BACK UP DATA

PEKERJAAN : MALIARO - JAN

ITEM
: PENYIAPAN BADAN JALAN
PEKERJAAN

LEBAR VOLUME
LEBAR
PANJANG
NO. STA RATA-RATA
(M) PANJANG X LEBAR X TEBAL
(M)
(M)

SEGMEN 1
1 0 + 000 5.50
25.00 4.67 25 M1 X 4.67 M1 = 116.63 M2
2 0 + 25 3.83
25.00 3.69 25 M1 X 3.69 M1 = 92.25
3 0 + 50 3.55
25.00 3.55 25 M1 X 3.55 M1 = 88.75 M2
4 0 + 75 3.55
25.00 3.45 25 M1 X 3.45 M1 = 86.25
5 0 + 100 3.35
23.00 3.58 23 M1 X 3.58 M1 = 82.23
6 0 + 123 3.80
6.00 3.83 6 M1 X 3.83 M1 = 22.95
7 0 + 129 3.85
7.80 3.75 8 M1 X 3.75 M1 = 29.25
8 0 + 136.8 3.65
SEGMEN 2
1 0 + 000 4.65

2 0 + 9.7 3.65
VOLUME 372.43 M3
BACK UP DATA

PEKERJAAN : MALIARO - JAN

ITEM
: LAPIS PONDASI BAWAH DENGAN TELFORD
PEKERJAAN
LEBAR
LEBAR VOLUME
PANJANG RATA-RATA
NO. STA
(M) PANJANG X LEBAR
(M)
(M)
SEGMEN 1
1 0 + 000 5.00
25.00 4.29 25 M1 X 4.29 M1 = 107.25 M2
2 0 + 25 3.58
25.00 3.44 25 M1 X 3.44 M1 = 86.00 M2
3 0 + 50 3.30
25.00 3.30 25 M1 X 3.30 M1 = 82.50 M2
4 0 + 75 3.30
25.00 3.40 25 M1 X 3.40 M1 = 85.00 M2
5 0 + 100 3.50
23.00 3.53 23 M1 X 3.53 M1 = 81.08 M2
6 0 + 123 3.55
6.00 3.58 6 M1 X 3.58 M1 = 21.45 M2
7 0 + 129 3.60
7.80 3.50 8 M1 X 3.50 M1 = 27.30 M2
8 0 + 136.8 3.40
SEGMEN 2
1 0 + 000 4.40
9.70 3.85 10 M1 X 3.85 M1 = 37.35 M2
2 0 + 9.7 3.30

0 + 150 3.50

VOLUME = 527.92 M2
BACK UP DATA

PEKERJAAN : MALIARO - JAN


ITEM PEKERJAAN : LAPIS PEREKAT - ASPAL CAIR / EMULSI
LEBAR
LEBAR VOLUME
TAKAR
PANJANG RATA-RATA
NO. STA (M)
(Liter/m3) PANJANG X LEBAR X TAKARAN
(M)
(M)
SEGMEN 1
1 0 + 000 5.00
25.00 4.29 0.80 25.00 M' X 4.29 M' X 0.80 Liter/M2 = 85.80 Liter
2 0 + 25 3.58
25.00 3.44 0.80 25.00 M' X 3.44 M' X 0.80 Liter/M2 = 68.80 Liter
3 0 + 50 3.30
25.00 3.30 0.80 25.00 M' X 3.30 M' X 0.80 Liter/M2 = 66.00 Liter
4 0 + 75 3.30
25.00 3.40 0.80 25.00 M' X 3.40 M' X 0.80 Liter/M2 = 68.00 Liter
5 0 + 100 3.50
23.00 3.53 0.80 23.00 M' X 3.53 M' X 0.80 Liter/M2 = 64.86 Liter
6 0 + 123 3.55
6.00 3.58 0.80 6.00 M' X 3.58 M' X 0.80 Liter/M2 = 17.16 Liter
7 0 + 129 3.60
7.80 3.50 0.80 7.80 M' X 3.50 M' X 0.80 Liter/M2 = 21.84 Liter
8 0 + 136.8 3.40
SEGMEN 2
1 0 + 000 4.40
9.70 3.85 0.80 9.70 M' X 3.85 M' X 0.80 Liter/M2 = 29.88 Liter
2 0 + 9.7 3.30

VOLUME : 422.34 Liter


BACK UP DATA

PEKERJAAN : MALIARO - JAN

ITEM
PEKERJAAN : LAPIS PENETRASI MACADAM

LEBAR
VOLUME
LEBAR TEBAL
PANJANG
NO. STA RATA-RATA
(M) PANJANG X LEBAR X TEBAL
(M) (M)
(M)
SEGMEN 1
1 0 + 000 4.80
25.00 4.10 0.05 102 M2 X 0.05 M1 = 5.13 M3
2 0 + 25 3.40
25.00 3.25 0.05 81 M2 X 0.05 M1 = 4.06 M3
3 0 + 50 3.10
25.00 3.10 0.05 78 M2 X 0.05 M1 = 3.88 M3
4 0 + 75 3.10
25.00 3.23 0.05 81 M2 X 0.05 M1 = 4.03 M3
5 0 + 100 3.35
23.00 3.38 0.05 78 M2 X 0.05 M1 = 3.88 M3
6 0 + 123 3.40
6.00 3.40 0.05 20 M2 X 0.05 M1 = 1.02 M3
7 0 + 129 3.40
7.80 3.35 0.05 26 M2 X 0.05 M1 = 1.31 M3
8 0 + 136.8 3.30
SEGMEN 2
1 0 + 000 4.40
9.70 3.85 0.05 37 M2 X 0.05 M1 = 1.87 M3
2 0 + 9.7 3.30

VOLUME : 25.17 M3
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE
TAHUN ANGGARAN 2022
Laporan Kemajuan Pekerjaan

PEKERJAAN : #REF!

LOKASI : KOTA TERNATE

NO & TGL. KONTRAK : 600/1938/DPUPR/KT/2022 & 6 JULI 2022 TANGGAL : 16 AGUSTUS 2022
TAHUN ANGGARAN : 2022 PROGGRES PEKERJAAN : #REF! %

NILAI KONTRAK : #REF!

Progres Fisik Lapangan


No. Uraian Pekerjaan Volume Satuan Harga Satuan (Rp.) Jumlah Harga Pajak (11%) Total Setelah Pajak Bobot
(Rp.) (%) Volume Jumlah Harga Pajak (11%) Total Setelah Pajak Bobot
(Rp.) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

#REF!
1 #REF! 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!
4 #REF! 168.35 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! 88.80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!
6 #REF! 18.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 Penyiapan Badan Jalan 1000 M2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!
8 #REF! 220.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!
9 #REF! 718.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10 #REF! 3,708.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
11 #REF! 661.50 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!
12 #REF! 3.10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 #REF! 190.14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
14 #REF! 10.07 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

JUMLAH FISIK #REF! #REF! #REF! #REF! #REF!

JUMLAH TOTAL #REF! #REF!


Rp 1,911,249,847.83
Diperiksa Oleh : Dibuat Oleh :
Mengetahui : Oleh :
Disetujui Diperiksa Oleh : DIREKSI TEKNIS KONTRAKTOR PELAKSANA
PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN CV. BINTANG PRATAMA
(PPTK)

RUSMANSYAH, ST.,MT ARYANI JATININGSIH, ST YUNI KARTIKA, SS FACHRUDDIN THAIB


NIP. 19720908 200112 1 003 NIP. 19960124 201902 2 003 NPTT : 2020646 Direktur
MONTLY REPORT
(Laporan Bulanan)

PEKERJAAN : #REF! No. Laporan -- 01 --


LOKASI : #REF! Mulai-Sampai tgl 25 Mei 2022
NO & TANGGAL KONTRAK : #REF! Tanggal 23 Juni 2022
NILAI KONTRAK : #REF!
PERUSAHAAN : #REF!

URAIAN KONTRAK URAIAN VOLUME REALISASI


HARGA SATUAN JUMLAH HARGA BOBOT HARGA SATUAN JUMLAH HARGA BOBOT
NO. URAIAN PEKERJAAN SATUAN VOLUME (Rp.) (Rp.) % VOLUME (Rp.) (Rp.) %

1 2 3 4 5 6 7 12 13 14 15

###
1 #REF! Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### m2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### m2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### - #REF!
### - #REF!
1 ### Liter #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! m3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### - #REF!
### - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! - #REF!

- #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
- #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!

Jumlah Fisik #REF! #REF! #REF! #REF!


PPN 10% #REF! #REF!
Jumlah Total #REF! #REF!
Pembulatan #REF! #REF!

Kemajuan Pekerjaan Bulan ini #REF! Mulai Tanggal 18 FEBRUARI 2021


Kemajuan Pekerjaan s/d Bulan Lalu #REF! Sampai Tanggal 17 MARET 2021
Kemajuan Pekerjaan s/d Bulan ini #REF! Bulan 1
JADWAL PELAKSANAAN PEKERJAAN

KEGIATAN : PEMBANGUNAN JEMBATAN RT.08 KEL. NGADE


LOKASI : KOTA TERNATE
NO. & TGL KONTRAK : 600/1381/DPUPR/KT/2022 & TANGGAL 25 MEI 2022
NILAI KONTRAK : Rp. 198.631.000,00
PELAKSANA : CV. BINAR CORPORRATION TEKNIK

WAKTU PELAKSANAAN
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT KET.
(Rp) (%) MEI-JUNI 22 JUNI-JULI 22 JULI-AGUSTUS 22 AGUSTUS-SEPTEMBER 22
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 HR

DIVISI 1. UMUM 100

1.2 Mobilisasi #REF! #REF! 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
Manajemen dan Keselamatan Lalu Lintas #REF! #REF! 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Keselamatan dan Kesehatan Kerja #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

DIVISI 3. PEKERJAAN TANAH


3.1.(1a) Galian Biasa #REF! #REF! #REF!

DIVISI 7. STRUKTUR
7.1. (7) a Beton Struktur, fc' 20 Mpa #REF! #REF! #REF! #REF! #REF! #REF!
7.3. (1) Baja Tulangan Polos-BjTP 280 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Baja Tulangan Sirip-BjTS 420A #REF! #REF! 1.54 1.54 1.54 1.54
7.9. (1) Pasangan Batu #REF! #REF! 5.00 17.20 #REF!
Sambungan Siar Muai Tipe Modular (Baja Siku) Lebar 70.70.7 #REF! #REF! #REF!

