Professional Documents
Culture Documents
Wall To Wall Inventory of Kolkata FC
Wall To Wall Inventory of Kolkata FC
Critical timing
1- All Invoice should get generated before 5.00 AM.
2- RG Inventory report download time – 6.00 AM
3- Physical audit – 6.00 AM to 10-00AM – Fast moving
4- Physical audit - 10.00 AM to 2.00 PM – Slow / Non Moving