1/1/2008 0 - 0
15/04/2009 0 - 0
1/3/2010 0 - 0
31/04/2011 0 - 0
18/02/2012 0 - 0
KET :
RUMUS HZ DIPEROLEH DARI PERHITUNGAN PADA GRAFIK

KET :
RUMUS HZ DIPEROLEH DARI PERHITUNGAN PADA GRAFIK
KET :
RUMUS HZ DIPEROLEH DARI PERHITUNGAN PADA GRAFIK

KET :
RUMUS HZ DIPEROLEH DARI PERHITUNGAN PADA GRAFIK
Kumulatif Sta. Licini (mm)
Lampiran 10. Tabel dan Grafik Uji Konsistensi Data Hujan Sta. A
Kumulatif
Sta. Songgon Kumulatif Rerata 2 Sta.
Tgl/Bln/Thn Sta. Pembanding
(mm) (mm) (mm) (mm)
30/12/1988 128 2022 62.04 1448.89
28/03/1989 61 1894 31.56 1386.85
3/3/1990 86 1833 76.70 1355.30 2500

14/02/1991 147 1747 53.39 1278.59


2000
18/01/1992 66 1600 72.83 1225.20
20/11/1993 96 1534 37.42 1152.37 1500
11/2/1994 93 1438 118.54 1114.96
13/02/1995 65 1345 29.79 996.42 1000
19/02/1996 51 1280 25.31 966.63
500
26/01/1997 115 1229 62.61 941.31
13/02/1998 98 1114 50.19 878.70
0
16/12/1999 60 1016 41.05 828.51 0.00
12/3/2000 81 956 119.26 787.46
13/01/2001 44 875 19.78 668.20
21/04/2002 86 831 45.14 648.42

Kumulatif Sta. Kabat (mm)


13/01/2003 75 745 37.88 603.28
28/01/2004 83 670 113.90 565.40
11/12/2005 60 587 24.00 451.50
5/2/2006 158 527 98.50 427.50
4/12/2007 52 369 39.00 329.00 1400
1/1/2008 49 317 130.50 290.00
1200
15/04/2009 87 268 64.50 159.50
1/3/2010 71 181 32.00 95.00 1000
31/04/2011 68 110 39.50 63.00 800
18/02/2012 42 42 23.50 23.50
600
Sumber : Hasil Analisa dan Perhitungan, 2015
400
Lampiran 11. Tabel dan Grafik Uji Konsistensi Data Hujan Sta. B
200
Kumulatif
Sta.Kabat Kumulatif Rerata 2 Sta.
Tgl/Bln/Thn Sta. Pembanding 0
(mm) (mm) (mm) (mm)
30/12/1988 73 1613 89.75 1653.53
28/03/1989 23 1540 50.60 1563.78
3/3/1990 105 1517 67.18 1513.18
14/02/1991 48 1412 103.02 1446.00
18/01/1992 90 1364 60.95 1342.99
20/11/1993 53 1275 58.68 1282.04
11/2/1994 162 1221 83.87 1223.37
13/02/1995 40 1059 42.23 1139.50
19/02/1996 29 1019 36.49 1097.27
26/01/1997 65 990 87.64 1060.78
13/02/1998 38 925 80.09 973.13
16/12/1999 34 887 53.86 893.05
12/3/2000 176 853 71.90 839.18
13/01/2001 0 677 41.78 767.28
21/04/2002 15 677 80.50 725.50
13/01/2003 48 662 51.50 645.00
28/01/2004 153 614 79.00 593.50
11/12/2005 0 461 54.00 514.50
5/2/2006 130 461 112.50 460.50
4/12/2007 22 331 54.00 348.00
1/1/2008 178 309 66.00 294.00
15/04/2009 76 131 70.00 228.00
1/3/2010 43 55 46.00 158.00
31/04/2011 12 12 67.50 112.00
18/02/2012 0 0 44.50 44.50
Sumber : Hasil Analisa dan Perhitungan, 2015

Lampiran 12. Tabel dan Grafik Uji Konsistensi Data Hujan Sta. C
Kumulatif
Sta. Rogojampi Kumulatif Rerata 2 Sta.
Tgl/Bln/Thn Sta. Pembanding
(mm) (mm) (mm) (mm)
30/12/1988 51 1285 100.29 1817.37
28/03/1989 40 1234 41.96 1717.08
3/3/1990 48 1193 95.53 1675.12
14/02/1991 59 1145 97.38 1579.59
18/01/1992 56 1086 77.88 1482.22
20/11/1993 21 1030 74.74 1404.33
11/2/1994 75 1009 127.68 1329.59
13/02/1995 19 934 52.56 1201.92
19/02/1996 22 915 39.83 1149.36
26/01/1997 60 893 89.97 1109.53
13/02/1998 62 832 68.10 1019.56
16/12/1999 48 770 47.19 951.46
12/3/2000 63 722 128.36 904.28
13/01/2001 40 660 22.00 775.92
21/04/2002 75 620 50.64 753.92
13/01/2003 28 545 61.38 703.28
28/01/2004 75 517 117.90 641.90
11/12/2005 48 442 30.00 524.00
5/2/2006 67 394 144.00 494.00
4/12/2007 56 327 37.00 350.00
1/1/2008 83 271 113.50 313.00
15/04/2009 53 188 81.50 199.50
1/3/2010 21 135 57.00 118.00
31/04/2011 67 114 40.00 61.00
18/02/2012 47 47 21.00 21.00
Sumber : Hasil Analisa dan Perhitungan, 2015

Lampiran 13. Tabel dan Grafik Uji Konsistensi Data Hujan Sta. D
Kumulatif
Sta. Rogojampi Kumulatif Rerata 3 Sta.
Tgl/Bln/Thn Sta. Pembanding
(mm) (mm) (mm) (mm)
30/12/1988 #REF! #REF! #REF! #REF!
28/03/1989 #REF! #REF! #REF! #REF!
3/3/1990 #REF! #REF! #REF! #REF!
14/02/1991 #REF! #REF! #REF! #REF!
18/01/1992 #REF! #REF! #REF! #REF!
20/11/1993 #REF! #REF! #REF! #REF!
11/2/1994 #REF! #REF! #REF! #REF!
13/02/1995 #REF! #REF! #REF! #REF!
19/02/1996 #REF! #REF! #REF! #REF!
26/01/1997 #REF! #REF! #REF! #REF!
13/02/1998 #REF! #REF! #REF! #REF!
16/12/1999 #REF! #REF! #REF! #REF!
12/3/2000 #REF! #REF! #REF! #REF!
13/01/2001 #REF! #REF! #REF! #REF!
21/04/2002 #REF! #REF! #REF! #REF!
13/01/2003 #REF! #REF! #REF! #REF!
28/01/2004 #REF! #REF! #REF! #REF!
11/12/2005 #REF! #REF! #REF! #REF!
5/2/2006 #REF! #REF! #REF! #REF!
4/12/2007 #REF! #REF! #REF! #REF!
1/1/2008 #REF! #REF! #REF! #REF!
15/04/2009 #REF! #REF! #REF! #REF!
1/3/2010 #REF! #REF! #REF! #REF!
31/04/2011 #REF! #REF! #REF! #REF!
18/02/2012 #REF! #REF! #REF! #REF!
Sumber : Hasil Analisa dan Perhitungan, 2015
Kumulatif Sta. Songgon (mm)
Kumulatif Sta. Licini (mm)

GRAFIK LENGKUNG MASSA GANDA


STA. LICIN
2500 1800
1600
2000 1400
f(x) = 1.35218899074472 x − 29.4514728356321 1200
R² = 0.992997838448348
1500 1000
Data CH (mm) 800
1000 Linear (Data CH (mm)) 600
400

500 200
0

0
0.00 200.00 400.00 600.00 800.00 1000.00 1200.00 1400.00 1600.00
Kumulatif Rerata Stasiun Hujan Pembanding (mm)
Kumulatif Sta. Kabat (mm)

GRAFIK LENGKUNG MASSA GANDA


STA. KABAT
1400
f(x) = 0.691305164349642 x + 75.7271152404986
1200 R² = 0.993465039559478

1000

800
Data CH (mm)
Linear (Data CH (mm))
600

400

200

Kumulatif Rerata Stasiun Hujan Pembanding (mm)


Kumulatif Sta. Songgon (mm)

GRAFIK LENGKUNG MASSA GANDA


STA. SONGGON
1800
1600
f(x) = 1.02235994384988 x − 52.9003220247949
1400 R² = 0.993600328685722
1200
1000
800 Data CH (mm)
Linear (Data CH (mm))
600
400
200
0

Kumulatif Rerata Stasiun Hujan Pembanding (mm)


Kumulatif Sta. Rogojampi (mm)

f(x) = NaN x + NaN


R² = 0 GRAFIK LENGKUNG MASSA GANDA
STA. ROGOJAMPI
12

10

Data CH (mm)
6 Linear (Data CH (mm))

0
Kumulatif Rerata Stasiun Hujan Pembanding (mm)
0 5 10 15 20 25 30
Tabel 4.8 Rekapitulasi Konsistensi Data Curah Hujan
Uji Konsistensi Sebelum Diperbaiki Uji Konsistensi Sesudah Diperbaiki
No. Stasiun Hujan
Persamaan R² Persamaan
1 Licin y = 1.1338x + 57.608 0.9944 y = 1.3441x - 12.553
2 Songgon y = 0.5997x + 86.483 0.9534 y = 1.1514x - 84.123
3 Kabat y = 1.077x - 59.586 0.9861 y = 0.7807x + 49.549
4 Rogojampi y = 1.2385x - 86.465 0.9903 y = 0.7768x + 42.142
Sumber : Hasil Analisa dan Perhitungan, 2015
istensi Sesudah Diperbaiki
Keterangan