Landasan Elastomerik Karet Alam Berlapis Baja Ukuran 200 mm X 200 mm X 20 mm #REF! #REF! #REF!

Sandaran (Railing) #REF! #REF! 1.52


Papan Nama Jembatan #REF! #REF! #REF!
Pipa Penyalur PVC #REF! #REF! #REF!

Pengecatan pada Elemen Sandaran dan/atau Pagar Pengaman (Gruard Rail) 80 #REF! #REF! #REF!
Mikron

JUMLAH #REF! #REF!

A. RENCANA KEMAJUAN PEKERJAAN 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1.00 0.00 0.00

B. RENCANA KUMULATIF PEKERJAAN 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

C. REALISASI KEMAJUAN PEKERJAAN #REF! #REF! #REF! #REF! 0 0

D. REALISASI KUMULATIF PEKERJAAN #REF! #REF! #REF! #REF! #REF!

Mengetahui :
Mengetahui : Disetujui :
PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN DIREKSI LAPANGAN
(PPTK)

RUSMANSYAH, ST. MT. ARYANI JATININGSIH, ST YUNI KARTIKA ANWAR, SS


NIP. 19780807 200501 1 012 NIP. 19960124 201902 2 003 NPTT. 2020
PROGRAM PEMELIHARAAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM KOTA TERNATE TAHUN ANGGARAN 2021
CONTRACT CHANGE ORDER (CCO)
KEGIATAN : Pemeliharaan Berkala/Rehabilitasi Jalan (Khusus Kota) JL. MOYA-BUKUBANDERA
LOKASI : KOTA TERNATE
NO & TGL KNTRK : 600/446/DPUPR/KT/2021
PELAKSANA : PT. ADDIS PRATAMA PERSADA

URAIAN KONTRAK PEKERJAAN TAMBAH KURANG URAIAN ADDENDUM KONTRAK


NO. URAIAN
Pekerjaan Tambah Pekerjaan Kurang
Bobot
DIV. PEKERJAAN Satuan Volume Harga Satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Jumlah Harga (Rp.)
Volume Volume (%)
Jumlah Harga (Rp.) Jumlah Harga (Rp.)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 60,000,000.00 60,000,000.00 2.22 1.00 60,000,000.00 2.22
Manajemen dan Keselamatan Lalu Lintas LS 1.00 14,823,225.00 14,823,225.00 0.55 1.00 14,823,225.00 0.55
Keselamatan dan Kesehatan Kerja LS 1.00 12,340,000.00 12,340,000.00 0.46 1.00 12,340,000.00 0.46

DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air M3 194.25 52,523.95 10,202,777.29 0.38 60.66 3,186,102.8 133.59 7,016,674.48 0.26
Pasangan Batu dengan Mortar M3 117.00 1,598,834.65 187,063,654.05 6.91 69.45 111,039,066.4 47.55 76,024,587.61 2.81

DIVISI 3. PEKERJAAN TANAH


Galian Biasa M3 450.00 57,951.87 26,078,341.50 0.96 281.73 16,326,838.3 168.27 9,751,503.21 0.36
Penyiapan Badan Jalan M2 900.00 13,981.02 12,582,918.00 0.46 1,491.80 20,856,885.64 2,391.80 33,439,803.64 1.23

DIVISI 5. PERKERASAN BERBUTIR


Lapis Pondasi Agregat Kelas A M3 280.00 701,008.11 196,282,270.80 7.25 89.46 62,712,185.5 190.54 133,570,085.28 4.93
Lapis Pondasi Agregat Kelas B M3 420.00 442,502.80 185,851,176.00 6.86 278.30 123,150,465.2 141.70 62,700,710.81 2.32
Lapis Pondasi Bawah (LPB) Telford M2 - 109,468.01 878.10 96,123,860.28 878.10 96,123,860.28 3.55

DIVISI 6. PERKERASAN ASPAL


Lapis Resap Pengikat - Aspal Cair/EmulsI Liter 2,240.00 18,272.90 40,931,296.00 1.51 715.68 13,077,549.1 1,524.32 27,853,746.93 1.03
Lapis Perekat - Aspal Cair/Emulsi Liter 2,641.63 20,237.38 53,459,670.13 1.97 950.51 19,235,831.24 3,592.14 72,695,501.37 2.68
Lataston Lapis Fondasi (HRS - Base) Ton 923.00 1,869,927.47 1,725,943,054.81 63.73 7.52 14,057,129.7 915.48 1,711,885,925.15 63.21
Lapis Penetrasi Macadam M3 - 2,236,069.40 43.91 98,185,807.30 43.91 98,185,807.30 3.63

DIVISI 7. STRUKTUR
Beton strukur, fc’20 MPa M3 - 1,958,200.00 - - 0.87 1,711,466.80 0.874 1,711,466.80 0.06
Baja Tulangan Polos-BjTP 280 Kg - 17,300.00 - - 83.88 1,451,089.40 83.88 1,451,089.40 0.05
Pasangan Batu M3 117.50 1,233,087.55 144,887,787.13 5.35 116.50 143,654,699.58 234.00 288,542,486.70 10.65

3.3 DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


Marja Jalan Termoplastik M 112.50 334,847.14 37,670,303.25 1.39 112.50 37,670,303.3 - - -

JUMLAH HARGA FISIK 2,708,116,473.95 100 381,219,640.23 381,219,640.23 2,708,116,473.95 100.00


Ppn 10 % 270,811,647.40 270,811,647.40
JUMLAH TOTAL 2,978,928,121.35 2,978,928,121.35
Pembulatan 2,978,928,000.00 2,978,928,000.00

Mengetahui : Mengetahui : Disetujui Oleh :


Mengetahui : Dibuat Oleh :
SELISIH Rp 0.00 Diperiksa : KONTRAKTOR PELAKSANA Disetujui,
Disetujui : Diperiksa : Diperiksa :
PENGGUNA JASA Panitia Peneliti Kontrak
PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN DIREKSI TEKNIS DIREKSI TEKNIS PT. ADDIS PRATAMA
(PPK) (PPTK) PERSADA 1. Bambang Ohoimas,ST ……………….
(Ketua)
2. Mardianti,ST, ………………
(sekertaris)
3. Sura Manambung ……………….
(anggota)
4. Aryani Jatiningsih,ST ………………
Ir. ISNAINY P. SIRADJU, M,Sc RIO PICAL SUBUH, ST FIKOH ALBUGIS, ST ARYANI JATININGSIH, ST YUNI KARTIKA, SS ADAM MARSAOLY (anggota)
NIP. 19620512 199303 1 007 NIP. 19860705 200903 1 002 NIP. 19800119 201001 1 007 NIP. 19960124 201902 2 003 NPTT : 2020 646 Direktur 5. Ade Muhammad ………………
(anggota)
NIP. 19860705 200903 1 002 NIP. 19800119 201001 1 007 NIP. 19960124 201902 2 003 NPTT : 2020 646 Direktur
BETON PLAT

TUBO P 7
L 1.3
Te 0.2
BESI 150 PER M3
VOL
BETON 1.82 M3
SEKOT BESI 273 KG

PAS.BATU P 50
Ti 0.8
L 0,20+0,40/2 0.3
VOL
PAS.BT 12.00 M3
BUKU HARIAN STANDAR

PROGRAM : PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN CATATAN HARIAN


PEKERJAAN : PENINGKATAN JALAN KELILING PULAU MOTI
PELAKSANA : CV. TUANANE JAYA Hari / Tanggal :
KONSULTAN : CV. SYAFFAH ENGINEERING KONSULTAN

A. PEKERJAAN B. TIBA MUTASI PERALATAN DAN BAHAN KONSTRUKSI POKOK

VOLUME VOLUME CACAH LOKASI LOKASI


NO. JENIS PEKERJAAN SAT. KONTRAK REALISASI KET. NO. JENIS VOLUME ASAL TUJUAN

DIVISI 1. UMUM 1 SEMEN


1.2 Mobilisasi LS 1.00 2 PASIR BETON
3 AGREGAT KASAR
DIVISI 2. DRAINASE 4 PAKU
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 #REF! 5 BESI
#REF! #REF! #REF! #REF! 6 KAWAT BETON
7 AGREGAT KLAS A
DIVISI 3. PEKERJAAN TANAH 8 ASPAL
3.3.(1) Penyiapan Badan Jalan M2 #REF! 9 KEROSEN
10 AGREGAT 5/10 & 10/15
DIVISI 5. PERKERASAN BERBUTIR 11 SCREEN
5.1. (1) Lapis Pondasi Agregat Kelas A M3 #REF! 12 PASIR HALUS
13 BATU KALI
DIVISI 6. PERKERASAN ASPAL
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter #REF! C. PEMAKAIAN PERALATAN
6.1.(2)(a) Lapis Perekat - Aspal Cair Liter #REF! CACAH LOKASI
NO. JENIS LOKASI ASAL
VOLUME TUJUAN
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton #REF!
1 ASPHALT FINISHER
2 ASPHALT SPRAYER
3 COMPRESSOR
4 DUMP TRUCK
5 TANDEM ROLLER
6 P. TYRE ROLLER
7 VIBRATOR ROLLER
8 TRONTON
9 WATER TANKER
10 ALAT BANTU
11 WHEEL LOADER
12 GRADER
13 AMP
14 BULLDOZER

D. PERSONIL KEGIATAN, KONTRAKTOR & KONSULTAN E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJAAN

NO. TUGAS / JABATAN CACAH (Org) LOKASI NO. JENIS JAM LOKASI KODE KET.

1. DIREKSI PROYEK 1 Cerah


2. INSPECTOR 2 Berawan
3. PENGAWAS LAPANGAN 3 Gerimis
4. MANDOR 4 Hujan Lebat
5. KEPALA TUKANG 5 Banjir
6. PEKERJA 6 Longsor
7. SOPIR / OPERATOR

F. USUL / PENGAJUAN / SARAN / INSTRUKSI / KESEPAKATAN / LAPORAN

PIHAK URAIAN TANDA TANGAN

KONTRAKTOR
KONSULTAN SUPERVISI
PEMIMPIN PROGRAM
ATASAN LANGSUNG
ATASAN ……………………………
………………………… TAMU
KET.

