ABSTRACT
New and renewable energy (EBT) is a government policy to save on the use
of fuel oil (BBM) or fossil fuels. In order to support the achievement of the New
RenewableEnergy (EBT) mix target and support the Government's policy on the
use of solar power, PLN Indonesia Power Bali PGU is now installing floating solar
power plants (PLTS) above the surface of the Muara Nusa Dua reservoir . The 100
kWp Muara Nusa floating PLTS is a showcase at the G20 activities held in Bali. A
feasibility analysis of the 100 kWp Floating PLTS in the Muara Nusa Dua reservoir
was carried out by PLN Indonesia Power Bali PGU both technically and
economically. The data collection method in this study is to take real time data
from the production produced by the floating PLTS starting in October 2022 and
the costs incurred each month for PLTS investment. The simulations results of this
study indicate that PLTS can generates a power of 145.930,08 kWh and
economically can generate a profit of Rp. 236.406,730.00 in a year. Based on these
results, the 100 kWp Muara Nusa Dua Floating PLTS PLN Indonesia Power Bali
PGU is feasible to operate based on technical and economic analysis.
ii
DAFTAR ISI
iii
2.8 Break Even Point ( BEP) ........................ Error! Bookmark not defined.
BAB III METODOLOGI PENELITIAN .............. Error! Bookmark not defined.
3.1 Lokasi Penelitian ..................................... Error! Bookmark not defined.
3.2 Tahapan Pelaksanaan Tugas Akhir ...... Error! Bookmark not defined.
3.3 Tahapan Penelitian Tugas Akhir ........... Error! Bookmark not defined.
BAB IV PEMBAHASAN......................................... Error! Bookmark not defined.
4.1 Data dan Pembahasan ............................ Error! Bookmark not defined.
4.2 Komponen Penyusun PLTS Terapung Muara Nusa Dua ........ Error!
Bookmark not defined.
4.2.1 Komponen Utama ......................... Error! Bookmark not defined.
4.2.2 Komponen pendukung .................. Error! Bookmark not defined.
4.3 Analisis Teknis ........................................ Error! Bookmark not defined.
4.4 Analisa Ekonomis .................................... Error! Bookmark not defined.
BAB V KESIMPULAN DAN SARAN ................... Error! Bookmark not defined.
5.1 Kesimpulan .............................................. Error! Bookmark not defined.
5.2 Saran .....................................................................................................60
DAFTAR PUSTAKA ...........................................................................................61
LAMPIRAN .............................................................. Error! Bookmark not defined.
iv
DAFTAR GAMBAR
Gambar 2.1 Sistem Tenaga Listrik ......................... Error! Bookmark not defined.
Gambar 2.2 Sistem Kelistrikan .............................. Error! Bookmark not defined.
Gambar 2.3 Proses Penerimaan BBM (HSD) ke PLTDG Pesanggaran ........ Error!
Bookmark not defined.
Gambar 2. 4 Visual Solar PV 100 kWp di waduk muara Nusa Dua ............. Error!
Bookmark not defined.
Gambar 2. 5 Visual inspeksi Panel Surya Waduk Muara Nusa Dua ............. Error!
Bookmark not defined.
Gambar 2. 6 Prinsip Kerja PLTS On-grid .............. Error! Bookmark not defined.
Gambar 2. 7 Modul Solar Panel ............................. Error! Bookmark not defined.
Gambar 2. 8 kWh dikirim PLN dan kWh dikirim pelanggan ..... Error! Bookmark
not defined.
Gambar 2. 9 Kurva I-V pada modul sel surya........................................................21
Gambar 3.1 Profil PLTS Terapung Waduk Muara Nusa 2 PLN Indonesia Power
Bali.........................................................................................................................27
Gambar 3.2 Visual Solar PV 100 kWp di Waduk Muara Nusa Dua.....................27
Gambar 3.3 Diagram Alir Tahapan Penelitian.......................................................29
Gambar 3.4 Diagram Alir Penyusunan Tugas Akhir (Sumber : Penulis)..............30
Gambar 4.1 PLTS Terapung Muara Nusa Dua Bali PGU ... Error! Bookmark not
defined.
Gambar 4.2 Web Global Solar Atlas...................... Error! Bookmark not defined.
Gambar 4.3 Spesifiaksi modul Surya ISG - PV ..... Error! Bookmark not defined.
Gambar 4.4 Layout Stering PV PLTAS Muara Nusa Dua .. Error! Bookmark not
defined.
Gambar 4.5 Inverter SUN200-100KTL-M1 .......... Error! Bookmark not defined.
