You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

E-1283.25
REF. DWG. NO. REFERENCE DRAWING TITLE

ACCESS
A151-000-16-47-0-001 OVERALL PLOT PLAN

A151-019-16-43-0-001 EQUIPMENT LAYOUT-WHFU (WAX HYDRO FINISHING UNIT)

A151-019-16-47-0-301 U/G PIPING LAYOUT (WHFU)

A
N 220000 2000 2000 2000 2000

N M
99.85 (LPP) 99.85 (LPP) 99.89 (LPP) 99.93(LPP)
NOTES :-

1300
19-VV-122 1. ALL DIMENSIONS ARE IN MM EXCEPT LEVELS AND CO-ORDINATES

250
WHICH ARE IN METERS.

1300
1000 CL. EL. 102250 2. LEVEL 100.00 IS THE HPP( HIGH POINT OF PAVEMENT) OF THE UNIT
AND CORRESPONDS TO LEVEL 90.0 M ABOVE M.S.L.
3500 1200 3. RCC PAVEMENT AND DRAINS SHALL BE MADE ONLY AFTER CASTING
B

B
2500
FOUNDATIONS, LAYING ALL UNDERGROUND PIPING, U/G PORTION OF
VENT PIPES, TRENCHES FOR FIRE WATER PIPING, ELECTRICAL
EARTHING STRIPS, CATHODIC PROTECTION, SLEEVES ETC. IN
POSITION.

19-VV-101
ACCESS 4. RCC CABLE / FIRE WATER TRENCH SHALL BE CONTRUCTED AS PER
RELEVANT STRUCTURAL DRAWINGS.

ACCESS L BTL. EL. 103200 5. FOR DETAILS OF RIDGE LINE IN PAVEMENT REFER U/G AREA

HPP)

LPP)
DRAWINGS.
5000 3000
N-211.50

00(

93(
1500

100.

99.
2300
C

C
1500
19-CC-102/101
BTL. EL. 106000(FOR CC-102)

1500

1500
1000
1500

500
LEGEND:

K 3200 2
HPP HIGH POINT OF PAVEMENT (100.00)
D

D
E 1257000
LPP LOW POINT OF PAVEMENT (99.85)

1000
CB CATCH BASIN

RCC PAVEMENT TYPE-I

RCC PAVEMENT TYPE-II

100.00 (HPP)

LPP)
E

E
THICKENED PAVEMENT

93(
axs]u

99.
2500
k,
n,t

hat
kkjf

ended use.
eem entt
xh]u m /

HPP)
CB-

00(
k,

CATCHMENT AREA
ess agr
xk]u udy dh t

100.
nt
he i

F
3100 1500
99.85(LPP)
ort
s expr

2000
100.00(HPP)
owerf

1500
k,

'
kk t

ower

H
d;

r
he bor

1000 1500 2000 1500


nzrf
rLks gksxk A

r
he bor
qu% eqf

ot

UNIT DRAIN

2000
oaned on t
endert

5000 2500 19-GN-102B


WITH GRATING
ks m Ugsa i
iesa nh xbZ Lkgef

G
he l

99.85 (LPP)
yl
ven by t
dur

el

THIS DRAWING IS VALID FOR CONSTRUCTION OF


3750
e m er
k gS f

RCC PAVEMNET ONLY


kr:

en consentgi

1500
3000 1500
TED. They ar
d;
yf[

19-AE/AT-2001
kf
kZ dks f

G
V Lke>kSr

LPP)
HPP)

93(
00(
3000
3250
dr

99.
100.
kkj

H
t
"
km /
g Li

i
ed by a wr
MI

RCC PAVEMENT SHALL BE CONSTRUCTED AFTER


kZ us ;
kj

99.85 (LPP)
A LI

CONSTRUCTION OF ALL UNDERGROUND PIPING,


kkjnsus okys }

TRENCHES, ELECTRICAL EARTHING STRIPS ETC.


NDI
dr

2000
kkj

t
NEERS I
mit
n,x,gSa vkSjm /

ed way per
ksx m /

E 1305000
2
y ofENGI
giz;

1500
F
t
ksx gksxk vkSj;

I
mi

1500
kkjf

7000
19-EE-101
i
he l
t
s ek= m /

CL. EL. 101500

1500
oper
nt

N
ed orused,excepti
he pr

N=220.00
RrgSA ;
z;

4500
et
ksx ds vykok budk dksbZ vU;i

m atar
f
eVsM dh Lkai

COMPRESSOR SHED
FOR FLOORING DETAILS
or
sf

E= 1305.
E= 1257.
REFER RELEVANT
J

J
hi

1500
t

STRL DRAWING
ven on t
bi
yf

ed,exhi

HYDRO FINISHING
kf

1500
7000
M;

19-EE-107 UNIT
LkZ baf

s gi

00
oduced,copi

1500
CL. EL. 101800

00
z;

l
hi

ai

ACCESS
u;

gn and det
ut
hf
ervkSjf
+kbu bat

ACCESS
axs vkSju gh Lkhf

epr
Mt

N-160.00
ng,desi

K
grf

lnotbe r

N=134.00
uf
esa f

awi
oa bl

LPP)
HPP)
l
hey wi
The dr

93(
k,
k,

00(
D
d,t

99.
s[

100.
qrvkj
kZrf

t
'
zLr
znf

UNIT DRAIN WITH HEAVY DUTY


i
i

KEY PLAN
100.
99.
L

L
GRATING (8mm THICK)
93(

00(

2
LPP)

HPP)

(TYP.)

C
M

M
AS-BUILT
N

N
B
100.00(HPP)
3 03.01.15 AS-BUILT
7800 2 20.05.13 REVISED AS PER PIPING COMMENTS & ISSUED FOR CONST.MANOJ

1 25.03.13 REVISED AS MARKED & ISSUED FOR CONSTRUCTION SONIA GV/GS VG


3000

0 08.03.13 ISSUED FOR CONSTRUCTION SONIA GV/GS VG

REV. DATE REVISIONS BY CHKD APPD PEM/PC


2000

99.93(LPP)
O

O
A (A Govt. of India Undertaking)

2500 2000 2000 2000 2000


N 134000 NUMALIGARH REFINERY LIMITED
1 2 3 4 5 6 7 8 9 uqekyhxM+ fjQkbZujh fyfeVsM

UNIT DRAIN cSDl gkbMks&fQfuf'kax WAX HYDRO FINISHING

bdkbZ UNIT
WITH GRATING
vkj-Lkh-Lkh-isoesaV dk LAYOUT OF RCC
P

P
vfHkfoU;kLk PAVEMENT
SCALE JOB NO. UNIT DIVN. DEPT. DWG. NO. REV.

1:125 A 1 5 1 0 1 9 1 6 4 7 0 2 0 2 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

3-1641-0500 REV.2 A0-1189 x 841

You might also like