0.9949 Konsisten (R² ≈ 1 )
0.991 Konsisten (R² ≈ 1 )
0.9979 Konsisten (R² ≈ 1 )
0.9957 Konsisten (R² ≈ 1 )
Rekapitulasi Data Curah Hujan Maksimum Tahunan Setelah Perbaikan Konsistensi
No. Tahun sta licin sta kabat sta rogojampi
1 30/12/1988 134.40 85.12 45.10
2 30/12/1989 63.84 26.88 35.20
3 30/12/1990 90.74 123.20 42.35
4 14/02/1991 154.56 56.00 51.70
5 14/02/1992 68.88 67.20 48.95
6 14/02/1993 100.80 35.84 27.50
7 14/02/1994 97.44 190.40 65.45
8 14/02/1995 109.20 47.04 17.05
9 14/02/1996 55.44 33.60 19.25
10 14/02/1997 115.00 76.16 52.80
11 14/02/1998 98.00 44.80 38.50
12 14/02/1999 60.00 40.32 27.50
13 14/02/2000 121.00 206.08 55.00
14 14/02/2001 35.00 0.00 34.65
15 14/02/2002 86.00 17.92 75.00
16 14/02/2003 75.00 56.00 28.00
17 14/02/2004 83.00 179.20 75.00
18 14/02/2005 60.00 0.00 48.00
19 14/02/2006 158.00 130.00 67.00
20 14/02/2007 52.00 22.00 56.00
21 14/02/2008 49.00 178.00 83.00
22 14/02/2009 87.00 76.00 53.00
23 14/02/2010 71.00 43.00 21.00
24 14/02/2011 68.00 12.00 67.00
25 14/02/2012 42.00 0.00 47.00
KOEFISIEN THIESSEN TABEL CH HARIAN M
LUAS DAERAH STASIUN LUAS (KM) KOEFISIEN (%) No.
A Songgon 6958.31 Licin 6958.31 60.69 1
A Kabat 4210.83 Songgon 4210.83 36.73 2
A Rgjmpi 296.45 Kabat 296.45 2.59 3
∑A 11465.59 Jumlah 11465.59 100 4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
TABEL CH HARIAN MAKS. TAHUNAN DIURUTKAN KECIL KE BASAR
Tgl/Bln/Thn PA*KA PB*KB PC*KC CH. MAKS 14/02/2012 16.79
30/12/1988 81.57 31.26 1.17 113.99 14/02/2005 23.18
30/12/1989 38.74 9.87 0.91 49.53 14/02/1996 28.53
30/12/1990 55.07 45.25 1.09 101.41 30/12/1989 31.47
14/02/1991 93.80 20.57 1.34 115.70 14/02/2007 34.01
14/02/1992 41.80 24.68 1.27 67.75 14/02/2011 34.07
14/02/1993 61.17 13.16 0.71 75.05 14/02/1999 35.26
14/02/1994 59.14 69.93 1.69 130.75 14/02/1995 36.92
14/02/1995 66.27 17.28 0.44 83.99 14/02/2002 38.33
14/02/1996 33.65 12.34 0.50 46.48 14/02/2003 42.74
14/02/1997 69.79 27.97 1.37 99.13 14/02/1998 50.84
14/02/1998 59.47 16.45 1.00 76.92 14/02/1993 51.61
14/02/1999 36.41 14.81 0.71 51.93 14/02/2010 51.92
14/02/2000 73.43 75.68 1.42 150.54 14/02/1992 55.48
14/02/2001 21.24 0.00 0.90 22.14 14/02/1997 65.17
14/02/2002 52.19 6.58 1.94 60.71 30/12/1990 66.86
14/02/2003 45.52 20.57 0.72 66.81 14/02/1991 70.91
14/02/2004 50.37 65.81 1.94 118.12 30/12/1988 71.57
14/02/2005 36.41 0.00 1.24 37.65 14/02/2009 78.89
14/02/2006 95.89 47.74 1.73 145.36 14/02/2004 80.84
14/02/2007 31.56 8.08 1.45 41.09 14/02/2001 84.62
14/02/2008 29.74 65.37 2.15 97.26 14/02/2000 88.47
14/02/2009 52.80 27.91 1.37 82.08 14/02/1994 89.27
14/02/2010 43.09 15.79 0.54 59.42 14/02/2008 128.52
14/02/2011 41.27 4.41 1.73 47.41 14/02/2006 137.18
14/02/2012 25.49 0.00 1.22 26.70
DIURUTKAN BESAR KE KECIL
14/02/2006 137.18
14/02/2008 128.52
14/02/1994 89.27
14/02/2000 88.47
14/02/2001 84.62
14/02/2004 80.84
14/02/2009 78.89
30/12/1988 71.57
14/02/1991 70.91
30/12/1990 66.86
14/02/1997 65.17
14/02/1992 55.48
14/02/2010 51.92
14/02/1993 51.61
14/02/1998 50.84
14/02/2003 42.74
14/02/2002 38.33
14/02/1995 36.92
14/02/1999 35.26
14/02/2011 34.07
14/02/2007 34.01
30/12/1989 31.47
14/02/1996 28.53
14/02/2005 23.18
14/02/2012 16.79
Tabel 5.8 Uji Abnormalitas Data Curah Hujan Untuk Harga Maksimum
No. Xi Log Xi Xi + b Log (Xi + b) Log (Xi + b)^2
1 16.79 1.225 16.79 1.225 1.501
2 23.18 1.365 23.18 1.365 1.863
3 28.53 1.455 28.53 1.455 2.118
4 31.47 1.498 31.47 1.498 2.244
5 34.01 1.532 34.01 1.532 2.346
6 34.07 1.532 34.07 1.532 2.348
7 35.26 1.547 35.26 1.547 2.394
8 36.92 1.567 36.92 1.567 2.456
9 38.33 1.583 38.33 1.583 2.507
10 42.74 1.631 42.74 1.631 2.660
11 50.84 1.706 50.84 1.706 2.911
12 51.61 1.713 51.61 1.713 2.933
13 51.92 1.715 51.92 1.715 2.942
14 55.48 1.744 55.48 1.744 3.042
15 65.17 1.814 65.17 1.814 3.291
16 66.86 1.825 66.86 1.825 3.331
17 70.91 1.851 70.91 1.851 3.425
18 71.57 1.855 71.57 1.855 3.440
19 78.89 1.897 78.89 1.897 3.599
20 80.84 1.908 80.84 1.908 3.639
21 84.62 1.927 84.62 1.927 3.715
22 88.47 1.947 88.47 1.947 3.790
23 89.27 1.951 89.27 1.951 3.805
24 128.52 2.109 128.52 2.109 4.448
Total 40.898 40.898 1672.648
Rerata 1.704 1.704 2.904
Sumber : Hasil perhitungan, 2012

PERHITUNGAN NILAI b
No. Xs Xt Xs.Xt Xs + Xt Xs.Xt - Xo^2 2Xo - (Xs + Xt) bi
1 128.519 16.795 2158.440 145.314 -401.134 -44.130 9.090
2 89.266 23.177 2068.902 112.443 1492.902 -64.443 -23.166
Total -14.076
m =
Xo = 50.59
n = 24
m = 2
b = -5.87

PERHITUNGAN γε UNTUK Xε = 137,177179149611 (MAKS)


Xo = 1.704
X^2 = 2.904
Sx = 0.020
1/c = ((2n)/(n-1))1/2 * (X 2rerata - Xo2)1/2
1/c = 0.028

JADI :
Xε = 137.177 Nilai CH Maksimum
Xo = 1.704
Sx = 0.020
b = -5.87

(Xε + b) = 131.312
(Xo + b) = 4.161

γε = 76.5003

εo = 0.0021

KESIMPULAN :
Karena nilai γε > εo, maka data tidak dapat disingkirkan.
Tabel 5.9 Uji Abnormalitas Data Curah Hujan Untuk Harga Minimum
No. Xi Log Xi Xi + b Log (Xi + b) Log (Xi + b)^2
1 137.18 2.137 137.18 2.137 4.568
2 128.52 2.109 128.52 2.109 4.448
3 89.27 1.951 89.27 1.951 3.805
4 88.47 1.947 88.47 1.947 3.790
5 84.62 1.927 84.62 1.927 3.715
6 80.84 1.908 80.84 1.908 3.639
7 78.89 1.897 78.89 1.897 3.599
8 71.57 1.855 71.57 1.855 3.440
9 70.91 1.851 70.91 1.851 3.425
10 66.86 1.825 66.86 1.825 3.331
11 65.17 1.814 65.17 1.814 3.291
12 55.48 1.744 55.48 1.744 3.042
13 51.92 1.715 51.92 1.715 2.942
14 51.61 1.713 51.61 1.713 2.933
15 50.84 1.706 50.84 1.706 2.911
16 42.74 1.631 42.74 1.631 2.660
17 38.33 1.583 38.33 1.583 2.507
18 36.92 1.567 36.92 1.567 2.456
19 35.26 1.547 35.26 1.547 2.394
20 34.07 1.532 34.07 1.532 2.348
21 34.01 1.532 34.01 1.532 2.346
22 31.47 1.498 31.47 1.498 2.244
23 28.53 1.455 28.53 1.455 2.118
24 23.18 1.365 23.18 1.365 1.863
Total 41.810 41.810 73.817
Rerata 1.742 1.742 3.076
Sumber : Hasil perhitungan, 2012

PERHITUNGAN NILAI b
No. Xs Xt Xs.Xt Xs + Xt Xs.Xt - Xo^2
1 23.18 137.18 3179.324 160.354 130.187
2 28.53 128.52 3666.800 157.050 3090.800
Total
m =
Xo = 55.22
n = 24
m = 2
b = -12.90

PERHITUNGAN γε UNTUK Xε =16,7946738605528 (MIN)


Xo = 1.742
X^2 = 3.076
Sx = 0.202
1/c = ((2n)/(n-1))1/2 * (X 2rerata - Xo2)1/2
1/c = 0.292

JADI :
Xε = 16.795 Nilai CH Minimum
Xo = 1.742
Sx = 0.202
b = -12.90

(Xε + b) = 3.898
(Xo + b) = 11.154

γε = 2.2596

εo = 0.0021

KESIMPULAN :
Karena nilai γε > εo, maka data tidak dapat disingkirkan.
JIKA NILAI B NEGATIF MAKA Xi+b=nilai Xi
jika nilai b positif b nza di kunci rumusnya tetap

2Xo - (Xs + Xt) bi


-49.916 -2.608
-109.050 -28.343
-30.951
Tabel Perhitungan Parameter Dasar Statistik Hujan Harian Maksimum

CH Maks Xi | Xi - Xr | | Xi - Xr |^2 | Xi - Xr |^3 | Xi - Xr |^4


No.
(mm) (mm) (mm) (mm) (mm) (mm)

1 113.99 16.79 42.94 1844.12 79192.45 3400778.45

2 49.53 23.18 36.56 1336.72 48871.82 1786808.75

3 101.41 28.53 31.21 973.86 30391.11 948408.47

4 115.70 31.47 28.26 798.90 22580.78 638241.81

5 67.75 34.01 25.72 661.70 17021.07 437840.48

6 75.05 34.07 25.67 659.03 16918.48 434325.15

7 130.75 35.26 24.47 599.00 14660.33 358804.71

8 83.99 36.92 22.82 520.54 11876.22 270959.39

9 46.48 38.33 21.41 458.48 9816.98 210202.05

10 99.13 42.74 17.00 289.01 4913.33 83528.47

11 76.92 50.84 8.90 79.22 705.16 6276.52

12 51.93 51.61 8.13 66.09 537.28 4367.88

13 150.54 51.92 7.81 61.06 477.08 3727.81

14 22.14 55.48 4.26 18.12 77.13 328.32

15 60.71 65.17 5.43 29.50 160.23 870.29


16 66.81 66.86 7.12 50.66 360.56 2566.28
17 118.12 70.91 11.17 124.76 1393.54 15565.29
18 37.65 71.57 11.83 140.05 1657.39 19613.95
19 145.36 78.89 19.16 366.96 7029.64 134661.80
20 41.09 80.84 21.11 445.45 9401.48 198424.49
21 97.26 84.62 24.88 619.10 15404.12 383279.82
22 82.08 88.47 28.73 825.35 23711.22 681195.78
23 59.42 89.27 29.53 871.92 25746.33 760245.38
24 47.41 128.52 68.78 4730.89 325397.07 22381276.52
25 26.70 137.18 77.44 5996.84 464391.27 35962128.71
Total 22567.32 1132692.07 69124426.54

Parameter Dasar Statistik


Jumlah Data 25 Koefisien Skewness (Cs) 0.97
X rata-rata 59.74 Koefisien Kurtosis (Ck) 0.77
Standar Deviasi = 30.66
Syarat Analisa Distribusi Frekuensi :
` Metode Gumbel Cs = 1.1395 dan Ck = 5.4002
` Metode Log Person III, tidak ada syarat khusus
` Metode Normal Cs = (-0.05) < Cs < (+0.05) dan Ck = 2.7 < Ck < 4.5

Dari persyaratan nilai Cs dan Ck tersebut, maka distribusi frekuensi yang sesuai untuk menghitung
Tabel 4.36 Batas Kelas Uji Chi Square DAS Tambong
Kelas Pr % Log Xi rerata Cs G Si Log Xi X
1 16.67 1.721 -0.17 0.517 0.23 1.839 68.994
2 33.33 1.721 -0.17 0.093 0.23 1.743 55.272
3 50.00 1.721 -0.17 0.028 0.23 1.728 53.430
4 66.67 1.721 -0.17 -0.525 0.23 1.602 40.025
5 83.33 1.721 -0.17 -1.077 0.23 1.477 29.984
Sumber : Hasil Perhitungan, 2017