KET.

UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
SET
UNIT
UNIT
UNIT
UNIT
BUKU HARIAN STANDAR

PROGRAM : PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN CATATAN HARIAN


PEKERJAAN : PENINGKATAN JALAN KELILING PULAU MOTI
PELAKSANA : CV. TUANANE JAYA Hari / Tanggal :
KONSULTAN : CV. SYAFFAH ENGINEERING KONSULTAN

A. PEKERJAAN B. TIBA MUTASI PERALATAN DAN BAHAN KONSTRUKSI POKOK

VOLUME VOLUME CACAH LOKASI LOKASI


NO. JENIS PEKERJAAN SAT. KONTRAK REALISASI KET. NO. JENIS VOLUME ASAL TUJUAN

DIVISI 1. UMUM 1 SEMEN


1.2 Mobilisasi LS 1.00 2 PASIR BETON
3 AGREGAT KASAR
DIVISI 2. DRAINASE 4 PAKU
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 50.00 5 BESI
2.2.(1) Pasangan Batu dengan Mortar M3 0.00 6 KAWAT BETON
7 AGREGAT KLAS A
DIVISI 3. PEKERJAAN TANAH 8 ASPAL
3.3.(1) Penyiapan Badan Jalan M2 741.79 9 KEROSEN
3.3.(1) Penyiapan Badan Jalan M 3
7,742.50 10 AGREGAT 5/10 & 10/15
11 SCREEN
DIVISI 5. PERKERASAN BERBUTIR 12 PASIR HALUS
5.1. (1) Lapis Pondasi Agregat Kelas A M3 6,356.25 13 BATU KALI
0 0 M3 0.00
C. PEMAKAIAN PERALATAN
DIVISI 6. PERKERASAN ASPAL CACAH LOKASI
NO. JENIS LOKASI ASAL
VOLUME TUJUAN
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 693.64
6.1.(2)(a) Lapis Perekat - Aspal Cair Liter - 1 ASPHALT FINISHER
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton - 2 ASPHALT SPRAYER
3 COMPRESSOR
DIVISI 7. STRUKTUR 4 DUMP TRUCK
7.9.(1) Err:509 M3 345.80 5 TANDEM ROLLER
7.10.(2) Err:509 M3 486.00 6 P. TYRE ROLLER
0 0 M3 - 7 VIBRATOR ROLLER
8 TRONTON
9 WATER TANKER
10 ALAT BANTU
11 WHEEL LOADER
12 GRADER
13 AMP
14 BULLDOZER

D. PERSONIL KEGIATAN, KONTRAKTOR & KONSULTAN E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJAAN

NO. TUGAS / JABATAN CACAH (Org) LOKASI NO. JENIS JAM LOKASI KODE KET.

1. DIREKSI PROYEK 1 Cerah


2. INSPECTOR 2 Berawan
3. PENGAWAS LAPANGAN 3 Gerimis
4. MANDOR 4 Hujan Lebat
5. KEPALA TUKANG 5 Banjir
6. PEKERJA 6 Longsor
7. SOPIR / OPERATOR

F. USUL / PENGAJUAN / SARAN / INSTRUKSI / KESEPAKATAN / LAPORAN

PIHAK URAIAN TANDA TANGAN

KONTRAKTOR
KONSULTAN SUPERVISI
PEMIMPIN PROGRAM
ATASAN LANGSUNG
ATASAN ……………………………
………………………… TAMU
KET.

KET.

UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
SET
UNIT
UNIT
UNIT
UNIT
MONTLY REPORT
(Laporan Bulanan)

PEKERJAAN : #REF! No. Laporan -- 01 --


LOKASI : KOTA TERNATE Mulai-Sampai tgl
NO & TANGGAL KONTRAK : 600/446/DPUPR/KT/2021 Tanggal
NILAI KONTRAK : #REF!
PERUSAHAAN : 2021

URAIAN KONTRAK URAIAN VOLUME REALISASI


HARGA SATUAN JUMLAH HARGA BOBOT HARGA SATUAN JUMLAH HARGA BOBOT
NO. URAIAN PEKERJAAN SATUAN VOLUME (Rp.) (Rp.) % VOLUME (Rp.) (Rp.) %

1 2 3 4 5 6 7 12 13 14 15

DIVISI 1. UMUM
1 #REF! Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 ### Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 ### Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### m2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### m2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### Liter #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 ### m3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Jumlah Fisik #REF! #REF! #REF! #REF!


PPN 10% #REF! #REF!
Jumlah Total #REF! #REF!
Pembulatan #REF! #REF!

Kemajuan Pekerjaan Bulan ini #REF! Mulai Tanggal 05 AGUSTUS 2021


Kemajuan Pekerjaan s/d Bulan Lalu #REF! Sampai Tanggal 01 SEPTEMBER 2021
Kemajuan Pekerjaan s/d Bulan ini #REF! Bulan 7
Laporan Kemajuan Pekerjaan

PROGRAM : PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN

PEKERJAAN : Pemeliharaan Berkala/Rehabilitasi Jalan (Khusus Kota) JL. MOYA-BUKUBANDERA

LOKASI : KOTA TERNATE

TAHUN ANGGARAN : 2021

NILAI KONTRAK : Rp 3,020,365,000.00

Progres Fisik Lapangan

No. Uraian Pekerjaan Volume Satuan (Rp.) Harga Satuan (Rp.) Jumlah Harga Bobot ( % )
Jumlah Harga Bobot
Volume (Rp.) (%)

1 2 3 4 5 6 7 8 9 10

DIVISI 1. UMUM

1.2 Mobilisasi 1.00 LS Rp 60,000,000.00 Rp 60,000,000.00 2.22 0.65 Rp 39,000,000 1.42

Manajemen dan Keselamatan Lalu Lintas 1.00 LS Rp 14,823,225.00 Rp 14,823,225.00 0.55 0.65 Rp 9,635,096 0.35

Keselamatan dan Kesehatan Kerja 1.00 LS Rp 12,340,000.00 Rp 12,340,000.00 0.46 0.65 Rp 8,021,000 0.29

DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 37.90 M3 Rp 52,523.95 Rp 1,990,657.70 0.07 133.590 Rp 7,016,674 0.26

2.2.(1) Pasangan Batu dengan Mortar 35.50 M3 Rp 1,598,834.65 Rp 56,758,630.07 2.10 35.500 Rp 56,758,630 2.07

DIVISI 3. PEKERJAAN TANAH

3.3.(1) Galian Biasa 179.70 M3 Rp 57,951.87 Rp 10,413,951.04 0.38 179.70 Rp 10,413,951 0.38

Penyiapan Badan Jalan 2,275.00 M2 Rp 13,981.02 Rp 31,806,820.50 1.17 2166.80 Rp 30,294,074 1.10

DIVISI 5. PERKERASAN BERBUTIR

5.1. (1) Lapis Pondasi Agregat Kelas A 216.00 M2 Rp 701,008.11 Rp 151,417,751.76 5.59 152.48 Rp 106,889,717 3.89

Lapis Pondasi Agregat Kelas B 261.00 M2 Rp 442,502.80 Rp 115,493,230.80 4.26 141.70 Rp 62,700,711 2.28

DIVISI 6. PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair/Emuls 1,728.00 Liter Rp 18,272.90 Rp 31,575,571.20 1.17 928.64 Rp 16,968,873 0.62

6.1.(2)(a) Lapis Perekat - Aspal Cair/Emulsi 3,884.29 Liter Rp 20,237.38 Rp 78,607,839.66 2.90 1199.68 Rp 24,278,304 0.88

6.3.(4a) Lataston Lapis Fondasi (HRS - Base) 989.94 Ton Rp 1,869,927.47 Rp 1,851,113,917.51 68.35 343.35 Rp 642,032,467 23.38

DIVISI 7. STRUKTUR

Beton Siklop, fc’15 Mpa 0.874 M3 Rp 1,404,700.00 Rp 1,227,707.80 0.05 0.874 Rp 1,227,708 0.04

Baja Tulangan Polos-BjTP 280 83.878 Kg Rp 23,900.00 Rp 2,004,684.20 0.07 83.878 Rp 2,004,684 0.07

Pasangan Batu 234.00 M3 Rp 1,233,087.55 Rp 288,542,486.70 10.65 234 Rp 288,542,487 10.51

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN

Marja Jalan Termoplastik 112.50 M2 Rp 334,847.14 Rp 37,670,303.25

JUMLAH FISIK 10,041.58 Rp 2,745,786,777.19 100.00 5,602.13 47.56

PPN 10 % Rp 274,578,677.72

JUMLAH TOTAL Rp 3,020,365,454.91

DIBULATKAN Rp 3,020,365,000.00

Kemajuan Pekerjaan Minggu ini 47.56 Mulai Tanggal

Kemajuan Pekerjaan s/d Minggu Lalu Sampai Tanggal

Kemajuan Pekerjaan s/d Minggu ini 47.56 Minggu

Bulan

Mengetahui : Disetujui :

Mengetahui : Dibuat Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN DIREKSI TEKNIS DIREKSI TEKNIS KONTRAKTOR PELAKSANA
(PPTK) PT. ADDIS PRATAMA PERSADA

RIO PICAL SUBUH, ST FIKOH ALBUGIS, ST ARYANI JATININGSIH, ST YUNI KARTIKA, SS ADAM MARSAOLY
NIP. NIP. NIP. 19960124 201902 2 003 NPTT : Direktur
Laporan Kemajuan Pekerjaan

PROGRAM : PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN


PEKERJAAN : Pemeliharaan Berkala/Rehabilitasi Jalan (Khusus Kota) JL. MOYA-BUKUBANDERA
LOKASI : KOTA TERNATE
TAHUN ANGGARAN : 2021
NOMOR KONTRAK : 600/446/DPUPR/KT/2021, Tanggal 18 Februari 2021
NOMOR ADDENDUM KONTRA: 600/2475/DPUPR/KT/2021, Tanggal 10 September 2021
NILAI KONTRAK : Rp 2,978,928,000.00 Sampai dengan Tanggal : 26 Oktober 2021

Progres Fisik Lapangan


Satuan
No. Uraian Pekerjaan Volume Harga Satuan (Rp.) Jumlah Harga Bobot ( % ) Jumlah Harga Bobot
(Rp.) Volume
(Rp.) (%)