Gambar 4.6 Pelampung Sungrow...........................................................................39
Gambar 4.7 Kontruksi Rangka Jangkar ................. Error! Bookmark not defined.
Gambar 4.8 Combiner Box .................................... Error! Bookmark not defined.
Gambar 4.9 Pyranometer ....................................... Error! Bookmark not defined.
Gambar 4.10 Gambar Grafik Produksi Nov 22 ..... Error! Bookmark not defined.
Gambar 4.11 Gambar Grafik Produksi Des 22 ...... Error! Bookmark not defined.
v
Gambar 4.12 Gambar Grafik Produksi Januari 2023 ........... Error! Bookmark not
defined.
DAFTAR TABEL
Tabel 4.1 Layout Feature PLTS Muara Nusa Dua . Error! Bookmark not defined.
Tabel 4.2 Spesifikasi Modul Surya ISG-HCP 144-Solar PV.................................36
Tabel 4.3 Spesifikasi Inverter Merek SUN200-100KTL-M1 ..... Error! Bookmark
not defined.
vi
BAB I
PENDAHULUAN
1
konsumsi energi total dunia selama satu tahun. Dengan berlimpahnya sumber
energi surya yang belum dimanfaatkan secara optimal, sedangkan di sisi lain
ada sebagian wilayah Indonesia yang belum teraliri listrik karena tidak
terjangkau oleh jaringan listrik PLN, sehingga Pembangkit Listrik Tenaga
Surya (PLTS) dengan sistemnya yang modular dan mudah dipindahkan
merupakan salah satu solusi yang dapat dipertimbangkan sebagai salah satu
pembangkit listrik alternatif. Namun biaya pembangkitan PLTS masih lebih
mahal apabila dibandingkan dengan biaya pembangkitan pembangkit listrik
tenaga konvensional, karena sampai saat ini piranti utama untuk
mengkonversi energi matahari menjadi energi listrik (modul fotovoltaik)
masih merupakan piranti yang didatangkan dari luar negeri.
2
penopang agar panel surya tidak tenggelam. PLTS terapung Muara Nusa Dua
ini menjadi sorotan karena PLTS ini merupakan PLTS terapung diatas air
pertama yang ada di Indonesia. Hal ini juga yang menyebabkan banyak orang
yang datang untuk melihat PLTS ini dan sesekali mengambil foto bersama
PLTS Muara Nusa Dua ini yang juga menyebabkan semakin ramainya
pengunjung yang datang ke daerah wisata didekat PLTS Muara Nusa Dua.
Hasil produksi dari PLTS Terapung Muara Nusa Dua ini akan digunakan
untuk jaringan 380V terdekat yang terinterkoneksi dengan PLTS tersebut.
Dengan adanya PLTS ini akan memprioitaskan pemenuhan pasokan listrik di
daerah tersebut yang merupakan daerah wisata dan juga tempat beribadah
sehingga system kelistrikan didaerah tersebut lebih handal. Proyek
pembangunan PLTS Muara Nusa Dua 100 kWp ini, dikerjakan oleh enjiner-
enjiner terbaik PLN Indonesia Power dan siap mendukung sistem kelistrikan
Kota Denpasar. Karena PLTS ini masih merupakan Pembangkit yang baru
dan masih belum banyak menjadi objek penelitian. Sehingga pada penelitian
ini, penulis akan membahas analisa tentang kelayakan Pembangkit Listrik
Tenaga Surya (PLTS) Terapung 100 kWp Waduk Muara Nusa Dua PLN
Indonesia Power Bali Power Generation Unit.
3
1.3 Tujuan Penelitian
Dengan segala keterbatasan hak akses dan waktu pengumpulan data maka
penulis melakukan pembatasan pembahasan yaitu:
1. Analisis efektifitas pemasangan PLTS Waduk Muara Nusa Dua PLN
Indonesia Power dari segi teknis.
2. Analisis efektifitas pemasangan PLTS Waduk Muara Nusa Dua PLN
Indonesia Power dari segi ekonomis dengan perhitungan.
BAB I. PENDAHULUAN
Pada bab ini dijelaskan tentang isi dari materi yang menyangkut dari
latar belakang, rumusan masalah, batasan masalah serta maksud dan tujuan
penelitian.
4
BAB III. METODOLOGI PENELITIAN
Bab ini dijelaskan mengenai lokasi penelitian, metode metode yang
digunakan untuk penelitian, dan alur penelitiannya.
BAB V. PENUTUP
Bab ini berisikan kesimpulan diperoleh dari hasil analisa serta saran-saran
untuk pengembangan selanjutnya