Jumlah batas kelas distribusi :


K = 1 + 3.22 log n
n= 25 Data
K= 5.50
≈6 Kelas

10 0.41
15 0.34
11 0.396
Tabel 4.37 Pengujian Chi Square DAS Tambong
No Batas Kelas Frek. Teoritis (Ej)
1 0- 29.984 4
2 29.984 - 40.025 4
P Cs G 3 40.025 53.430 4
10 0 1.282 4 53.430 55.272 4
-0.1 1.27 5 55.272 68.994 4
-0.17 1.262 6 68.994 - ∞ 4
20 0 0.842 Jumlah 25
-0.1 0.420 Sumber : Hasil Perhitungan, 2017
-0.17 0.145
16.67 10 1.262 Jadi :
20 0.145 dk α X² hit
16.67 0.517
3.0 5% 3.560
20 0 0.842
-0.1 0.42
-0.17 0.145 Catatan :
50 0 0.000 Frekuensi pengamatan (Oj) didapat dari data curah hujan yang disesua
-0.1 0.017 Frekuensi teoritis (Ej) didapat dari pembagian jumlah data hujan terha
-0.17 0.028
33.33 20 0.145
50 0.028
33.33 0.093
50 0 0.000
-0.1 0.017
-0.17 0.028
90 0 -1.282
-0.1 -1.292
-0.17 -1.299
66.67 50 0.028
90 -1.299
66.67 -0.525
50 0 0.000
-0.1 0.017
-0.17 0.028
90 0 -1.282
-0.1 -1.292
-0.17 -1.299
83.33 50 0.028
90 -1.299
83.33 -1.077
uare DAS Tambong
Frek. Pengamatan (Oj) (Oj - Ej)²/Ej
4 0.007
5 0.167
3 0.327
2 1.127
7 1.927
4 0.007
25 3.560
2017

X² kritis (Tabel) X² hit < X² kritis


Data sesuai untuk
7.81472
Distribusi Log Person III

apat dari data curah hujan yang disesuaikan batas kelas


ari pembagian jumlah data hujan terhadap batas kelas
HIDROGRAF SATUAN SINTETIK METODE NAKAYASU

A . Ro
Qp =
3,6 (0,3 Tp + T0,3)

Dimana :
Qp = Debit puncak banjir (m3/dt)
Ro = Hujan satuan (mm), umumnya 1 mm
Tp = Tenggang waktu dari permulaan hujan sampai
puncak banjir (jam)
T0,3 = Waktu yang diperlukan oleh penurunan debit
dari debit puncak sampai menjadi 30% dari
debit puncak.
Tp = tg + 0,8 tr

Ketentuan :
L < 15 Km → tg = 0,21*L^0,7
L > 15 Km → tg = 0,4 + 0,058.L

Dimana :
L = Panjang alur sungai (Km)
tg = Waktu konsentrasi
Tr = (0,5 - 1) Jam
T0,3 = α . Tg (Jam)

Diketahui :
` Panjang Sungai (L)
* S. Taman = 31.00 Km

` Satuan Waktu = 1 Jam


` Curah Hujan Satuan = 1 mm
` Base Flow
* S. Gladak = 25.00 m3/dt

` Dicoba :
α = 1.5 → Untuk bagian hidrograf yang lambat
α = 2 → Untuk daerah pengaliran biasa
α = 2.5 → Untuk bagian hidrograf yang menurun cepat
α = 3 → Untuk bagian hidrograf yang menurun lambat
HIDROGRAF SATUAN SINTETIK NAKAYASU SUNGAI GLADAK KECAMATAN ROGOJAMPI KABUPATEN

WAKTU LENGKUNG HIDROGRAF "NAKAYASU" UNTUK α = 1,5


L1 = 31 Km → L > 15 Km
A = 11466 Km2
α = 1.5
Tr = 1 Jam
Tg = 2.198 Jam
Tp = 2.998 Jam
T0,3 = 3.297 Jam
Qp = 758.957 m3/dt

TABEL BATAS - BATAS WAKTU LENGKUNG HIDROGRAF UNTUK α = 1,5


Awal (Jam) Akhir (Jam)
No. Karakteristik Notasi
Notasi Nilai Notasi Nilai
1 Lengkung Naik Qd0 0 0 Tp 3.00
2 Lengkung turun 1 Qd1 Tp 3.00 Tp + T0,3 6.30
3 Lengkung turun 2 Qd2 Tp + T0,3 6.30 Tp + 2,5.T0,3 11.24
4 Lengkung turun 3 Qd3 Tp + 2,5.T0,3 11.24 24 24

TABEL UNIT HIDROGRAF SATUAN SINTETIK NAKAYASU UNTUK α = 1,5


t Qt
Notasi Rumus
(Jam) (m3/dt)
0 Qd0 Qp*((t/Tp)^2,4) 0.00
1 54.43
2 287.27
3 760.17
4 Qd1 Qp*(0,3^((t - Tp)/T0,3)) 526.39
5 365.36
6 253.58
7 Qd2 Qp*(0,3^((t - Tp + 0,5*T0,3)/(1,5*T0,3))) 191.78
8 150.34
9 117.85
10 92.39
11 72.42
12 Qd3 Qp*(0,3^((t - Tp + 1,5*T0,3)/(2*T0,3))) 59.46
13 49.54
14 41.27
15 34.38
16 28.65
17 23.86
18 19.88
19 16.56
20 13.80
21 11.50
22 9.58
23 7.98
24 6.65
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR PERIODE ULANG 25 TAHUN UNTUK α = 1,5


t Qt R1 R2 R3 R4 R5 R6
(Jam) (m3/dt) 23.05 5.98 4.22 3.22 2.84 2.59
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 54.43 1254.40 0.00 0.00 0.00 0.00 0.00
2 287.27 6620.74 325.55 0.00 0.00 0.00 0.00
3 760.17 17519.66 1718.27 229.93 0.00 0.00 0.00
4 526.39 12131.69 4546.84 1213.60 175.30 0.00 0.00
5 365.36 8420.32 3148.51 3211.41 925.22 154.81 0.00
6 253.58 5844.35 2185.31 2223.78 2448.30 817.08 141.15
7 191.78 4419.91 1516.77 1543.47 1695.35 2162.14 744.98
8 150.34 3464.86 1147.09 1071.29 1176.71 1497.20 1971.36
9 117.85 2716.17 899.23 810.18 816.72 1039.17 1365.09
10 92.39 2129.26 704.92 635.12 617.66 721.26 947.48
11 72.42 1669.17 552.60 497.88 484.20 545.47 657.62
12 59.46 1370.40 433.20 390.30 379.57 427.60 497.34
13 49.54 1141.70 355.66 305.96 297.56 335.21 389.87
14 41.27 951.16 296.30 251.20 233.26 262.78 305.63
15 34.38 792.43 246.85 209.28 191.51 206.00 239.59
16 28.65 660.18 205.66 174.35 159.55 169.12 187.82
17 23.86 550.01 171.34 145.25 132.92 140.90 154.20
18 19.88 458.22 142.74 121.01 110.74 117.39 128.47
19 16.56 381.75 118.92 100.82 92.26 97.79 107.03
20 13.80 318.04 99.07 83.99 76.86 81.47 89.17
21 11.50 264.96 82.54 69.98 64.03 67.88 74.29
22 9.58 220.74 68.76 58.30 53.35 56.55 61.89
23 7.98 183.90 57.29 48.57 44.44 47.11 51.56
24 6.65 153.21 47.73 40.46 37.03 39.25 42.96
0.00 39.76 33.71 30.85 32.70 35.79
0.00 28.08 25.70 27.24 29.81
0.00 21.41 22.70 24.84
0.00 18.91 20.69
0.00 17.24
0.00
Sumber : Hasil perhitungan, 2017
ROGOJAMPI KABUPATEN BANYUWANGI

WAKTU LENGKUNG HIDROGRAF "NAKAYASU" UNTUK α = 2


L1 = 31 Km → L > 15 Km
A = 11466 Km2
α = 2
Tr = 1 Jam
Tg = 2.198 Jam
Tp = 2.998 Jam
T0,3 = 4.396 Jam
Qp = 601.444 m3/dt

TABEL BATAS - BATAS WAKTU LENGKUNG HIDROGRAF UNTUK α = 2


Awal (Jam)
No. Karakteristik Notasi
Notasi
1 Lengkung Naik Qd0 0
2 Lengkung turun 1 Qd1 Tp
3 Lengkung turun 2 Qd2 Tp + T0,3
4 Lengkung turun 3 Qd3 Tp + 2,5.T0,3

TABEL UNIT HIDROGRAF SATUAN SINTETIK NAKAYASU UNTUK α = 2


t
Notasi Rumus
(Jam)
0 Qd0 Qp*((t/Tp)^2,4)
1
2
3
4 Qd1 Qp*(0,3^((t - Tp)/T0,3))
5
6
7
8 Qd2 Qp*(0,3^((t - Tp + 0,5*T0,3)/(1,5*T0,3)))
9
10
11
12
13
14 Qd3 Qp*(0,3^((t - Tp + 1,5*T0,3)/(2*T0,3)))
15
16
17
18
19
20
21
22
23
24
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR PERIODE ULANG 25 TAHUN UNTUK α = 2


Base Flow Q t Qt R1 R2 R3
(m3/dt) (m3/dt) (Jam) (m3/dt) 23.05 5.98 4.22
25.00 25.00 0 0.00 0.00 0.00 0.00
25.00 1279.40 1 43.13 994.06 0.00 0.00
25.00 6971.29 2 227.65 5246.68 257.99 0.00
25.00 19492.86 3 602.41 13883.65 1361.66 182.21
25.00 18092.43 4 457.10 10534.81 3603.20 961.73
25.00 15885.28 5 347.59 8010.92 2734.08 2544.92
25.00 13684.97 6 264.32 6091.70 2079.06 1931.06
25.00 12107.63 7 200.99 4632.27 1580.97 1468.43
25.00 10353.50 8 161.53 3722.86 1202.20 1116.63
25.00 7671.57 9 134.58 3101.56 966.19 849.11
25.00 5780.71 10 112.12 2583.95 804.94 682.41
25.00 4431.95 11 93.41 2152.72 670.61 568.53
25.00 3523.42 12 77.82 1793.46 558.69 473.65
25.00 2850.96 13 64.83 1494.16 465.45 394.60
25.00 2325.33 14 54.04 1245.48 387.78 328.75
25.00 1910.65 15 47.13 1086.09 323.24 273.88
25.00 1581.68 16 41.09 947.09 281.87 228.30
25.00 1319.62 17 35.84 825.89 245.80 199.08
25.00 1103.56 18 31.25 720.19 214.34 173.61
25.00 923.56 19 27.25 628.03 186.91 151.39
25.00 773.61 20 23.76 547.65 162.99 132.01
25.00 648.67 21 20.72 477.57 142.13 115.12
25.00 544.59 22 18.07 416.45 123.94 100.39
25.00 457.88 23 15.76 363.15 108.08 87.54
25.00 385.64 24 13.74 316.68 94.25 76.34
25.00 197.81 0.00 82.19 66.57
25.00 135.84 0.00 58.05
25.00 93.95 0.00
25.00 64.60
25.00 42.24
25.00 25.00
Sumber : Hasil perhitungan, 2017
U" UNTUK α = 2 WAKTU LENGKUNG HIDROGRAF "NA
L1 = 31
A = 11466
α = 2.5
Tr = 1
Tg = 2.198
Tp = 2.998
T0,3 = 5.495
Qp = 498.074

DROGRAF UNTUK α = 2 TABEL BATAS - BATAS WAKTU LENGK


Awal (Jam) Akhir (Jam)
No. Karakteristik
Nilai Notasi Nilai
0 Tp 3.00 1 Lengkung Naik
3.00 Tp + T0,3 7.39 2 Lengkung turun 1
7.39 Tp + 2,5.T0,3 13.99 3 Lengkung turun 2
13.99 24 24 4 Lengkung turun 3