1 2 3 4 5 6 7 8 9 10

DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS Rp 60,000,000.00 Rp 60,000,000.00 2.22 0.65 Rp 39,000,000 1.44
1.8 Manajemen dan Keselamatan Lalu Lintas 1.00 LS Rp 14,823,225.00 Rp 14,823,225.00 0.55 0.65 Rp 9,635,096 0.36
1.19 Keselamatan dan Kesehatan Kerja 1.00 LS Rp 12,340,000.00 Rp 12,340,000.00 0.46 0.65 Rp 8,021,000 0.30

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 133.59 M3 Rp 52,523.95 Rp 7,016,674.48 0.26 108.790 Rp 5,714,081 0.21
2.2.(1) Pasangan Batu dengan Mortar 47.55 M3 Rp 1,598,834.65 Rp 76,024,587.61 2.81 39.286 Rp 62,811,898 2.32

DIVISI 3. PEKERJAAN TANAH


3.3.(1) Galian Biasa 168.27 M3 Rp 57,951.87 Rp 9,751,503.21 0.36 168.27 Rp 9,751,503 0.36
Penyiapan Badan Jalan 2,391.80 M2 Rp 13,981.02 Rp 33,439,803.64 1.23 2,391.80 Rp 33,439,804 1.23

DIVISI 5. PERKERASAN BERBUTIR


5.1. (1) Lapis Pondasi Agregat Kelas A 190.54 M2 Rp 701,008.11 Rp 133,570,085.28 4.93 190.54 Rp 133,570,085 4.93
Lapis Pondasi Agregat Kelas B 141.70 M2 Rp 442,502.80 Rp 62,700,710.81 2.32 141.70 Rp 62,700,711 2.32
Lapis Pondasi Bawah (LPB) Telford 878.10 M2 Rp 109,468.01 Rp 96,123,860.28 3.55 0.00 Rp - 0.00

DIVISI 6. PERKERASAN ASPAL


6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair/Emuls 1,524.32 Liter Rp 18,272.90 Rp 27,853,746.93 1.03 1524.32 Rp 27,853,747 1.03
6.3.(4a) Lapis Perekat - Aspal Cair/Emulsi 3,592.14 Liter Rp 20,237.38 Rp 72,695,501.37 2.68 1915.81 Rp 38,770,950 1.43
6.3.(4a) Lataston Lapis Fondasi (HRS - Base) 915.48 Ton Rp 1,869,927.47 Rp 1,711,885,925.15 63.21 562.89 Rp 1,052,568,075 38.87
Lapis Penetrasi Macadam 43.91 M3 Rp 2,236,069.40 Rp 98,185,807.30 3.63 0.00 Rp - 0.00

DIVISI 7. STRUKTUR
Beton strukur, fc’20 Mpa 0.874 M3 Rp 1,958,200.00 Rp 1,711,466.80 0.06 0.874 Rp 1,711,467 0.06
Baja Tulangan Polos-BjTP 280 83.878 Kg Rp 17,300.00 Rp 1,451,089.40 0.05 83.878 Rp 1,451,089 0.05
Pasangan Batu 234.00 M3 Rp 1,233,087.55 Rp 288,542,486.70 10.65 112.18 Rp 138,333,002 5.11

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


Marja Jalan Termoplastik - - - - 0.00

JUMLAH FISIK Rp 2,708,116,473.95 100.00 Rp 1,625,332,507.97 60.02


PPN 10 % Rp 270,811,647.40 Rp 162,533,250.80
JUMLAH TOTAL Rp 2,978,928,121.35 Rp 1,787,865,758.77
DIBULATKAN Rp 2,978,928,000.00 Rp 1,787,865,000.00

Mengetahui :

Mengetahui : Disetujui : Diperiksa : Diperiksa : Diperiksa : Dibuat Oleh :


KONTRAKTOR PELAKSANA
PENGGUNA JASA PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN DIREKSI TEKNIS DIREKSI TEKNIS PT. ADDIS PRATAMA PERSADA
PEJABAT PEMBUAT KOMITMEN (PPTK)
(PPK)

Ir. ISNAINY P. SIRADJU, M,Sc RIO PICAL SUBUH, ST FIKOH ALBUGIS, ST ARYANI JATININGSIH, ST YUNI KARTIKA, SS ADAM MARSAOLY
NIP. 19620512 199303 1 007 NIP. 19860705 200903 1 002 NIP. 19800119 201001 1 007 NIP. 19960124 201902 2 003 NPTT : 2020 646 Direktur
Laporan Kemajuan Pekerjaan

PROGRAM : PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN


PEKERJAAN : Pemeliharaan Berkala/Rehabilitasi Jalan (Khusus Kota) JL. MOYA-BUKUBANDERA
LOKASI : KOTA TERNATE
TAHUN ANGGARAN : 2021
NOMOR KONTRAK : 600/446/DPUPR/KT/2021, Tanggal 18 Februari 2021
NOMOR ADDENDUM KONT : 600/2475/DPUPR/KT/2021, Tanggal 10 September 2021
NILAI KONTRAK : Rp 2,978,928,000.00 Sampai dengan Tanggal : 13 November 2021

Progres Fisik Lapangan


Satuan Bobot
No. Uraian Pekerjaan Volume Harga Satuan (Rp.) Jumlah Harga Bobot ( % ) Jumlah Harga
(Rp.) Volume
(Rp.)
(%)
1 2 3 4 5 6 7 8 9 10

DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS Rp 60,000,000.00 Rp 60,000,000.00 2.22 0.80 Rp 48,000,000 1.77
1.8 Manajemen dan Keselamatan Lalu Lintas 1.00 LS Rp 14,823,225.00 Rp 14,823,225.00 0.55 0.80 Rp 11,858,580 0.44
1.19 Keselamatan dan Kesehatan Kerja 1.00 LS Rp 12,340,000.00 Rp 12,340,000.00 0.46 0.80 Rp 9,872,000 0.36

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 133.59 M3 Rp 52,523.95 Rp 7,016,674.48 0.26 133.59 Rp 7,016,674 0.26
2.2.(1) Pasangan Batu dengan Mortar 47.55 M3 Rp 1,598,834.65 Rp 76,024,587.61 2.81 39.99 Rp 63,937,398 2.36

DIVISI 3. PEKERJAAN TANAH


3.1 Galian Biasa 168.27 M3 Rp 57,951.87 Rp 9,751,503.21 0.36 168.27 Rp 9,751,503 0.36
3.3 Penyiapan Badan Jalan 2,391.80 M2 Rp 13,981.02 Rp 33,439,803.64 1.23 2,391.80 Rp 33,439,804 1.23

DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A 190.54 M2 Rp 701,008.11 Rp 133,570,085.28 4.93 190.54 Rp 133,570,085 4.93
5.1.(2) Lapis Pondasi Agregat Kelas B 141.70 M2 Rp 442,502.80 Rp 62,700,710.81 2.32 141.70 Rp 62,700,711 2.32
5.7 Lapis Pondasi Bawah (LPB) Telford 878.10 M2 Rp 109,468.01 Rp 96,123,860.28 3.55 644.70 Rp 70,574,027 2.61

DIVISI 6. PERKERASAN ASPAL


6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair/Emuls 1,524.32 Liter Rp 18,272.90 Rp 27,853,746.93 1.03 1524.32 Rp 27,853,747 1.03
6.3.(4a) Lapis Perekat - Aspal Cair/Emulsi 3,592.14 Liter Rp 20,237.38 Rp 72,695,501.37 2.68 3,592.14 Rp 72,695,501 2.68
6.3.(4a) Lataston Lapis Fondasi (HRS - Base) 915.48 Ton Rp 1,869,927.47 Rp 1,711,885,925.15 63.21 915.48 Rp 1,711,885,925 63.21
6.7.(1) Lapis Penetrasi Macadam 43.91 M3 Rp 2,236,069.40 Rp 98,185,807.30 3.63 0.00 Rp - 0.00
DIVISI 7. STRUKTUR
7.1 Beton strukur, fc’20 Mpa 0.874 M3 Rp 1,958,200.00 Rp 1,711,466.80 0.06 0.874 Rp 1,711,467 0.06
7.3 Baja Tulangan Polos-BjTP 280 83.878 Kg Rp 17,300.00 Rp 1,451,089.40 0.05 83.878 Rp 1,451,089 0.05
7.9 Pasangan Batu 234.00 M3 Rp 1,233,087.55 Rp 288,542,486.70 10.65 112.18 Rp 138,333,002 5.11

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.2.(1) Marja Jalan Termoplastik - - - - - - - -

JUMLAH FISIK Rp 2,708,116,473.95 100.00 Rp 2,404,651,513.25 88.79


PPN 10 % Rp 270,811,647.40 Rp 240,465,151.33
JUMLAH TOTAL Rp 2,978,928,121.35 Rp 2,645,116,664.58
DIBULATKAN Rp 2,978,928,000.00 Rp 2,645,116,000.00
Mengetahui :

Disetujui : Diperiksa : Diperiksa : Diperiksa : Dibuat Oleh :


Mengetahui :
KONTRAKTOR PELAKSANA
PENGGUNA JASA PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN DIREKSI TEKNIS DIREKSI TEKNIS PT. ADDIS PRATAMA PERSADA
PEJABAT PEMBUAT KOMITMEN (PPTK)
(PPK)

Ir. ISNAINY P. SIRADJU, M,Sc RUSMANSYAH, ST.,MT FIKOH ALBUGIS, ST ARYANI JATININGSIH, ST YUNI KARTIKA, SS ADAM MARSAOLY
NIP. 19620512 199303 1 007 NIP. 19720908 200112 1 003 NIP. 19800119 201001 1 007 NIP. 19960124 201902 2 003 NPTT : 2020 646 Direktur
GALIAN SALURAN

SEGMEN I SEGMEN II

STA GAMBAR PANJANG LEBAR TINGGI VOLUME STA GAMBAR PANJANG LEBAR TINGGI VOLUME
0+000 0 0.8 1 0+000 0 1 1.3
20 17.5
0+025 25 0.8 1 0+025 25 0.7 1
20 8.75
0+050 25 0.8 1 0+050 25 0.7 0.5
20 2.5
0+075 25 0.8 1 0+060 10 0.5 0.5
20.04
0+091,7 16.7 0.8 1.5 TOTAL 28.75 TOTAL VOLUME
= 133.59
GALIAN SALURAN
TOTAL 80.04 SEGMEN III

