PAI-CAT Proposal

Well ABHD_105_3

Prepared by Hussein Al-Shabebi


Reviewed by Husain Al Meghdad
Date 22 Sep 2023

Company Saudi Aramco

Copyright 2019 Baker Hughes Company LLC. All rights


ABHD_105_3

Table of Contents

1. LOGGING OBJECTIVE.........................................................................................................................................3
2. WELL COMPLETION SCHEMATIC...................................................................................................................3
3. TOOL STRING DIAGRAM....................................................................................................................................4
4. WELL TRAJECTORY............................................................................................................................................5
5. WELL HISTORY.....................................................................................................................................................6
6. PVT DATA...............................................................................................................................................................6
7. CONVEYANCE.......................................................................................................................................................6
8. LOGGING PROCEDURE......................................................................................................................................6

Copyright 2019 Baker Hughes Company LLC. All rights reserved


ABHD_105_3

1. Logging Objective

PAI-CAT to be run to identify multi-phase downhole flow profile across the horizontal openhole section.

2. Well Completion Schematic

Copyright 2019 Baker Hughes Company LLC. All rights reserved


ABHD_105_3

Figure 1: Well Completion Schematic

Copyright 2019 Baker Hughes Company LLC. All rights reserved


ABHD_105_3

3. Tool String Diagram

GR

CCL

Pressure

Temperature

XY-caliper

PIA

PAI (SAT-RAT) – Tool opening unrestricted

CAT – Tool opening 7” and higher

Figure 2: Tool string Diagram

Copyright 2019 Baker Hughes Company LLC. All rights reserved


ABHD_105_3

4. Well Trajectory

Copyright 2019 Baker Hughes Company LLC. All rights reserved


ABHD_105_3

Figure 3: Well Trajectory

Copyright 2019 Baker Hughes Company LLC. All rights reserved


ABHD_105_3

5. Well History
ABHD-105 an active ARBB horizontal single lateral oil producer producing at a gross rate of 4.5 MBD at 73%
WC.

6. PVT Data

 BO : N/A
 GOR : N/A
 API : N/A
 Pb : N/A
 Tb : N/A
 Oil density : N/A
 Water salinity : N/A

7. Conveyance

Conveying with a CT 2”

8. Logging Procedure

 RIH with Dummy tool string to 14760’.


 POOH Dummy tool string to surface
 RIH with PAI-CAT tool string to 7400 ft while recording under shut-in
 Start record stabilization for 15 min then open the well to the target rate

Flowing:
 Continue record stabilization (As per Aramco Requirements ∆P < 5 psi/hr)
 Perform vertical spinners calibration passes from 7400 ft to 7500 ft at 30, 50 and 70 ft/min
 Record while RIH 7400 – 12350 ft
 Record main down pass at 30 ft/min from 12350 ft to 14760 ft.
 Record up main pass at 30 ft/min from 14760 ft to 12350 ft with stations at 14760ft (deepest
depth), 14500ft, 14200ft, 13900ft, 13600ft, 13300ft, 13000ft, 12700ft and 12350ft. This to be done
in time mode without overlap (RTS will confirm these stations after LQCing the main down pass).
 Perform horizontal spinners calibration passes from 12600 ft to 12700 ft at 30, 50 and 70 ft/min
(This can be changed based on the main passes).
 Stop at 12350’ and record for 15 minutes then shut-in the well.

Shut-in:

 Continue record stabilization (As per Aramco Requirements ∆P < 5 psi/hr)


 Perform horizontal spinners calibration passes from 12600 ft to 12700 ft at 30, 50 and 70 ft/min
(This can be changed based on the main passes).
 Record main down pass at 30 ft/min from 12350 ft to 14760 ft.

Copyright 2019 Baker Hughes Company LLC. All rights reserved


ABHD_105_3

 Record up main pass at 30 ft/min from 14760 ft to 12350 ft with stations at 14760ft (deepest
depth), 14500ft, 13900ft, 13300ft, 12700ft and 12350ft. This to be done in time mode without
overlap (RTS will confirm these stations after LQCing the main down pass).
 POOH while recording 12350 – 7400 ft
 Perform vertical spinners calibration passes from 7400 ft to 7500 ft at 30, 50 and 70 ft/min
 POOH to surface while recording.

Note: Stationary measurement depths should be considered with respect to PAI-SAT and additional offset
should be added as per tool string.
Reduce speeds at restrictions

Copyright 2019 Baker Hughes Company LLC. All rights reserved