AKAYASU UNTUK α = 2 TABEL UNIT HIDROGRAF SATUAN SIN


Qt t
us Notasi
(m3/dt) (Jam)
0.00 0 Qd0
43.13 1
227.65 2
602.41 3
457.10 4 Qd1
347.59 5
264.32 6
200.99 7
)/(1,5*T0,3)))
3 161.53 8
134.58 9 Qd2
112.12 10
93.41 11
77.82 12
64.83 13
)/(2*T0,3)))
3 54.04 14
47.13 15
41.09 16
35.84 17 Qd3
31.25 18
27.25 19
23.76 20
20.72 21
18.07 22
15.76 23
13.74 24
Sumber : Hasil perhitungan, 2017

25 TAHUN UNTUK α = 2 TABEL HIDROGRAF BANJIR PERIODE U


R4 R5 R6 Base Flow Q t Qt
3.22 2.84 2.59 (m3/dt) (m3/dt) (Jam) (m3/dt)
0.00 0.00 0.00 25.00 25.00 0 0.00
0.00 0.00 0.00 25.00 1019.06 1 35.72
0.00 0.00 0.00 25.00 5529.67 2 619.81
0.00 0.00 0.00 25.00 15452.53 3 497.86
138.92 0.00 0.00 25.00 15263.66 4 399.90
733.20 122.68 0.00 25.00 14170.80 5 321.21
1940.18 647.50 111.85 25.00 12826.36 6 258.01
1472.20 1713.41 590.37 25.00 11482.64 7 207.24
1119.49 1300.12 1562.23 25.00 10048.53 8 166.47
851.29 988.64 1185.40 25.00 7967.20 9 138.76
647.34 751.79 901.41 25.00 6396.84 10 119.90
520.25 571.68 685.45 25.00 5194.24 11 103.60
433.43 459.45 521.24 25.00 4264.91 12 89.52
361.10 382.77 418.91 25.00 3541.98 13 77.36
300.83 318.89 349.00 25.00 2955.73 14 66.84
250.63 265.67 290.75 25.00 2515.26 15 57.76
208.80 221.33 242.23 25.00 2154.63 16 49.91
174.05 184.40 201.81 25.00 1856.02 17 43.55
151.78 153.71 168.13 25.00 1606.75 18 39.03
132.35 134.04 140.15 25.00 1397.86 19 34.98
115.41 116.88 122.21 25.00 1222.16 20 31.35
100.64 101.92 106.57 25.00 1068.95 21 28.10
87.76 88.88 92.93 25.00 935.35 22 25.18
76.53 77.51 81.04 25.00 818.85 23 22.57
66.74 67.59 70.67 25.00 717.25 24 20.23
58.20 58.94 61.62 25.00 352.51
50.75 51.39 53.74 25.00 238.93
44.25 44.82 46.86 25.00 160.93
0.00 39.08 40.86 25.00 104.94
0.00 35.63 25.00 60.63
0.00 25.00 25.00
Sumber : Hasil perhitungan, 2017
LENGKUNG HIDROGRAF "NAKAYASU" UNTUK α = 2,5
Km → L > 15 Km
Km2

Jam
Jam
Jam
Jam
m3/dt

ATAS - BATAS WAKTU LENGKUNG HIDROGRAF UNTUK α = 2,5


Awal (Jam) Akhir (Jam)
Karakteristik Notasi
Notasi Nilai Notasi Nilai
Lengkung Naik Qd0 0 0 Tp 3.00
Lengkung turun 1 Qd1 Tp 3.00 Tp + T0,3 8.49
Lengkung turun 2 Qd2 Tp + T0,3 8.49 Tp + 2,5.T0,3 16.74
Lengkung turun 3 Qd3 Tp + 2,5.T0,3 16.74 24 24

NIT HIDROGRAF SATUAN SINTETIK NAKAYASU UNTUK α = 2,5


Qt
Rumus
(m3/dt)
Qp*((t/Tp)^2,4) 0.00
35.72
619.81
497.86
Qp*(0,3^((t - Tp)/T0,3)) 399.90
321.21
258.01
207.24
166.47
Qp*(0,3^((t - Tp + 0,5*T0,3)/(1,5*T0,3))) 138.76
119.90
103.60
89.52
77.36
66.84
57.76
49.91
Qp*(0,3^((t - Tp + 1,5*T0,3)/(2*T0,3))) 43.55
39.03
34.98
31.35
28.10
25.18
22.57
20.23
: Hasil perhitungan, 2017

IDROGRAF BANJIR PERIODE ULANG 25 TAHUN UNTUK α = 2,5


R1 R2 R3 R4 R5 R6 Base Flow Q
23.05 5.98 4.22 3.22 2.84 2.59 (m3/dt) (m3/dt)
0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00
823.21 0.00 0.00 0.00 0.00 0.00 25.00 848.21
14284.75 213.65 0.00 0.00 0.00 0.00 25.00 14523.40
11474.07 3707.30 150.90 0.00 0.00 0.00 25.00 15357.26
9216.41 2977.84 2618.44 115.04 0.00 0.00 25.00 14952.74
7402.98 2391.92 2103.23 1996.24 101.59 0.00 25.00 14020.96
5946.36 1921.28 1689.40 1603.45 1762.91 92.63 25.00 13041.03
4776.35 1543.25 1356.99 1287.96 1416.04 1607.36 25.00 12012.94
3836.55 1239.60 1089.99 1034.54 1137.42 1291.09 25.00 9654.17
3197.91 995.69 875.52 830.98 913.62 1037.06 25.00 7875.77
2763.31 829.95 703.25 667.48 733.85 833.00 25.00 6555.84
2387.77 717.16 586.19 536.14 589.46 669.10 25.00 5510.81
2063.27 619.69 506.52 446.90 473.48 537.45 25.00 4672.30
1782.87 535.48 437.69 386.16 394.66 431.70 25.00 3993.55
1540.57 462.70 378.20 333.68 341.03 359.84 25.00 3441.02
1331.21 399.82 326.80 288.33 294.68 310.93 25.00 2976.78
1150.29 345.49 282.39 249.15 254.63 268.68 25.00 2575.63
1003.61 298.53 244.01 215.29 220.03 232.16 25.00 2238.64
899.47 260.47 210.85 186.03 190.12 200.61 25.00 1972.56
806.14 233.44 183.97 160.75 164.29 173.35 25.00 1746.93
722.49 209.22 164.88 140.25 141.96 149.79 25.00 1553.59
647.52 187.51 147.77 125.70 123.86 129.43 25.00 1386.79
580.33 168.05 132.43 112.65 111.01 112.93 25.00 1242.41
520.12 150.61 118.69 100.97 99.49 101.21 25.00 1116.08
466.15 134.98 106.38 90.49 89.16 90.71 25.00 1002.87
0.00 120.98 95.34 81.10 79.91 81.30 25.00 483.62
0.00 85.45 72.68 71.62 72.86 25.00 327.61
0.00 65.14 64.19 65.30 25.00 219.63
0.00 57.53 58.52 25.00 141.05
0.00 52.45 25.00 77.45
0.00 25.00 25.00
: Hasil perhitungan, 2017
WAKTU LENGKUNG HIDROGRAF "NAKAYASU" UNTUK α = 3
L1 = 31 Km → L > 15 Km
A = 11466 Km2
α = 3
Tr = 1 Jam
Tg = 2.198 Jam
Tp = 2.998 Jam
T0,3 = 6.594 Jam
Qp = 425.026 m3/dt

TABEL BATAS - BATAS WAKTU LENGKUNG HIDROGRAF UNTUK α = 3


Awal (Jam) Akhir (Jam)
No. Karakteristik Notasi
Notasi Nilai Notasi Nilai
1 Lengkung Naik Qd0 0 0 Tp 3.00
2 Lengkung turun 1 Qd1 Tp 3.00 Tp + T0,3 9.59
3 Lengkung turun 2 Qd2 Tp + T0,3 9.59 Tp + 2,5.T0,3 19.48
4 Lengkung turun 3 Qd3 Tp + 2,5.T0,3 19.48 24 24

TABEL UNIT HIDROGRAF SATUAN SINTETIK NAKAYASU UNTUK α = 3


t Qt
Notasi Rumus
(Jam) (m3/dt)
0 Qd0 Qp*((t/Tp)^2,4) 0.00
1 30.48
2 160.88
3 425.71
4 Qd1 Qp*(0,3^((t - Tp)/T0,3)) 353.96
5 294.89
6 245.68
7 204.68
8 170.52
9 142.06
10 Qd2 Qp*(0,3^((t - Tp + 0,5*T0,3)/(1,5*T0,3))) 121.33
11 107.42
12 95.11
13 84.21
14 74.56
15 66.02
16 58.45
17 51.75
18 45.82
19 40.57
20 Qd3 Qp*(0,3^((t - Tp + 1,5*T0,3)/(2*T0,3))) 36.49
21 33.31
22 30.40
23 27.75
24 25.33
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR PERIODE ULANG 25 TAHUN UNTUK α = 3


t Qt R1 R2 R3 R4 R5 R6
(Jam) (m3/dt) 23.05 5.98 4.22 3.22 2.84 2.59
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 30.48 702.48 0.00 0.00 0.00 0.00 0.00
2 160.88 3707.70 182.31 0.00 0.00 0.00 0.00
3 425.71 9811.23 962.25 128.77 0.00 0.00 0.00
4 353.96 8157.81 2546.29 679.63 98.17 0.00 0.00
5 294.89 6796.38 2117.18 1798.43 518.14 86.69 0.00
6 245.68 5662.15 1763.85 1495.35 1371.08 457.57 79.04
7 204.68 4717.21 1469.49 1245.80 1140.02 1210.82 417.20
8 170.52 3929.97 1224.25 1037.89 949.77 1006.77 1103.99
9 142.06 3274.11 1019.94 864.68 791.26 838.75 917.94
10 121.33 2796.28 849.72 720.38 659.21 698.78 764.75
11 107.42 2475.81 725.71 600.15 549.20 582.16 637.12
12 95.11 2192.06 642.54 512.57 457.54 485.01 530.79
13 84.21 1940.84 568.90 453.82 390.77 404.06 442.21
14 74.56 1718.40 503.70 401.81 345.98 345.09 368.41
15 66.02 1521.46 445.97 355.76 306.33 305.54 314.65
16 58.45 1347.09 394.86 314.99 271.22 270.53 278.58
17 51.75 1192.70 349.61 278.89 240.14 239.52 246.66
18 45.82 1056.01 309.54 246.93 212.62 212.07 218.39
19 40.57 934.98 274.06 218.63 188.25 187.77 193.36
20 36.49 840.96 242.65 193.57 166.68 166.25 171.20
21 33.31 767.58 218.25 171.39 147.57 147.19 151.58
22 30.40 700.61 199.21 154.15 130.66 130.32 134.21
23 27.75 639.48 181.83 140.70 117.52 115.39 118.83
24 25.33 583.69 165.96 128.42 107.27 103.78 105.21
0.00 151.48 117.22 97.91 94.73 94.63
0.00 106.99 89.37 86.46 86.37
0.00 81.57 78.92 78.83
0.00 72.03 71.96
0.00 65.68
0.00
Sumber : Hasil perhitungan, 2017
WAKTU LENGKUNG HIDROGRAF "NAKAYASU" UNTUK α coba2 = 1
L1 = 31 Km → L > 15 Km
A = 11466 Km2
α = 1
Tr = 1 Jam
Tg = 2.198 Jam
Tp = 2.998 Jam
T0,3 = 2.198 Jam
Qp = ### m3/dt