STA GAMBAR PANJANG LEBAR TINGGI VOLUME


0+000 0 0.8 1
20
0+025 25 0.8 1
4.8
0+031 6 0.8 1
0

TOTAL 24.8
GALIAN BIASA

SEGMEN I (MOYA)

STA GAMBAR PANJANG LEBAR TINGGI VOLUME


0+000 0 8.5 0.4 0.9
5.525
0+011 11 5.1 1.3 0.8
58.905
0+021 10 5.2 0.9 0.1
26
0+030 20 5.4 0.6 0
32.4
0+038 8 5.6 0.35 0
7.84
0+050 12 5.2 0.57 0
17.784
0+057 7 5.45 0.6 0
11.445
0+075 18 4.65 0.2 0
8.37
TOTAL 168.269
PENYIAPAN BADAN JALAN

PANJANG LEBAR VOLUME

MOYA 268.7 4 1074.80

AKE
312 3.5 1092.00
BOOCA
KEDATON
75 3 225.00
KECIL

RUFAN 743.6 3.5 2602.60

TOTAL 2391.80

743.76

PASANGAN BATU

SEGMEN I (MOYA)

LEBAR TINGGI
LUASAN
STA GAMBAR PANJANG LUASAN Volume
Atas 1 Atas 2 Bawah Atas Bawah RATA-RATA

0+000 0.3 0.8 1 1.41 0.6 1.3755 1.5 0.5 0.25 2.25 2 1.414214
25 1.73125 43.28125
0+025 0.3 0.8 1 2.34 0.8 2.087 2.4 0.5 0.25 5.76 5.51 2.347339
25 1.701 42.525
0+050 0.3 0.8 1 1.3 0.6 1.315 1.4 0.5 0.25 1.96 1.71 1.30767
22 1.199 26.378
0+072 0.3 0.8 1 1.06 0.5 1.083 1.18 0.5 0.25 1.3924 1.1424 1.068831

TOTAL 112.18425

SEGMEN I (AKE BOOCA)

LEBAR LUASAN
STA GAMBAR PANJANG TINGGI LUASAN RATA- Volume
Atas 1 Atas 2 RATA
0+000 0.3 0.8 1.7 0.935 Vtotal = 234.792
25 1.2925 32.3125
0+025 0.3 0.8 3 1.65
25 1.485 37.125
0+050 0.3 0.8 2.4 1.32
25 1.2925 32.3125
0+075 0.3 0.8 2.3 1.265
27 0.7725 20.8575
0+102 0.3 0.4 0.8 0.28

TOTAL 4.8425 122.6075


PASANGAN BATU DENGAN MORTAR

SALURAN 1 (AKE BOOCA)

LEBAR TINGGI LUASAN


STA GAMBAR PANJANG LUASAN RATA- VOLUME
LUAR DALAM LUAR DALAM
RATA
0+000 0.67 0.37 0.6 0.45 0.2355
50 0.24525 12.2625
0+050 0.7 0.4 0.65 0.5 0.255
25.3 0.3015 7.62795
0+075,3 0.7 0.4 0.96 0.81 0.348
10 0.3765 3.765
0+085,3 0.7 0.4 1.15 1 0.405

TOTAL 23.65545 Vtotal 47.5511

SALURAN 2 (AKE BOOCA) ARAH LAO

LEBAR TINGGI
STA GAMBAR PANJANG LUASAN LUASAN VOLUME
LUAR DALAM LUAR DALAM
0+000 0.72 0.42 0.58 0.43 0.237
50 0.27375 13.6875
0+050 0.73 0.43 0.82 0.67 0.3105
5.1 0.381 1.9431
0+55,1 1.01 0.71 1.15 1 0.4515

TOTAL 15.6306

SALURAN 3 (AKE BOOCA) SISI KANAN

LEBAR TINGGI LUASAN


STA GAMBAR PANJANG LUASAN RATA- VOLUME
LUAR DALAM LUAR DALAM
RATA
0+000 0.7 0.4 0.65 0.5 0.255
25 0.255 6.375
0+025 0.7 0.4 0.65 0.5 0.255
6 0.315 1.89
0+031 0.7 0.4 1.05 0.9 0.375

TOTAL 8.265
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2019
PROGRESS REPORT

KEGIATAN : PENINGKATAN JALAN KELILING PULAU MOTI


LOKASI : PULAU MOTI
NO. & TGL KONTRAK : 600/2119/DPUPR/KT/2019 DAN 24 MEI 2019
NO. & TGL ADDENDUM KONTRAK : 600/2919/DPUPR/KT/2019 DAN 16 JULI 2019
: 600/4292/DPUPR/KT/2019 DAN 20 SEPTEMBER 2019
No. Laporan 05
: 600/5277/DPUPR/KT/2019 DAN 18 NOVEMBER 2019
: 600/5886/DPUPR/KT/2019 DAN 20 DESEMBER 2019
NILAI KONTRAK : Rp 4,711,086,000.00 Mulai - Sampai Tgl. 11 Desember 2019 s/d 26 Desember 2019
PELAKSANA : CV. TUANANE JAYA PROGRESS 98.35

URAIAN ADDENDUM URAIAN REALISASI


NO. URAIAN
Bobot Bobot
Satuan Volume Harga Satuan Jumlah Harga Pajak (10%) Total Setelah Pajak Volume Harga Satuan Jumlah Harga Pajak (10%) Total Setelah Pajak
DIV. PEKERJAAN (%) (%)

DIVISI 1. UMUM

1.2 Mobilisasi
LS 1.00 Rp 34,635,000.00
Rp 34,635,000.00 Rp 3,463,500.00 38,098,500.00 0.81 1.00 Rp 34,635,000.00 Rp 34,635,000.00 Rp 3,463,500.00 Rp 38,098,500.00 0.81

1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.00 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 12,100,000.00 0.26 1.0 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26
DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air


M3 104.00 Rp 83,675.00
Rp 8,702,200.00 Rp 870,220.00 9,572,420.00 0.20 104.00 Rp 83,675.00 Rp 8,702,200.00 Rp 870,220.00 Rp 9,572,420.00 0.20

2.2.(1) Pasangan Batu dengan Mortar


M3 50.00 Rp 1,456,790.25
Rp 72,839,512.50 Rp 7,283,951.25 80,123,463.75 1.70 50.00 Rp 1,456,790.25 Rp 72,839,512.50 Rp 7,283,951.25 Rp 80,123,463.75 1.70

DIVISI 3. PEKERJAAN TANAH

3.1.(1a) Galian Biasa


M3 296.67 Rp 117,754.90
Rp 34,934,346.18 Rp 3,493,434.62 38,427,780.80 0.82 296.67 Rp 117,754.90 Rp 34,934,346.18 Rp 3,493,434.62 Rp 38,427,780.80 0.82

3.2.(1a) Timbunan Biasa dari sumber galian


M3 741.79 Rp 259,956.99
Rp 192,833,495.61 Rp 19,283,349.56 212,116,845.17 4.50 741.79 Rp 259,956.99 Rp 192,833,495.61 Rp 19,283,349.56 Rp 212,116,845.17 4.50

3.3.(1) Penyiapan Badan Jalan


M2 7,742.50 Rp 534.00
Rp 4,134,495.58 Rp 413,449.56 4,547,945.13 0.10 7,742.50 Rp 534.00 Rp 4,134,495.58 Rp 413,449.56 Rp 4,547,945.13 0.10

DIVISI 5. PERKERASAN BERBUTIR


5.2 (1)b Lapis Pondasi Bawah dengan Telford M2 6,356.25 Rp 159,072.49 Rp 1,011,104,514.56 Rp 101,110,451.46 1,112,214,966.02 23.61 6,296.25 Rp 159,072.49 Rp 1,001,560,165.16 Rp 100,156,016.52 Rp 1,101,716,181.68 23.39

DIVISI 6. PERKERASAN ASPAL


6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 6,936.40 Rp 16,535.83 Rp 114,699,131.21 Rp 11,469,913.12 126,169,044.33 2.68 6,536.40 Rp 16,535.83 Rp 108,084,799.21 Rp 10,808,479.92 Rp 118,893,279.13 2.52

6.6.(1) M3 693.64 Rp 2,719,730.76 Rp 1,886,514,044.37 Rp 188,651,404.44 2,075,165,448.80 44.05 673.64 Rp 2,719,731 Rp 1,832,119,429.17 Rp 183,211,942.92 Rp 2,015,331,372.08 42.78
Lapis Permukaan Penetrasi Macadam

DIVISI 7. STRUKTUR

7.1 (7) a Beton mutu sedang fc’20 MPa


M3 14.10 Rp 2,780,000.00
Rp 39,198,000.00 Rp 3,919,800.00 43,117,800.00 0.92 14.10 Rp 2,780,000 Rp 39,198,000.00 Rp 3,919,800.00 Rp 43,117,800.00 0.92

7.3 (1) Baja Tulangan U 24 Polos


Kg 2,196.62 Rp 16,900.00
Rp 37,122,878.00 Rp 3,712,287.80 40,835,165.80 0.87 2,196.62 Rp 16,900 Rp 37,122,878.00 Rp 3,712,287.80 Rp 40,835,165.80 0.87
7.9.(1)
Pasangan Batu
M3 345.80 Rp 1,502,895.36
Rp 519,701,215.49 Rp 51,970,121.55 571,671,337.04 12.13 345.80 Rp 1,502,895 Rp 519,701,215.49 Rp 51,970,121.55 Rp 571,671,337.04 12.13
7.10.(2) M3 486.00 Rp 315,387,270.00 Rp 31,538,727.00 346,925,997.00 7.36 486 648945 Rp 315,387,270.00 Rp 31,538,727.00 Rp 346,925,997.00 7.36
Pasangan Batu Kosong Rp 648,945.00

JUMLAH TOTAL Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 Rp 100.00 Rp 4,212,252,806.90 Rp 421,225,280.69 Rp 4,633,478,087.59 98.35

PEMBULATAN Rp 4,711,086,000.00
Mengetahui :
Diperiksa Oleh : Dibuat Oleh :
Disetujui : KONSULTAN SUPERVISI
Mengetahui : Mengetahui : KONTRAKTOR PELAKSANA
PEJABAT PEMBUAT KOMITMEN DIREKSI LAPANGAN CV. MEGACOPOLE RAYA
PEJABAT PELAKSANA TEKNIS KEGIATAN CV. TUANANE JAYA
(PPK) (PPTK)