TABEL BATAS - BATAS WAKTU LENGKUNG HIDROGRAF UNTUK α = 1


Awal (Jam)
No. Karakteristik Notasi
Notasi Nilai
1 Lengkung Naik Qd0 0 0
2 Lengkung turun 1 Qd1 Tp 3.00
3 Lengkung turun 2 Qd2 Tp + T0,3 5.20
kelebihan 4 Lengkung turun 3 Qd3 Tp + 2,5.T0,3 8.49

TABEL UNIT HIDROGRAF SATUAN SINTETIK NAKAYASU UNTUK α = 1


t
Notasi Rumus
(Jam)
0 Qd0 Qp*((t/Tp)^2,4)
1
2
3
4 Qd1 Qp*(0,3^((t - Tp)/T0,3))
5
6 Qd2 Qp*(0,3^((t - Tp + 0,5*T0,3)/(1,5*T0,3)))
7
8
9 Qd3 Qp*(0,3^((t - Tp + 1,5*T0,3)/(2*T0,3)))
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR PERIODE ULANG 25 TAHUN UNTUK α = 1


Base Flow Q t Qt R1 R2 R3 R4
(m3/dt) (m3/dt) (Jam) (m3/dt) (m3/dt) 23.05 5.98 4.22
25.00 25.00 0 0.00 0.00 0.00 0.00 0.00
25.00 727.48 1 73.74 1699.47 0.00 0.00 0.00
25.00 3915.01 2 389.20 8969.87 441.06 0.00 0.00
25.00 10927.25 3 1029.89 23735.88 2327.93 311.52 0.00
25.00 11506.91 4 593.93 13688.19 6160.13 1644.21 237.49
25.00 11341.82 5 343.43 7915.12 3552.47 4350.86 1253.50
25.00 10854.06 6 229.99 5300.58 2054.20 2509.09 3316.99
25.00 10225.54 7 159.63 3679.01 1375.65 1450.87 1912.87
25.00 9277.63 8 110.80 2553.52 954.81 971.61 1106.11
25.00 7731.68 9 80.54 1856.30 662.71 674.37 740.73
25.00 6514.12 10 61.25 1411.57 481.76 468.07 514.13
25.00 5595.16 11 46.57 1073.39 366.34 340.27 356.84
25.00 4845.51 12 35.42 816.24 278.58 258.75 259.41
25.00 4225.61 13 26.93 620.68 211.84 196.76 197.26
25.00 3708.41 14 20.48 471.98 161.09 149.62 150.00
25.00 3274.72 15 15.57 358.91 122.49 113.77 114.07
25.00 2902.28 16 11.84 272.92 93.15 86.52 86.74
25.00 2572.52 17 9.00 207.54 70.83 65.79 65.96
25.00 2280.55 18 6.85 157.82 53.86 50.03 50.16
25.00 2022.05 19 5.21 120.01 40.96 38.04 38.14
25.00 1806.30 20 3.96 91.26 31.15 28.93 29.00
25.00 1628.56 21 3.01 69.39 23.68 22.00 22.05
25.00 1474.16 22 2.29 52.77 18.01 16.73 16.77
25.00 1338.74 23 1.74 40.13 13.69 12.72 12.75
25.00 1219.33 24 1.32 30.51 10.41 9.67 9.70
25.00 580.97 0.00 7.92 7.36 7.37
25.00 394.19 0.00 5.59 5.61
25.00 264.32 0.00 4.26
25.00 168.99 0.00
25.00 90.68
25.00 25.00
Sumber : Hasil perhitungan, 2017
Tabel 5.22 Kumulatif Hidrograf Banjir R
t
(Jam)
0
1
2
3
4
5
6
7
UNTUK α = 1 8
Akhir (Jam) 9
Notasi Nilai 10
Tp 3.00 11
Tp + T0,3 5.20 12
Tp + 2,5.T0,3 8.49 13
24 24 14
15
16
NTUK α = 1 17
Qt 18
(m3/dt) 19
0.00 20
73.74 21
389.20 22
1029.89 23
593.93 24
343.43 Cs
229.99 Ck
159.63 Sumber : Hasil perhitungan, 2017
110.80
80.54 Setelah dilakukan trial eror pada nilai α
61.25 Pada grafik menunjukan nilai α = 2 ham
46.57 Bentuk hidrograf aliran dengan α = 2 b
35.42
26.93
20.48
15.57
11.84
9.00
6.85
5.21
3.96
3.01
2.29
1.74
1.32

NTUK α = 1
R5 R6 Base Flow Q
3.22 2.84 (m3/dt) (m3/dt)
0.00 0.00 25.00 25.00
0.00 0.00 25.00 1724.47
0.00 0.00 25.00 9435.93
0.00 0.00 25.00 26400.33
0.00 0.00 25.00 21755.02
209.74 0.00 25.00 17306.69
1106.99 191.23 25.00 14504.07
2929.29 1009.31 25.00 12382.00
1689.29 2670.82 25.00 9971.15
976.82 1540.23 25.00 6476.17
654.15 890.63 25.00 4445.32
454.03 596.44 25.00 3212.32
315.13 413.97 25.00 2367.07
229.09 287.33 25.00 1767.96
174.21 208.88 25.00 1340.77
132.47 158.83 25.00 1025.54
100.73 120.78 25.00 785.84
76.60 91.84 25.00 603.56
58.25 69.84 25.00 464.95
44.29 53.11 25.00 359.55
33.68 40.39 25.00 279.40
25.61 30.71 25.00 218.45
19.48 23.35 25.00 172.10
14.81 17.76 25.00 136.86
11.26 13.50 25.00 110.06
8.56 10.27 25.00 66.48
6.51 7.81 25.00 50.52
4.95 5.94 25.00 40.15
3.77 4.52 25.00 33.28
0.00 3.43 25.00 28.43
0.00 25.00 25.00
Tabel 5.22 Kumulatif Hidrograf Banjir Rancangan Metode Nakayasu
Q (m3/dt) Q Pengamatan
α = 1,5 α=2 α=1 (m3/dt)
25.00 25.00 25.00 120.36
1279.40 1019.06 1724.47 353.34
6971.29 5529.67 9435.93 1,140.27
19492.86 15452.53 26400.33 1,310.68
18092.43 15263.66 21755.02 1,317.26
15885.28 14170.80 17306.69 1,342.32
13684.97 12826.36 14504.07 2,478.68
12107.63 11482.64 12382.00 2,480.64
10353.50 10048.53 9971.15 3,321.22
7671.57 7967.20 6476.17 2,190.29
5780.71 6396.84 4445.32 1,170.69
4431.95 5194.24 3212.32 1,172.69
3523.42 4264.91 2367.07 114.29
2850.96 3541.98 1767.96 132.74
2325.33 2955.73 1340.77 92.38
1910.65 2515.26 1025.54 49.67
1581.68 2154.63 785.84
1319.62 1856.02 603.56
1103.56 1606.75 464.95
923.56 1397.86 359.55
773.61 1222.16 279.40
648.67 1068.95 218.45
544.59 935.35 172.10
457.88 818.85 136.86
385.64 717.25 110.06
1.20 0.98 1.56 0.63
0.20 -0.45 1.59 -0.44
Sumber : Hasil perhitungan, 2017

Setelah dilakukan trial eror pada nilai α, hasil yang mendekati data pengamatan adalah pada alfa ( α=2 ).
Pada grafik menunjukan nilai α = 2 hampir mendekati dengan data Q penamatan yang menunjukan nilai CS dan Ck adalah Cs = 0.6
Bentuk hidrograf aliran dengan α = 2 berarti untuk jenis hidrograf dengan daerah pengaliran biasa.
GRAFIK HIDROGRAF BANJIR RANCANGAN METODE NAKAYASU DENGAN BER
30000.00 TINGKAT α

25000.00
Q (m3/det)

20000.00

15000.00
14504.07
13684.97
12826.36
10000.00

5000.00

2,480.64
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
t (jam)

dan Ck adalah Cs = 0.60 dan Ck = -1.04 , sedangkan Cs dan Ck yang dimiliki Q data pengamatan adalah Cs = 0.62 dan Ck = -0.65
NAKAYASU DENGAN BERBAGAI

α = 1,5
α=2
α=1
Q Pengamatan

5 16 17 18 19 20 21 22 23 24

h Cs = 0.62 dan Ck = -0.65


HIDROGRAF BANJIR SUNGAI GLADAK KECAMATAN ROGOJAMPI KABUPATEN BANYUWANGI DENGAN BERBAGAI

TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 1 TAHUN


t Qt R1 R2 R3 R4 R5 R6 Base Flow Q
(Jam) (m3/dt) 2.65 0.69 0.49 0.37 0.33 0.30 (m3/dt) (m3/dt)
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00
1 18.50 49.10 0.00 0.00 0.00 0.00 0.00 25.00 74.10
2 97.63 259.15 12.74 0.00 0.00 0.00 0.00 25.00 296.89
3 258.33 685.76 67.26 9.00 0.00 0.00 0.00 25.00 787.01
4 515.27 1367.80 177.97 47.50 6.86 0.00 0.00 25.00 1625.14
5 178.95 475.03 354.98 125.70 36.22 6.06 0.00 25.00 1022.99
6 149.09 395.76 123.28 250.72 95.83 31.98 5.52 25.00 928.10
7 124.21 329.71 102.71 87.07 191.14 84.63 29.16 25.00 849.43
8 93.92 249.32 85.57 72.54 66.38 168.80 77.16 25.00 744.78
9 83.16 220.75 64.71 60.44 55.31 58.62 153.91 25.00 638.73
10 73.63 195.45 57.29 45.70 46.08 48.84 53.45 25.00 471.81
11 65.19 173.05 50.72 40.46 34.84 40.69 44.53 25.00 409.30
12 57.72 153.21 44.91 35.83 30.85 30.77 37.10 25.00 357.67
13 41.95 111.37 39.76 31.72 27.31 27.24 28.05 25.00 290.46
14 38.29 101.65 28.90 28.08 24.18 24.12 24.84 25.00 256.78
15 34.95 92.78 26.38 20.41 21.41 21.36 21.99 25.00 229.34
16 31.90 84.69 24.08 18.63 15.56 18.91 19.47 25.00 206.34
17 29.12 77.30 21.98 17.01 14.21 13.74 17.24 25.00 186.47
18 26.58 70.55 20.06 15.52 12.97 12.54 12.53 25.00 169.18
19 24.26 64.40 18.31 14.17 11.83 11.45 11.44 25.00 156.60
20 22.14 58.78 16.71 12.93 10.80 10.45 10.44 25.00 145.12
21 20.21 53.65 15.25 11.80 9.86 9.54 9.53 25.00 134.64
22 18.45 48.97 13.92 10.77 9.00 8.71 8.70 25.00 125.07
23 16.84 44.70 12.71 9.83 8.21 7.95 7.94 25.00 116.34
24 15.37 40.80 11.60 8.98 7.50 7.25 7.25 25.00 108.37
0.00 10.59 8.19 6.84 6.62 6.61 25.00 63.86
0.00 7.48 6.25 6.04 6.04 25.00 50.80
0.00 5.70 5.52 5.51 25.00 41.73
0.00 5.03 5.03 25.00 35.06
0.00 4.59 25.00 29.59
0.00 25.00 25.00
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 10 TAHUN


t Qt R1 R2 R3 R4 R5 R6 Base Flow Q
(Jam) (m3/dt) 19.44 5.04 3.56 2.72 2.40 2.19 (m3/dt) (m3/dt)
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00
1 18.50 359.50 0.00 0.00 0.00 0.00 0.00 25.00 384.50
2 97.63 1897.44 93.30 0.00 0.00 0.00 0.00 25.00 2015.73
3 258.33 5020.95 492.44 65.90 0.00 0.00 0.00 25.00 5604.29
4 515.27 10014.72 1303.08 347.81 50.24 0.00 0.00 25.00 11740.85
5 178.95 3478.08 2599.10 920.36 265.16 44.37 0.00 25.00 7332.07
6 149.09 2897.64 902.66 1835.73 701.66 234.17 40.45 25.00 6637.30
7 124.21 2414.06 752.02 637.54 1399.52 619.65 213.50 25.00 6061.29
8 93.92 1825.46 626.52 531.15 486.05 1235.94 564.97 25.00 5295.08
9 83.16 1616.25 473.76 442.50 404.93 429.24 1126.88 25.00 4518.56
10 73.63 1431.01 419.46 334.61 337.35 357.60 391.36 25.00 3296.41
11 65.19 1267.01 371.39 296.26 255.10 297.92 326.05 25.00 2838.73
12 57.72 1121.80 328.82 262.31 225.86 225.28 271.64 25.00 2460.72
13 41.95 815.40 291.14 232.25 199.98 199.46 205.41 25.00 1968.64
14 38.29 744.26 211.62 205.63 177.06 176.60 181.86 25.00 1722.04
15 34.95 679.32 193.16 149.47 156.77 156.36 161.02 25.00 1521.10
16 31.90 620.05 176.30 136.42 113.95 138.44 142.57 25.00 1352.74
17 29.12 565.95 160.92 124.52 104.01 100.63 126.23 25.00 1207.26
18 26.58 516.57 146.88 113.66 94.93 91.85 91.75 25.00 1080.64
19 24.26 471.50 134.07 103.74 86.65 83.84 83.75 25.00 988.54
20 22.14 430.36 122.37 94.69 79.09 76.52 76.44 25.00 904.47
21 20.21 392.81 111.69 86.43 72.19 69.85 69.77 25.00 827.74
22 18.45 358.54 101.95 78.89 65.89 63.75 63.68 25.00 757.70
23 16.84 327.26 93.05 72.00 60.14 58.19 58.13 25.00 693.77
24 15.37 298.71 84.93 65.72 54.89 53.11 53.05 25.00 635.42
0.00 77.52 59.99 50.10 48.48 48.43 25.00 309.52
0.00 54.75 45.73 44.25 44.20 25.00 213.94
0.00 41.74 40.39 40.34 25.00 147.47
0.00 36.86 36.82 25.00 98.69
0.00 33.61 25.00 58.61
0.00 25.00 25.00
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 50 TAHUN


t Qt R1 R2 R3 R4 R5 R6 Base Flow Q
(Jam) (m3/dt) 27.06 7.02 4.96 3.78 3.34 3.05 (m3/dt) (m3/dt)
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00
1 18.50 500.57 0.00 0.00 0.00 0.00 0.00 25.00 525.57
2 97.63 2642.04 129.91 0.00 0.00 0.00 0.00 25.00 2796.95
3 258.33 6991.31 685.68 91.76 0.00 0.00 0.00 25.00 7793.75
4 515.27 13944.78 1814.44 484.29 69.95 0.00 0.00 25.00 16338.47
5 178.95 4842.98 3619.06 1281.53 369.21 61.78 0.00 25.00 10199.56
6 149.09 4034.75 1256.89 2556.12 977.01 326.06 56.33 25.00 9232.15
7 124.21 3361.40 1047.13 887.73 1948.73 862.81 297.29 25.00 8430.09
8 93.92 2541.82 872.38 739.58 676.79 1720.95 786.68 25.00 7363.20
9 83.16 2250.51 659.67 616.16 563.84 597.68 1569.10 25.00 6281.96
10 73.63 1992.58 584.07 465.92 469.74 497.94 544.95 25.00 4580.20
11 65.19 1764.22 517.13 412.52 355.21 414.84 454.00 25.00 3942.92
12 57.72 1562.03 457.86 365.25 314.50 313.69 378.23 25.00 3416.56
13 41.95 1135.39 405.39 323.39 278.46 277.74 286.01 25.00 2731.37
14 38.29 1036.33 294.67 286.32 246.54 245.91 253.23 25.00 2388.00
15 34.95 945.91 268.96 208.12 218.29 217.73 224.21 25.00 2108.21
16 31.90 863.38 245.49 189.96 158.67 192.77 198.51 25.00 1873.78
17 29.12 788.05 224.07 173.39 144.82 140.12 175.76 25.00 1671.21
18 26.58 719.29 204.52 158.26 132.19 127.90 127.76 25.00 1494.91
19 24.26 656.53 186.68 144.45 120.65 116.74 116.61 25.00 1366.66
20 22.14 599.25 170.39 131.85 110.13 106.55 106.44 25.00 1249.60
21 20.21 546.97 155.52 120.34 100.52 97.25 97.15 25.00 1142.75
22 18.45 499.24 141.95 109.84 91.75 88.77 88.67 25.00 1045.23
23 16.84 455.68 129.57 100.26 83.74 81.02 80.94 25.00 956.22
24 15.37 415.93 118.26 91.51 76.44 73.95 73.87 25.00 874.97
0.00 107.94 83.53 69.77 67.50 67.43 25.00 421.17
0.00 76.24 63.68 61.61 61.55 25.00 288.08
0.00 58.12 56.24 56.18 25.00 195.54
0.00 51.33 51.27 25.00 127.60
0.00 46.80 25.00 71.80
0.00 25.00 25.00
Sumber : Hasil perhitungan, 2017
GI DENGAN BERBAGAI PERIODE KALA ULANG TINGKAT α = 2

TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 2 TAHUN


t Qt R1 R2 R3 R4 R5 R6
(Jam) (m3/dt) 10.45 2.71 1.92 1.46 1.29 1.18
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 18.50 193.24 0.00 0.00 0.00 0.00 0.00
2 97.63 1019.93 50.15 0.00 0.00 0.00 0.00
3 258.33 2698.91 264.70 35.42 0.00 0.00 0.00
4 515.27 5383.21 700.44 186.96 27.00 0.00 0.00
5 178.95 1869.57 1397.09 494.72 142.53 23.85 0.00
6 149.09 1557.56 485.21 986.76 377.16 125.87 21.74
7 124.21 1297.63 404.23 342.70 752.28 333.08 114.76
8 93.92 981.24 336.77 285.51 261.26 664.35 303.69
9 83.16 868.78 254.66 237.86 217.66 230.73 605.73
10 73.63 769.21 225.47 179.86 181.34 192.22 210.37
11 65.19 681.05 199.63 159.25 137.12 160.14 175.26
12 57.72 603.00 176.75 141.00 121.41 121.10 146.01
13 41.95 438.30 156.50 124.84 107.49 107.22 110.41
14 38.29 400.06 113.75 110.53 95.17 94.93 97.76
15 34.95 365.16 103.83 80.34 84.27 84.05 86.55
16 31.90 333.30 94.77 73.33 61.25 74.42 76.63
17 29.12 304.22 86.50 66.93 55.91 54.09 67.85
18 26.58 277.67 78.95 61.09 51.03 49.37 49.32
19 24.26 253.45 72.06 55.76 46.58 45.06 45.02
20 22.14 231.33 65.78 50.90 42.51 41.13 41.09
21 20.21 211.15 60.04 46.46 38.80 37.54 37.50
22 18.45 192.73 54.80 42.40 35.42 34.27 34.23
23 16.84 175.91 50.02 38.70 32.33 31.28 31.24
24 15.37 160.56 45.65 35.33 29.51 28.55 28.52
0.00 41.67 32.25 26.93 26.06 26.03
0.00 29.43 24.58 23.78 23.76
0.00 22.44 21.71 21.69
0.00 19.82 19.79
0.00 18.07
0.00
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 20 TAHUN


t Qt R1 R2 R3 R4 R5 R6
(Jam) (m3/dt) 23.05 5.98 4.22 3.22 2.84 2.59
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 18.50 426.29 0.00 0.00 0.00 0.00 0.00
2 97.63 2249.97 110.63 0.00 0.00 0.00 0.00
3 258.33 5953.83 583.93 78.14 0.00 0.00 0.00
4 515.27 11875.44 1545.19 412.43 59.57 0.00 0.00
5 178.95 4124.30 3082.01 1091.36 314.42 52.61 0.00
6 149.09 3436.01 1070.37 2176.80 832.02 277.67 47.97
7 124.21 2862.59 891.74 756.00 1659.54 734.77 253.17
8 93.92 2164.62 742.92 629.83 576.35 1465.57 669.94
9 83.16 1916.54 561.78 524.72 480.17 508.99 1336.26
10 73.63 1696.89 497.40 396.78 400.03 424.04 464.08
11 65.19 1502.42 440.39 351.31 302.50 353.28 386.63
12 57.72 1330.23 389.92 311.05 267.83 267.14 322.11
13 41.95 966.90 345.23 275.40 237.13 236.52 243.57
14 38.29 882.54 250.94 243.83 209.96 209.42 215.65
15 34.95 805.54 229.04 177.24 185.89 185.42 190.94
16 31.90 735.26 209.06 161.77 135.12 164.17 169.06
17 29.12 671.10 190.82 147.66 123.33 119.33 149.68
18 26.58 612.55 174.17 134.77 112.57 108.92 108.80
19 24.26 559.11 158.97 123.02 102.75 99.41 99.31
20 22.14 510.32 145.10 112.28 93.78 90.74 90.64
21 20.21 465.80 132.44 102.49 85.60 82.82 82.73
22 18.45 425.16 120.89 93.54 78.13 75.60 75.51
23 16.84 388.06 110.34 85.38 71.32 69.00 68.93
24 15.37 354.20 100.71 77.93 65.09 62.98 62.91
0.00 91.93 71.13 59.41 57.49 57.42
0.00 64.93 54.23 52.47 52.41
0.00 49.50 47.89 47.84
0.00 43.71 43.67
0.00 39.86
0.00
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 100 TAHUN