RUSMANSYAH, ST. MT. MUNAJAT, ST ASGAR Hi. KAIDATI


BAMBANG T. MARADJABESSY, ST RUSDI MALIK Site Engineering
NIP. 19780807 200501 1 012 NIP. 19660828 200112 1 003 Direktur
NIP. 19690727 2002 12 1 007
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2019
PROGRESS REPORT

KEGIATAN : PENINGKATAN JALAN KELILING PULAU MOTI


LOKASI : PULAU MOTI
NO. & TGL KONTRAK : 600/2119/DPUPR/KT/2019 DAN 24 MEI 2019
NO. & TGL ADDENDUM KONTRAK 600/2919/DPUPR-KT/2019 DAN 16 JULI 2019 No. Laporan 04
NILAI KONTRAK : Rp 4,711,086,000.00 Mulai - Sampai Tgl. 11 Oktober 2019 s/d 10 Desember 2019
PELAKSANA : CV. TUANANE JAYA PROGRESS 85.04

URAIAN ADDENDUM URAIAN REALISASI


NO. URAIAN
Bobot Bobot
Satuan Volume Harga Satuan Jumlah Harga Pajak (10%) Total Setelah Pajak Volume Harga Satuan Jumlah Harga Pajak (10%) Total Setelah Pajak
DIV. PEKERJAAN (%) (%)

DIVISI 1. UMUM

1.2 Mobilisasi
LS 1.00 Rp 34,635,000.00
Rp 34,635,000.00 Rp 3,463,500.00 38,098,500.00 0.81 0.60 Rp 34,635,000.00 Rp 20,781,000.00 Rp 2,078,100.00 Rp 22,859,100.00 0.49

1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.00 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 12,100,000.00 0.26 1.0 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26
DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air


M3 104.00 Rp 83,675.00
Rp 8,702,200.00 Rp 870,220.00 9,572,420.00 0.20 104.00 Rp 83,675.00 Rp 8,702,200.00 Rp 870,220.00 Rp 9,572,420.00 0.20

2.2.(1) Pasangan Batu dengan Mortar


M3 50.00 Rp 1,456,790.25
Rp 72,839,512.50 Rp 7,283,951.25 80,123,463.75 1.70 50.00 Rp 1,456,790.25 Rp 72,839,512.50 Rp 7,283,951.25 Rp 80,123,463.75 1.70

DIVISI 3. PEKERJAAN TANAH

3.1.(1a) Galian Biasa


M3 296.67 Rp 117,754.90
Rp 34,934,346.18 Rp 3,493,434.62 38,427,780.80 0.82 296.67 Rp 117,754.90 Rp 34,934,346.18 Rp 3,493,434.62 Rp 38,427,780.80 0.82

3.2.(1a) Timbunan Biasa dari sumber galian


M3 741.79 Rp 259,956.99
Rp 192,833,495.61 Rp 19,283,349.56 212,116,845.17 4.50 741.79 Rp 259,956.99 Rp 192,833,495.61 Rp 19,283,349.56 Rp 212,116,845.17 4.50

3.3.(1) Penyiapan Badan Jalan


M2 7,742.50 Rp 534.00
Rp 4,134,495.58 Rp 413,449.56 4,547,945.13 0.10 7,742.5 Rp 534.00 Rp 4,134,495.58 Rp 413,449.56 Rp 4,547,945.13 0.10

DIVISI 5. PERKERASAN BERBUTIR


5.2 (1)b Lapis Pondasi Bawah dengan Telford M2 6,356.25 Rp 159,072.49 Rp 1,011,104,514.56 Rp 101,110,451.46 1,112,214,966.02 23.61 4,236.25 Rp 159,072.49 Rp 673,870,835.76 Rp 67,387,083.58 Rp 741,257,919.34 15.73

DIVISI 6. PERKERASAN ASPAL


6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 6,936.40 Rp 16,535.83 Rp 114,699,131.21 Rp 11,469,913.12 126,169,044.33 2.68 5,876.40 Rp 16,535.83 Rp 97,171,151.41 Rp 9,717,115.14 Rp 106,888,266.55 2.27

6.6.(1) M3 693.64 Rp 2,719,730.76 Rp 1,886,514,044.37 Rp 188,651,404.44 2,075,165,448.80 44.05 593.64 Rp 2,719,731 Rp 1,614,540,968.37 Rp 161,454,096.84 Rp 1,775,995,065.20 37.70
Lapis Permukaan Penetrasi Macadam

DIVISI 7. STRUKTUR

7.1 (7) a Beton mutu sedang fc’20 MPa


M3 14.10 Rp 2,780,000.00
Rp 39,198,000.00 Rp 3,919,800.00 43,117,800.00 0.92 14.10 Rp 2,780,000 Rp 39,198,000.00 Rp 3,919,800.00 Rp 43,117,800.00 0.92

7.3 (1) Baja Tulangan U 24 Polos


Kg 2,196.62 Rp 16,900.00
Rp 37,122,878.00 Rp 3,712,287.80 40,835,165.80 0.87 2,196.62 Rp 16,900 Rp 37,122,878.00 Rp 3,712,287.80 Rp 40,835,165.80 0.87
7.9.(1) M3 345.80 Rp Rp 519,701,215.49 Rp 51,970,121.55 571,671,337.04 12.13 345.80 Rp 1,502,895 Rp 519,701,215.49 Rp 51,970,121.55 Rp 571,671,337.04 12.13
Pasangan Batu 1,502,895.36
7.10.(2) M3 486.00 Rp Rp 315,387,270.00 Rp 31,538,727.00 346,925,997.00 7.36 486 648945 Rp 315,387,270.00 Rp 31,538,727.00 Rp 346,925,997.00 7.36
Pasangan Batu Kosong 648,945.00

JUMLAH TOTAL Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 Rp 100.00 Rp 3,642,217,368.90 Rp 364,221,736.89 Rp 4,006,439,105.79 85.04

PEMBULATAN Rp 4,711,086,000.00
Mengetahui :
Diperiksa Oleh :
Disetujui : KONSULTAN SUPERVISI Dibuat Oleh :
Mengetahui : Mengetahui : KONTRAKTOR PELAKSANA
PEJABAT PEMBUAT KOMITMEN DIREKSI LAPANGAN CV. MEGACOPOLE RAYA
PEJABAT PELAKSANA TEKNIS KEGIATAN CV. TUANANE JAYA
(PPK) (PPTK)

RUSMANSYAH, ST. MT. MUNAJAT, ST


RUSDI MALIK Site Engineering ASGAR Hi. KAIDATI
BAMBANG T. MARADJABESSY, ST NIP. 19780807 200501 1 012 Direktur
NIP. 19690727 2002 12 1 007 NIP. 19660828 200112 1 003
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2019
PROGRESS REPORT (MC - 2)

KEGIATAN : PENINGKATAN JALAN KELILING PULAU MOTI


LOKASI : PULAU MOTI
NO. & TGL KONTRAK : 600/2119/DPUPR/KT/2019 DAN 24 MEI 2019 No. Laporan 02
NO. & TGL ADDENDUM KONTRAK 600/2919/DPUPR-KT/2019 DAN 16 JULI 2019
NILAI KONTRAK : Rp 4,711,086,000.00 Mulai - Sampai Tgl. 16 JULI 2019 s/d 24 AGUSTUS 2019
PELAKSANA : CV. TUANANE JAYA Tanggal 32.88

URAIAN KONTRAK URAIAN ADDENDUM URAIAN REALISASI


NO. URAIAN
Bobot Bobot
Satuan Volume Harga Satuan Jumlah Harga Pajak (10%) Total Setelah Pajak
Bobot Volume Harga Satuan Jumlah Harga Pajak (10%) Total Setelah Pajak Volume Harga Satuan Jumlah Harga Pajak (10%) Total Setelah Pajak
DIV. PEKERJAAN (%)
(%) (%)

DIVISI 1. UMUM

1.2 Mobilisasi
LS 1.00 Rp 34,635,000.00 Rp 34,635,000.00 Rp 3,463,500.00 Rp 38,098,500.00 0.81 1.00 Rp 34,635,000.00
Rp 34,635,000.00 Rp 3,463,500.00 38,098,500.00 0.81 0.30 Rp 34,635,000.00 Rp 10,390,500.00 Rp 1,039,050.00 Rp 11,429,550.00 0.24

1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.00 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26 1.00 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 12,100,000.00 0.26 1.0 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26
DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air


M3 104.00 Rp 83,675.00 Rp 8,702,200.00 Rp 870,220.00 Rp 9,572,420.00 0.20 104.00 Rp 83,675.00
Rp 8,702,200.00 Rp 870,220.00 9,572,420.00 0.20 104.00 Rp 83,675.00 Rp 8,702,200.00 Rp 870,220.00 Rp 9,572,420.00 0.20

2.2.(1) Pasangan Batu dengan Mortar


M3 50.00 Rp 1,456,790.25 Rp 72,839,512.50 Rp 7,283,951.25 Rp 80,123,463.75 1.70 50.00 Rp 1,456,790.25
Rp 72,839,512.50 Rp 7,283,951.25 80,123,463.75 1.70 50.00 Rp 1,456,790.25 Rp 72,839,512.50 Rp 7,283,951.25 Rp 80,123,463.75 1.70
Rp -
DIVISI 3. PEKERJAAN TANAH

3.1.(1a) Galian Biasa


M3 148.00 Rp 117,754.90 Rp 17,427,725.20 Rp 1,742,772.52 Rp 19,170,497.72 0.41 296.67 Rp 117,754.90
Rp 34,934,346.18 Rp 3,493,434.62 38,427,780.80 0.82 180.40 Rp 117,754.90 Rp 21,242,983.96 Rp 2,124,298.40 Rp 23,367,282.36 0.50

3.2.(1a) Timbunan Biasa dari sumber galian


M3 320.00 Rp 259,956.99 Rp 83,186,236.80 Rp 8,318,623.68 Rp 91,504,860.48 1.94 741.79 Rp 259,956.99
Rp 192,833,495.61 Rp 19,283,349.56 212,116,845.17 4.50 320.00 Rp 259,956.99 Rp 83,186,236.80 Rp 8,318,623.68 Rp 91,504,860.48 1.94