t Qt R1 R2 R3 R4 R5 R6
(Jam) (m3/dt) 30.13 7.82 5.52 4.21 3.72 3.39
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 18.50 557.36 0.00 0.00 0.00 0.00 0.00
2 97.63 2941.74 144.65 0.00 0.00 0.00 0.00
3 258.33 7784.38 763.47 102.17 0.00 0.00 0.00
4 515.27 15526.62 2020.26 539.23 77.89 0.00 0.00
5 178.95 5392.35 4029.59 1426.90 411.10 68.78 0.00
6 149.09 4492.43 1399.47 2846.08 1087.83 363.05 62.72
7 124.21 3742.70 1165.91 988.43 2169.78 960.69 331.01
8 93.92 2830.15 971.34 823.48 753.56 1916.17 875.92
9 83.16 2505.79 734.50 686.05 627.80 665.48 1747.10
10 73.63 2218.61 650.32 518.78 523.03 554.42 606.76
11 65.19 1964.34 575.79 459.32 395.50 461.89 505.50
12 57.72 1739.21 509.80 406.68 350.17 349.27 421.14
13 41.95 1264.18 451.38 360.07 310.04 309.25 318.46
14 38.29 1153.88 328.09 318.80 274.51 273.80 281.96
15 34.95 1053.21 299.46 231.73 243.05 242.42 249.64
16 31.90 961.31 273.34 211.51 176.66 214.64 221.03
17 29.12 877.44 249.49 193.06 161.25 156.02 195.70
18 26.58 800.88 227.72 176.21 147.18 142.40 142.25
19 24.26 731.01 207.85 160.84 134.34 129.98 129.84
20 22.14 667.23 189.72 146.80 122.62 118.64 118.51
21 20.21 609.01 173.16 134.00 111.92 108.29 108.17
22 18.45 555.87 158.06 122.30 102.16 98.84 98.73
23 16.84 507.37 144.27 111.63 93.24 90.21 90.12
24 15.37 463.11 131.68 101.89 85.11 82.34 82.25
0.00 120.19 93.00 77.68 75.16 75.08
0.00 84.89 70.90 68.60 68.53
0.00 64.72 62.62 62.55
0.00 57.15 57.09
0.00 52.11
0.00
Sumber : Hasil perhitungan, 2017
TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 5 TAHUN
Base Flow Q t Qt R1 R2 R3 R4
(m3/dt) (m3/dt) (Jam) (m3/dt) 15.88 4.12 2.91 2.22
25.00 25.00 0 0.00 0.00 0.00 0.00 0.00
25.00 218.24 1 18.50 293.64 0.00 0.00 0.00
25.00 1095.08 2 97.63 1549.85 76.21 0.00 0.00
25.00 3024.03 3 258.33 4101.17 402.23 53.83 0.00
25.00 6322.61 4 515.27 8180.15 1064.37 284.09 41.04
25.00 3952.76 5 178.95 2840.94 2122.98 751.76 216.58
25.00 3579.30 6 149.09 2366.82 737.30 1499.45 573.12
25.00 3269.68 7 124.21 1971.83 614.26 520.75 1143.14
25.00 2857.82 8 93.92 1491.06 511.75 433.85 397.01
25.00 2440.42 9 83.16 1320.17 386.97 361.44 330.75
25.00 1783.48 10 73.63 1168.87 342.62 273.32 275.56
25.00 1537.46 11 65.19 1034.91 303.35 241.99 208.37
25.00 1334.27 12 57.72 916.30 268.59 214.26 184.49
25.00 1069.76 13 41.95 666.03 237.81 189.70 163.34
25.00 937.21 14 38.29 607.92 172.85 167.96 144.62
25.00 829.20 15 34.95 554.88 157.77 122.09 128.05
25.00 738.70 16 31.90 506.47 144.01 111.43 93.08
25.00 660.50 17 29.12 462.28 131.44 101.71 84.95
25.00 592.44 18 26.58 421.94 119.97 92.84 77.54
25.00 542.93 19 24.26 385.13 109.51 84.74 70.78
25.00 497.74 20 22.14 351.53 99.95 77.34 64.60
25.00 456.49 21 20.21 320.86 91.23 70.60 58.96
25.00 418.85 22 18.45 292.86 83.27 64.44 53.82
25.00 384.48 23 16.84 267.31 76.01 58.81 49.12
25.00 353.12 24 15.37 243.99 69.37 53.68 44.84
25.00 177.94 0.00 63.32 49.00 40.93
25.00 126.56 0.00 44.72 37.36
25.00 90.83 0.00 34.10
25.00 64.61 0.00
25.00 43.07
25.00 25.00
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 25 TAHUN


Base Flow Q t Qt R1 R2 R3 R4
(m3/dt) (m3/dt) (Jam) (m3/dt) 23.85 6.19 4.37 3.33
25.00 25.00 0 0.00 0.00 0.00 0.00 0.00
25.00 451.29 1 18.50 441.07 0.00 0.00 0.00
25.00 2385.61 2 97.63 2327.96 114.47 0.00 0.00
25.00 6640.91 3 258.33 6160.19 604.17 80.85 0.00
25.00 13917.63 4 515.27 12287.04 1598.74 426.72 61.64
25.00 8689.71 5 178.95 4267.25 3188.83 1129.18 325.32
25.00 7865.85 6 149.09 3555.10 1107.47 2252.25 860.86
25.00 7182.82 7 124.21 2961.80 922.65 782.20 1717.06
25.00 6274.24 8 93.92 2239.65 768.67 651.66 596.33
25.00 5353.46 9 83.16 1982.97 581.25 542.91 496.81
25.00 3904.23 10 73.63 1755.71 514.64 410.53 413.90
25.00 3361.52 11 65.19 1554.49 455.66 363.48 312.98
25.00 2913.27 12 57.72 1376.33 403.43 321.83 277.11
25.00 2329.76 13 41.95 1000.41 357.20 284.94 245.35
25.00 2037.34 14 38.29 913.13 259.64 252.29 217.23
25.00 1799.07 15 34.95 833.46 236.98 183.38 192.34
25.00 1599.43 16 31.90 760.74 216.31 167.38 139.80
25.00 1426.92 17 29.12 694.37 197.43 152.78 127.61
25.00 1276.78 18 26.58 633.78 180.21 139.45 116.47
25.00 1167.56 19 24.26 578.48 164.48 127.28 106.31
25.00 1067.88 20 22.14 528.01 150.13 116.17 97.03
25.00 976.88 21 20.21 481.94 137.03 106.04 88.57
25.00 893.83 22 18.45 439.89 125.08 96.79 80.84
25.00 818.03 23 16.84 401.51 114.16 88.34 73.79
25.00 748.84 24 15.37 366.48 104.20 80.63 67.35
25.00 362.38 0.00 95.11 73.60 61.47
25.00 249.04 0.00 67.18 56.11
25.00 170.23 0.00 51.21
25.00 112.38 0.00
25.00 64.86
25.00 25.00
Sumber : Hasil perhitungan, 2017

TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULANG 200 TAHUN


Base Flow Q t Qt R1 R2 R3 R4
(m3/dt) (m3/dt) (Jam) (m3/dt) 35.98 9.34 6.59 5.03
25.00 25.00 0 0.00 0.00 0.00 0.00 0.00
25.00 582.36 1 18.50 665.46 0.00 0.00 0.00
25.00 3111.39 2 97.63 3512.30 172.70 0.00 0.00
25.00 8675.01 3 258.33 9294.17 911.54 121.98 0.00
25.00 18189.00 4 515.27 18538.02 2412.10 643.82 92.99
25.00 11353.72 5 178.95 6438.20 4811.14 1703.65 490.83
25.00 10276.57 6 149.09 5363.75 1670.89 3398.08 1298.82
25.00 9383.53 7 124.21 4468.61 1392.04 1180.14 2590.61
25.00 8195.61 8 93.92 3379.06 1159.73 983.19 899.71
25.00 6991.72 9 83.16 2991.80 876.96 819.11 749.56
25.00 5096.92 10 73.63 2648.92 776.46 619.39 624.47
25.00 4387.35 11 65.19 2345.33 687.47 548.41 472.21
25.00 3801.28 12 57.72 2076.54 608.68 485.55 418.09
25.00 3038.37 13 41.95 1509.37 538.92 429.91 370.18
25.00 2656.05 14 38.29 1377.68 391.72 380.64 327.75
25.00 2344.52 15 34.95 1257.48 357.55 276.67 290.19
25.00 2083.50 16 31.90 1147.76 326.35 252.53 210.93
25.00 1857.95 17 29.12 1047.62 297.88 230.50 192.53
25.00 1661.65 18 26.58 956.22 271.89 210.39 175.73
25.00 1518.85 19 24.26 872.79 248.16 192.03 160.40
25.00 1388.51 20 22.14 796.64 226.51 175.28 146.40
25.00 1269.55 21 20.21 727.13 206.75 159.98 133.63
25.00 1160.96 22 18.45 663.69 188.71 146.03 121.97
25.00 1061.85 23 16.84 605.78 172.25 133.29 111.33
25.00 971.38 24 15.37 552.93 157.22 121.66 101.61
25.00 466.11 0.00 143.50 111.04 92.75
25.00 317.92 0.00 101.35 84.66
25.00 214.88 0.00 77.27
25.00 139.24 0.00
25.00 77.11
25.00 25.00
Sumber : Hasil perhitungan, 2012
ANG 5 TAHUN
R5 R6 Base Flow Q
1.96 1.79 (m3/dt) (m3/dt)
0.00 0.00 25.00 25.00
0.00 0.00 25.00 318.64
0.00 0.00 25.00 1651.06
0.00 0.00 25.00 4582.23
0.00 0.00 25.00 9594.65
36.24 0.00 25.00 5993.50
191.27 33.04 25.00 5426.01
506.13 174.39 25.00 4955.51
1009.53 461.48 25.00 4329.66
350.61 920.45 25.00 3695.40
292.09 319.67 25.00 2697.13
243.35 266.32 25.00 2323.29
184.01 221.88 25.00 2014.52
162.92 167.78 25.00 1612.59
144.25 148.55 25.00 1411.16
127.72 131.52 25.00 1247.03
113.08 116.45 25.00 1109.51
82.20 103.10 25.00 990.68
75.02 74.94 25.00 887.26
68.48 68.40 25.00 812.03
62.50 62.44 25.00 743.36
57.05 56.99 25.00 680.69
52.07 52.02 25.00 623.48
47.53 47.48 25.00 571.26
43.38 43.34 25.00 523.60
39.60 39.55 25.00 257.40
36.14 36.10 25.00 179.32
32.99 32.95 25.00 125.04
30.11 30.08 25.00 85.19
0.00 27.45 25.00 52.45
0.00 25.00 25.00

ANG 25 TAHUN TABEL HIDROGRAF BANJIR RANCANGAN PERIODE ULAN


R5 R6 Base Flow Q t Qt R1 R2
2.94 2.68 (m3/dt) (m3/dt) (Jam) (m3/dt) 24.93 6.47
0.00 0.00 25.00 25.00 0 0.00 0.00 0.00
0.00 0.00 25.00 466.07 1 18.50 461.05 0.00
0.00 0.00 25.00 2467.43 2 97.63 2433.44 119.66
0.00 0.00 25.00 6870.21 3 258.33 6439.32 631.55
0.00 0.00 25.00 14399.14 4 515.27 12843.79 1671.19
54.43 0.00 25.00 8990.02 5 178.95 4460.61 3333.32
287.30 49.63 25.00 8137.62 6 149.09 3716.19 1157.65
760.24 261.95 25.00 7430.91 7 124.21 3096.01 964.46
1516.37 693.16 25.00 6490.84 8 93.92 2341.13 803.50
526.63 1382.57 25.00 5538.14 9 83.16 2072.82 607.59
438.74 480.16 25.00 4038.68 10 73.63 1835.26 537.96
365.52 400.03 25.00 3477.16 11 65.19 1624.93 476.30
276.40 333.27 25.00 3013.38 12 57.72 1438.70 421.71
244.72 252.01 25.00 2409.64 13 41.95 1045.75 373.38
216.68 223.13 25.00 2107.09 14 38.29 954.50 271.40
191.84 197.56 25.00 1860.56 15 34.95 871.22 247.72
169.86 174.92 25.00 1654.00 16 31.90 795.21 226.11
123.46 154.87 25.00 1475.51 17 29.12 725.83 206.38
112.69 112.57 25.00 1320.17 18 26.58 662.50 188.37
102.86 102.75 25.00 1207.16 19 24.26 604.70 171.94
93.88 93.78 25.00 1104.02 20 22.14 551.94 156.94
85.69 85.60 25.00 1009.88 21 20.21 503.78 143.24
78.22 78.13 25.00 923.95 22 18.45 459.83 130.75
71.39 71.31 25.00 845.51 23 16.84 419.71 119.34
65.16 65.09 25.00 773.92 24 15.37 383.09 108.93
59.48 59.41 25.00 374.07 0.00 99.42
54.29 54.23 25.00 256.80 0.00
49.55 49.50 25.00 175.26
45.23 45.18 25.00 115.41
0.00 41.24 25.00 66.24
0.00 25.00 25.00
Sumber : Hasil perhitungan, 2017

ANG 200 TAHUN


R5 R6 Base Flow Q
4.44 4.05 (m3/dt) (m3/dt)
0.00 0.00 25.00 25.00
0.00 0.00 25.00 690.46
0.00 0.00 25.00 3710.00
0.00 0.00 25.00 10352.69
0.00 0.00 25.00 21711.93
82.13 0.00 25.00 13550.94
433.46 74.88 25.00 12264.88
1147.01 395.21 25.00 11198.63
2287.81 1045.80 25.00 9780.31
794.55 2085.95 25.00 8342.93
661.95 724.44 25.00 6080.63
551.48 603.54 25.00 5233.44
417.02 502.82 25.00 4533.70
369.22 380.22 25.00 3622.82
326.91 336.65 25.00 3166.34
289.44 298.06 25.00 2794.39
256.27 263.90 25.00 2482.75
186.27 233.66 25.00 2213.45
170.02 169.84 25.00 1979.08
155.19 155.02 25.00 1808.59
141.65 141.49 25.00 1652.97
129.29 129.15 25.00 1510.93
118.01 117.88 25.00 1381.28
107.71 107.60 25.00 1262.95
98.31 98.21 25.00 1154.94
89.74 89.64 25.00 551.67
81.91 81.82 25.00 374.73
74.76 74.68 25.00 251.71
68.24 68.16 25.00 161.40
0.00 62.22 25.00 87.22
0.00 25.00 25.00
Tabel 5.23 Debit Banjir Rancangan Metod
t Qt
(Jam) (m3/dt)
0 0.00
1 18.50
2 97.63
3 258.33
4 515.27
5 178.95
6 149.09
7 124.21
8 93.92
9 83.16
10 73.63
11 65.19
12 57.72
13 41.95
14 38.29
15 34.95
16 31.90
17 29.12
18 26.58
19 24.26
20 22.14
21 20.21
22 18.45
23 16.84
24 15.37
Cs 3.01
Ck 10.60
Sumber : Hasil perhitungan, 2017

Dari analisa hidrograf banjir rancangan k


Q20 tahun
Q50 tahun
Q100 tahun
Hasil hidrograf banjir rancangan kala ulan
! 100 tahun digunakan untuk perencanaa
ANCANGAN PERIODE ULANG 30 TAHUN ! 50 tahun digunakan untuk perencanaa
R3 R4 R5 R6 Base Flow Q ! 20 tahun digunakan untuk perencanaan sal
4.57 3.33 3.08 2.80 (m3/dt) (m3/dt) Untuk perencanaan drainase pada :
0.00 0.00 0.00 0.00 25.00 25.00 ! Saluran primer menggunakan Q 10 tahu
0.00 0.00 0.00 0.00 25.00 486.05 ! Saluran sekunder menggunakan Q 5 tah
0.00 0.00 0.00 0.00 25.00 2578.10 ! Saluran tersier menggunakan Q 2 tahun
84.51 0.00 0.00 0.00 25.00 7180.38 ! Saluran quarter menggunakan Q 1 tahu
446.06 61.64 0.00 0.00 25.00 15047.67
1180.35 325.32 56.90 0.00 25.00 9381.51
2354.31 860.86 300.32 51.88 25.00 8466.21
817.64 1717.06 794.69 273.82 25.00 7688.68
681.19 596.33 1585.08 724.57 25.00 6756.80
567.51 496.81 550.49 1445.22 25.00 5765.44
429.14 413.90 458.62 501.92 25.00 4201.80
379.95 312.98 382.08 418.16 25.00 3619.41
336.41 277.11 288.92 348.37 25.00 3136.23
297.85 245.35 255.81 263.43 25.00 2506.58
263.72 217.23 226.49 233.24 25.00 2191.59
191.69 192.34 200.54 206.51 25.00 1935.01
174.96 139.80 177.55 182.84 25.00 1721.48
159.70 127.61 129.06 161.89 25.00 1535.46
145.76 116.47 117.80 117.67 25.00 1373.58
133.05 106.31 107.52 107.40 25.00 1255.91
121.44 97.03 98.14 98.03 25.00 1148.52
110.84 88.57 89.58 89.48 25.00 1050.49
101.17 80.84 81.76 81.67 25.00 961.02
92.34 73.79 74.63 74.55 25.00 879.35
84.29 67.35 68.12 68.04 25.00 804.81
76.93 61.47 62.17 62.11 25.00 387.11
70.22 56.11 56.75 56.69 25.00 264.77
0.00 51.21 51.80 51.74 25.00 179.75
0.00 47.28 47.23 25.00 119.50
0.00 43.11 25.00 68.11
0.00 25.00 25.00
Debit Banjir Rancangan Metode Nakayasu Sungai Bendo Berbagai Kala Ulang
Q (m3/dt)
1 Tahun 2 Tahun 5 Tahun 10 Tahun 20 Tahun 25 Tahun 30 Tahun 50 Tahun 100 Tahun 200 Tahun
25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00
74.10 218.24 318.64 384.50 451.29 486.05 466.07 525.57 582.36 690.46
296.89 1095.08 1651.06 2015.73 2385.61 2578.10 2467.43 2796.95 3111.39 3710.00
787.01 3024.03 4582.23 5604.29 6640.91 7180.38 6870.21 7793.75 8675.01 10352.69
1625.14 6322.61 9594.65 11740.85 13917.63 15047.67 14399.14 16338.47 18189.00 21711.93
1022.99 3952.76 5993.50 7332.07 8689.71 9381.51 8990.02 10199.56 11353.72 13550.94
928.10 3579.30 5426.01 6637.30 7865.85 8466.21 8137.62 9232.15 10276.57 12264.88
849.43 3269.68 4955.51 6061.29 7182.82 7688.68 7430.91 8430.09 9383.53 11198.63
744.78 2857.82 4329.66 5295.08 6274.24 6756.80 6490.84 7363.20 8195.61 9780.31
638.73 2440.42 3695.40 4518.56 5353.46 5765.44 5538.14 6281.96 6991.72 8342.93
471.81 1783.48 2697.13 3296.41 3904.23 4201.80 4038.68 4580.20 5096.92 6080.63
409.30 1537.46 2323.29 2838.73 3361.52 3619.41 3477.16 3942.92 4387.35 5233.44
357.67 1334.27 2014.52 2460.72 2913.27 3136.23 3013.38 3416.56 3801.28 4533.70
290.46 1069.76 1612.59 1968.64 2329.76 2506.58 2409.64 2731.37 3038.37 3622.82
256.78 937.21 1411.16 1722.04 2037.34 2191.59 2107.09 2388.00 2656.05 3166.34
229.34 829.20 1247.03 1521.10 1799.07 1935.01 1860.56 2108.21 2344.52 2794.39
206.34 738.70 1109.51 1352.74 1599.43 1721.48 1654.00 1873.78 2083.50 2482.75
186.47 660.50 990.68 1207.26 1426.92 1535.46 1475.51 1671.21 1857.95 2213.45
169.18 592.44 887.26 1080.64 1276.78 1373.58 1320.17 1494.91 1661.65 1979.08
156.60 542.93 812.03 988.54 1167.56 1255.91 1207.16 1366.66 1518.85 1808.59
145.12 497.74 743.36 904.47 1067.88 1148.52 1104.02 1249.60 1388.51 1652.97
134.64 456.49 680.69 827.74 976.88 1050.49 1009.88 1142.75 1269.55 1510.93
125.07 418.85 623.48 757.70 893.83 961.02 923.95 1045.23 1160.96 1381.28
116.34 384.48 571.26 693.77 818.03 879.35 845.51 956.22 1061.85 1262.95
108.37 353.12 523.60 635.42 748.84 804.81 773.92 874.97 971.38 1154.94
1.59 1.59 1.59 1.59 1.59 1.60 1.59 1.59 1.59 1.59
2.60 2.60 2.60 2.60 2.60 2.65 2.60 2.60 2.60 2.60
Hasil perhitungan, 2017

a hidrograf banjir rancangan kala ulang diperoleh bahwa debit puncak pada :
= 8689.71 m3/detik
= 10199.56 m3/detik
= 11353.72 m3/detik
graf banjir rancangan kala ulang :
n digunakan untuk perencanaan bendungan atau waduk
digunakan untuk perencanaan bendung atau bendungan
digunakan untuk perencanaan saluran pada sungai
encanaan drainase pada :
rimer menggunakan Q 10 tahun
ekunder menggunakan Q 5 tahun
ersier menggunakan Q 2 tahun
uarter menggunakan Q 1 tahun
GRAFIK HIDROGRAF BANJIR RANCANGAN METODE
20000.00

18000.00

16000.00

14000.00
Q (m3/det)

12000.00

10000.00
10276.57

8000.00 7865.85

6000.00

4000.00

2000.00

0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
t (jam)

GRAFIK HIDROGRAF BANJIR RANCANGAN METODE


20000.00

18000.00

16000.00
GRAFIK HIDROGRAF BANJIR RANCANGAN METODE
20000.00

18000.00

16000.00

14000.00

Q (m3/det)

12000.00

10000.00
10276.57

8000.00 7865.85

6000.00

4000.00

2000.00

0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
t (jam)
CANGAN METODE NAKAYASU BERBAGAI KALA ULANG

20 Tahun
100 Tahun

11 12 13 14 15 16 17 18 19 20 21 22 23 24
t (jam)

CANGAN METODE NAKAYASU BERBAGAI KALA ULANG


CANGAN METODE NAKAYASU BERBAGAI KALA ULANG

20 Tahun
100 Tahun

11 12 13 14 15 16 17 18 19 20 21 22 23 24
t (jam)
No t I Ixt I^2 I^2 x t log t log I log t x log I (log I)^2
1 5 0.00 0.00 0.00 0.70 Err:502 Err:502 Err:502
2 10 0.00 0.00 0.00 1.00 Err:502 Err:502 Err:502
3 20 0.00 0.00 0.00 1.30 Err:502 Err:502 Err:502
4 30 0.00 0.00 0.00 1.48 Err:502 Err:502 Err:502
5 40 0.00 0.00 0.00 1.60 Err:502 Err:502 Err:502
6 60 0.00 0.00 0.00 1.78 Err:502 Err:502 Err:502
Jumlah 165.00 0.00 0.00 0.00 0.00 7.86 Err:502 Err:502 Err:502

Intensitas Curah Hujan (mm/jam)


a= #DIV/0!
b= #DIV/0!
log m = Err:502 Err:502
n= Err:502 GRAFIK INTENSITAS HUJAN
12.00
c= #DIV/0!
d= #DIV/0!
10.00

8.00

6.00

4.00

2.00

0.00
5 10 20 30 40
Waktu (menit)
(log t)^2 √t I x √t I^2 x √t I Talbot Alfa Talbot I Sherman Alfa Sherman I Ishiguro
0.49 2.24 0.00 0.00 #DIV/0! #DIV/0! Err:502 Err:502 #DIV/0!
1.00 3.16 0.00 0.00 #DIV/0! #DIV/0! Err:502 Err:502 #DIV/0!
1.69 4.47 0.00 0.00 #DIV/0! #DIV/0! Err:502 Err:502 #DIV/0!
2.18 5.48 0.00 0.00 #DIV/0! #DIV/0! Err:502 Err:502 #DIV/0!
2.57 6.32 0.00 0.00 #DIV/0! #DIV/0! Err:502 Err:502 #DIV/0!
3.16 7.75 0.00 0.00 #DIV/0! #DIV/0! Err:502 Err:502 #DIV/0!
11.09 29.42 0.00 0.00 #DIV/0! #DIV/0! Err:502 Err:502 #DIV/0!
Rata-Rata #DIV/0! #DIV/0! Err:502 Err:502 #DIV/0!

NTENSITAS HUJAN Kesimpulan :


Jadi nilai persamaan yang cocok adalah nilai yang mendekati nilai intensitas ( I ) a
Dengan ditunjukan nilai rata-rata alfa yang terkecil sebesar alfa = 0.16

I Talbot
I Sherman
I Ishiguro
I

30 40 60
tu (menit)
Alfa Ishiguro
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

mendekati nilai intensitas ( I ) adalah persamaan intensitas hujan Ishiguro


sebesar alfa = 0.16