3.3.(1) Penyiapan Badan Jalan


M2 9,016.00 Rp 534.00 Rp 4,814,544.00 Rp 481,454.40 Rp 5,295,998.40 0.11 7,742.50 Rp 534.00
Rp 4,134,495.58 Rp 413,449.56 4,547,945.13 0.10 7,742.5 Rp 534.00 Rp 4,134,495.58 Rp 413,449.56 Rp 4,547,945.13 0.10
Rp -
DIVISI 5. PERKERASAN BERBUTIR
5.2 (1)b Lapis Pondasi Bawah dengan Telford M2 8,810.00 Rp 159,072.49 Rp 1,401,428,636.90 Rp 140,142,863.69 Rp 1,541,571,500.59 32.72 6,356.25 Rp 159,072.49 Rp 1,011,104,514.56 Rp 101,110,451.46 1,112,214,966.02 23.61 - Rp 159,072.49 Rp - Rp - Rp - -
-
DIVISI 6. PERKERASAN ASPAL -
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 6,582.00 Rp 16,535.83 Rp 108,838,833.06 Rp 10,883,883.31 Rp 119,722,716.37 2.54 6,936.40 Rp 16,535.83 Rp 114,699,131.21 Rp 11,469,913.12 126,169,044.33 2.68 2,240.00 Rp 16,535.83 Rp 37,040,259.20 Rp 3,704,025.92 Rp 40,744,285.12 0.86

6.6.(1) M3 658.00 Rp 2,719,731 Rp 1,789,582,840.08 Rp 178,958,284.01 Rp 1,968,541,124.09 41.79 693.64 Rp 2,719,730.76 Rp 1,886,514,044.37 Rp 188,651,404.44 2,075,165,448.80 44.05 160 Rp 2,719,731 Rp 435,156,921.60 Rp 43,515,692.16 Rp 478,672,613.76 10.16
Lapis Permukaan Penetrasi Macadam

DIVISI 7. STRUKTUR

7.1 (7) a Beton mutu sedang fc’20 MPa


M3 18.30 Rp 2,780,000 Rp 50,874,000.00 Rp 5,087,400.00 Rp 55,961,400.00 1.19 14.10 Rp 2,780,000.00
Rp 39,198,000.00 Rp 3,919,800.00 43,117,800.00 0.92 Rp 2,780,000 Rp - Rp - Rp - -

7.3 (1) Baja Tulangan U 24 Polos


Kg 1,740.00 Rp 16,900 Rp 29,406,000.00 Rp 2,940,600.00 Rp 32,346,600.00 0.69 2,196.62 Rp 16,900.00
Rp 37,122,878.00 Rp 3,712,287.80 40,835,165.80 0.87 Rp 16,900 Rp - Rp - Rp - -
7.9.(1)
Pasangan Batu
M3 236.00 Rp 1,502,895 Rp 354,683,304.96 Rp 35,468,330.50 Rp 390,151,635.46 8.28 345.80 Rp 1,502,895.36
Rp 519,701,215.49 Rp 51,970,121.55 571,671,337.04 12.13 272.16 Rp 1,502,895 Rp 409,028,001.18 Rp 40,902,800.12 Rp 449,930,801.30 9.55
7.10.(2) M3 486.00 648945 Rp 315,387,270.00 Rp 31,538,727.00 Rp 346,925,997.00 7.36 486.00 Rp 315,387,270.00 Rp 31,538,727.00 346,925,997.00 7.36 486 648945 Rp 315,387,270.00 Rp 31,538,727.00 Rp 346,925,997.00 7.36
Pasangan Batu Kosong Rp 648,945.00

JUMLAH TOTAL Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 100.00 Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 Rp 100.00 Rp 1,408,108,380.81 Rp 140,810,838.08 Rp 1,548,919,218.89 32.88

PEMBULATAN Rp 4,711,086,000.00 Rp 4,711,086,000.00


Mengetahui :
Mengetahui : Disetujui : Diperiksa Oleh : Dibuat Oleh :
Mengetahui : KONSULTAN SUPERVISI
PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN KONTRAKTOR PELAKSANA
(PPTK) CV. MEGACOPOLE RAYA CV. TUANANE JAYA
(PPK)

RUSMANSYAH, ST. MT. RUSDI MALIK MUNAJAT, ST ASGAR Hi. KAIDATI


BAMBANG T. MARADJABESSY, ST Site Engineering
NIP. 19690727 2002 12 1 007 NIP. 19780807 200501 1 012 NIP. 19660828 200112 1 003 Direktur
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2018
PROGRESS REPORT (MC - 1)

KEGIATAN : PENINGKATAN JALAN KELILING PULAU MOTI


LOKASI : PULAU MOTI
NO. & TGL KONTRAK : 600/2119/DPUPR/KT/2019 DAN 24 MEI 2019 No. Laporan 01
NILAI KONTRAK : Rp 4,711,086,000.00 Mulai - Sampai Tgl. 24 MEI S/D 10 JULI 2019
PELAKSANA : CV. TUANANE JAYA Tanggal #REF!

URAIAN KONTRAK URAIAN REALISASI


NO. URAIAN
Bobot
Harga Satuan Bobot
Satuan Volume Jumlah Harga Volume Harga Satuan Jumlah Harga
DIV. PEKERJAAN (%)
(%)

DIVISI 1. UMUM

1.2 Mobilisasi
LS 1.00 Rp 34,635,000.00 Rp 34,635,000.00 0.81 0.25 Rp 34,635,000.00 Rp 8,658,750.00 0.20

1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.0 Rp 11,000,000.00 Rp 11,000,000.00 0.26 1.0 Rp 11,000,000.00 Rp 11,000,000.00 0.26
DIVISI 2. DRAINASE -

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air


M3 104 Rp 83,675.00 Rp 8,702,200.00 0.20 52.00 Rp 83,675.00 Rp 4,351,100.00 0.10

2.2.(1) Pasangan Batu dengan Mortar


M3 50.00 Rp 1,456,790.25 Rp 72,839,512.50 1.70 12.50 Rp 1,456,790.25 Rp 18,209,878.13 0.43
Rp - -
DIVISI 3. PEKERJAAN TANAH -

3.1.(1a) Galian Biasa


M3 148.00 Rp 117,754.90 Rp 17,427,725.20 0.41 41.70 Rp 117,754.90 Rp 4,910,379.33 0.11

3.2.(1a) Timbunan Biasa dari sumber galian


M3 320.0 Rp 259,956.99 Rp 83,186,236.80 1.94 280.00 Rp 259,956.99 Rp 72,787,957.20 1.70

3.3.(1) Penyiapan Badan Jalan


M2 9,016.0 Rp 534.00 Rp 4,814,544.00 0.11 9,016.0 Rp 534.00 Rp 4,814,544.00 0.11
Rp - -
DIVISI 5. PERKERASAN BERBUTIR -
5.2 (1)b Lapis Pondasi Bawah dengan Telford M2 8810 Rp 159,072.49 Rp 1,401,428,636.90 32.72 Rp 159,072.49 Rp - -
Rp - -
DIVISI 6. PERKERASAN ASPAL Rp - -
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 6,582.00 Rp 16,535.83 Rp 108,838,833.06 2.54 #REF! Rp 16,535.83 #REF! #REF!

6.6.(1) M3 658 Rp 2,719,731 Rp 1,789,582,840.08 41.79 Rp 2,719,731 Rp - -


Lapis Permukaan Penetrasi Macadam
Rp - -
DIVISI 7. STRUKTUR
Rp - -

7.1 (7) a Beton mutu sedang fc’20 MPa


M3 18.3 Rp 2,780,000 Rp 50,874,000.00 1.19 Rp 2,780,000 Rp - -

7.3 (1) Baja Tulangan U 24 Polos


Kg 1740 Rp 16,900 Rp 29,406,000.00 0.69 Rp 16,900 Rp - -
7.9.(1)
Pasangan Batu
M3 236 Rp 1,502,895 Rp 354,683,304.96 8.28 146 Rp 1,502,895 Rp 219,422,722.56 5.12
7.10.(2) M3 486 648945 Rp 315,387,270.00 7.36 486 648945 Rp 315,387,270.00 7.36
Pasangan Batu Kosong

JUMLAH HARGA FISIK Rp 4,282,806,103.50 100.00 #REF! #REF!


Ppn 10 % Rp 428,280,610.35 #REF!
JUMLAH TOTAL Rp 4,711,086,713.85 #REF!
PEMBULATAN Rp 4,711,086,000.00 #REF!
Mengetahui :
Mengetahui : Disetujui : Diperiksa Oleh : Dibuat Oleh :
Mengetahui : KONSULTAN SUPERVISI
PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN KONTRAKTOR PELAKSANA
(PPTK) CV. MEGACOPOLE RAYA CV. TUANANE JAYA
(PPK)

RUSMANSYAH, ST. MT. RUSDI MALIK MUNAJAT, ST ASGAR Hi. KAIDATI


BAMBANG T. MARADJABESSY, ST Site Engineering
NIP. 19690727 2002 12 1 007 NIP. 19780807 200501 1 012 NIP. 19660828 200112 1 003 Direktur
Lampiran Berita Acara Rapat Panitia Peneliti Pelaksanaan Kontrak
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2018
CONTRACT CHANGE ORDER (CCO)
KEGIATAN : PENINGKATAN JALAN TERNATE 2 (SELATAN)
LOKASI : KOTA TERNATE
NO. & TGL KONTRAK : 620/1919/DPUPR/KT/2018, TANGGAL 12 APRIL 2018
NILAI KONTRAK : Rp 3,673,353,000.00
PELAKSANA : PT. ALFA ADIEL

URAIAN KONTRAK PEKERJAAN TAMBAH KURANG URAIAN ADDENDUM


NO. URAIAN Pekerjaan Tambah Pekerjaan Kurang
Bobot
Harga Satuan Jumlah Harga Bobot
Satuan Volume Jumlah Harga Volume Harga Satuan Jumlah Harga
DIV. PEKERJAAN Volume Volume Jumlah Harga (Rp.) (%)
(%) (Rp.)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 - - - - 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 298.35 Rp 64,500.83 Rp 19,243,822.63 0.58 203.45 13,122,693.86 - - 501.80 Rp 64,500.83 Rp 32,366,516.49 0.97
2.2.(1) Pasangan Batu dengan Mortar M3 186.15 Rp 1,251,977.05 Rp 233,055,527.74 6.98 - - 13.76 17,225,639.13 172.39 Rp 1,251,977.05 Rp 215,829,888.61 6.46

DIVISI 3. PEKERJAAN TANAH


3.3.(1) Penyiapan Badan Jalan M2 14,900.50 Rp 1,778.60 Rp 26,427,502.10 0.79 1,224.25 2,251,983.76 16,124.75 Rp 1,778.60 Rp 28,679,485.86 0.86
3.1.(1a) Galian Biasa M3 - Rp - Rp - - 10.53 968,696.71 - - 10.53 Rp 91,993.99 Rp 968,696.71 0.03

DIVISI 5. PERKERASAN BERBUTIR


5.1. (1) Lapis Pondasi Agregat Kelas A M3 279.07 Rp 845,618.56 Rp 235,990,155.27 7.07 - - 2.17 1,831,442.60 276.91 Rp 845,618.56 Rp 234,158,712.67 7.01
5.1. (2) Lapis Pondasi Agregat Kelas B M3 - Rp - Rp - - 35.00 28,993,372.80 - - 35.00 Rp 828,382.08 Rp 28,993,372.80 0.87

DIVISI 6. PERKERASAN ASPAL


6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 1,860.49 Rp 25,062.92 Rp 46,629,313.15 1.40 - - 383.65 9,615,296.92 1,476.84 Rp 25,062.92 Rp 37,014,016.23 1.11
6.1.(2)(a) Lapis Perekat - Aspal Cair Liter 4,564.00 Rp 25,767.10 Rp 117,601,121.70 3.52 1,172.08 30,201,085.22 - 5,736.08 Rp 25,767.10 Rp 147,802,206.92 4.43
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton 1,446.79 Rp 1,765,821.81 Rp 2,554,764,507.88 76.50 - - (15.10) (26,657,822.49) 1,461.88 Rp 1,765,821.81 Rp 2,581,422,329.88 77.30

DIVISI 7. STRUKTUR
7.1. (7) a Beton Mutu Sedang fc' = 20 Mpa M3 - Rp - Rp - - 0.96 2,245,626.86 - - 0.96 Rp 2,339,194.65 Rp 2,245,626.86 0.07
7.3. (1) Baja Tulangan U24 Polos Kg - Rp - Rp - - 9.91 178,909.20 - - 9.91 Rp 18,053.35 Rp 178,909.20 0.01
7.9. (1) Pasangan Batu M3 - Rp - Rp - - 7.72 8,218,293.35 - - 7.72 Rp 1,063,933.20 Rp 8,218,293.35 0.25

JUMLAH HARGA FISIK Rp 3,339,411,949.97 100.00 86,180,661.78 2,014,556.15 Rp 3,423,578,055.59 102.52


Ppn 10 % Rp 333,941,195.00 Rp 342,357,805.56
JUMLAH TOTAL Rp 3,673,353,144.97 Rp 3,765,935,861.15
PEMBULATAN Rp 3,673,353,000.00 Rp 3,765,935,000.00

Mengetahui : Ternate, 13 Juli 2018


Mengetahui : Disetujui : Diperiksa Oleh : Dibuat Oleh : Panitia Peneliti Pelaksanaan Kontrak
PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN DIREKSI LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA 1. SUAIB TEAPON, SE. ……………..
(PPTK) CV. SYAFFAH ENG. KONSULTAN PT. ALFA ADIEL
(Ketua)
2. GADANG WASISTO, A.Md. ……………..
(Sekretaris)
3. SETIJAHADI, A.Md. ……………..
RUSMANSYAH, ST. MT. HELMI NJIO FIKOH ALBUGIS, ST DJAMALUDDIN NAIM, ST MURSIDIN ARSY
NIP. 19780807 200501 1 012 Site Engineering Direktur (Anggota)
NIP. 19750303 200701 1 019 NIP. 19800119 201001 1 007
4. FIKOH ALBUGIS, ST. ……………..
(Anggota)
5. NAIM USMAN. ……………..
(Anggota)
Lampiran Berita Acara Rapat Panitia Peneliti Pelaksanaan Kontrak
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2019
CONTRACT CHANGE ORDER (CCO)
KEGIATAN : PENINGKATAN JALAN KELILING PULAU MOTI
LOKASI : PULAU MOTI
NO. & TGL KONTRAK : 600/2119/DPUPR/KT/2019 DAN 24 MEI 2019
NILAI KONTRAK : Rp 4,711,086,000.00
PELAKSANA : CV. TUANANE JAYA 148.67

URAIAN KONTRAK PEKERJAAN TAMBAH KURANG URAIAN ADDENDUM


NO. URAIAN Pekerjaan Tambah Pekerjaan Kurang
Bobot
Harga Satuan Jumlah Harga Bobot
Satuan Volume Jumlah Harga Jumlah Harga Volume Harga Satuan Jumlah Harga
DIV. PEKERJAAN Pajak Volume Volume Pajak (%)
(%)
Total Setelah Pajak (%) (Rp.) (Rp.) (%)
Total Setelah Pajak

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 34,635,000.00 Rp 34,635,000.00 Rp 3,463,500.00 Rp 38,098,500.00 0.81 - - - - 1.00 34,635,000.00 Rp 34,635,000.00 Rp 3,463,500.00 Rp 38,098,500.00 0.81
1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.00 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26 - - - - 1.00 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 104.00 83,675.00 Rp 8,702,200.00 Rp 870,220.00 Rp 9,572,420.00 0.20 - - - - 104.00 83,675.00 Rp 8,702,200.00 Rp 870,220.00 Rp 9,572,420.00 0.20
2.2.(1) Pasangan Batu dengan Mortar M3 50.00 1,456,790.25 Rp 72,839,512.50 Rp 7,283,951.25 Rp 80,123,463.75 1.70 - - - - 50.00 1,456,790.25 Rp 72,839,512.50 Rp 7,283,951.25 Rp 80,123,463.75 1.70
Rp -
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 148.00 117,754.90 Rp 17,427,725.20 Rp 1,742,772.52 Rp 19,170,497.72 0.41 148.67 19,257,283.08 296.67 117,754.90 Rp 34,934,346.18 Rp 3,493,434.62 Rp 38,427,780.80 0.82
3.2.(1a) Timbunan Biasa dari sumber galian M3 320.00 259,956.99 Rp 83,186,236.80 Rp 8,318,623.68 Rp 91,504,860.48 1.94 421.79 120,611,984.69 - - 741.79 259,956.99 Rp 192,833,495.61 Rp 19,283,349.56 Rp 212,116,845.17 4.50
3.3.(1) Penyiapan Badan Jalan M2 9,016.00 534.00 Rp 4,814,544.00 Rp 481,454.40 Rp 5,295,998.40 0.11 1,273.50 748,053.27 7,742.50 534.00 Rp 4,134,495.58 Rp 413,449.56 Rp 4,547,945.13 0.10

DIVISI 5. PERKERASAN BERBUTIR


5.2 (1)b Lapis Pondasi Bawah dengan Telford M2 8,810.00 159,072.49 Rp 1,401,428,636.90 Rp 140,142,863.69 Rp 1,541,571,500.59 32.72 - - 2,453.75 429,356,534.57 6,356.25 159,072.49 Rp 1,011,104,514.56 Rp 101,110,451.46 Rp 1,112,214,966.02 23.61

DIVISI 6. PERKERASAN ASPAL


6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 6,582.00 16,535.83 Rp 108,838,833.06 Rp 10,883,883.31 Rp 119,722,716.37 2.54 354.40 6,446,327.97 6,936.40 16,535.83 Rp 114,699,131.21 Rp 11,469,913.12 Rp 126,169,044.33 2.68
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 658.00 2,719,730.76 Rp 1,789,582,840.08 Rp 178,958,284.01 Rp 1,968,541,124.09 41.79 35.64 106,624,324.72 693.64 2,719,730.76 Rp 1,886,514,044.37 Rp 188,651,404.44 Rp 2,075,165,448.80 44.05

DIVISI 7. STRUKTUR

7.1 (7) a Beton mutu sedang fc’20 MPa M3 18.30 2,780,000.00


Rp 50,874,000.00 Rp 5,087,400.00 Rp 55,961,400.00 1.19 4.20 12,843,600.00 14.10 2,780,000.00
Rp 39,198,000.00 Rp 3,919,800.00 Rp 43,117,800.00 0.92

7.3 (1) Baja Tulangan U 24 Polos Kg 1,740.00 16,900.00 Rp 29,406,000.00 Rp 2,940,600.00 Rp 32,346,600.00 0.69 456.62 8,488,565.80 2,196.62 16,900.00 Rp 37,122,878.00 Rp 3,712,287.80 Rp 40,835,165.80 0.87
7.9.(1)
Pasangan Batu M3 236.00 1,502,895.36 Rp 354,683,304.96 Rp 35,468,330.50 Rp 390,151,635.46 8.28 109.80 181,519,701.58 - - 345.80 1,502,895.36 Rp 519,701,215.49 Rp 51,970,121.55 Rp 571,671,337.04 12.13
7.10.(2)
Pasangan Batu Kosong M3 486.00 648,945.00 Rp 315,387,270.00 Rp 31,538,727.00 Rp 346,925,997.00 7.36 - - - - 486.00 648,945.00 Rp 315,387,270.00 Rp 31,538,727.00 Rp 346,925,997.00 7.36

JUMLAH HARGA FISIK Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 100.00 442,948,187.84 442,948,187.84 Rp - Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 100.00
Ppn 10 % Rp 428,280,610.35 Rp 428,280,610.35
JUMLAH TOTAL Rp 4,711,086,713.85 Rp 4,711,086,713.85
PEMBULATAN Rp 4,711,086,000.00 Rp 4,711,086,000.00

Mengetahui : Ternate, 10 Juli 2019


Mengetahui : Disetujui : Diperiksa Oleh : Dibuat Oleh : Panitia Peneliti Pelaksanaan Kontrak
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA 1. BAMBANG OHOIMAS ……………..
DIREKSI LAPANGAN CV. MEGACOPOLE RAYA
(PPTK) CV. TUANANE JAYA
(Ketua)
2. MARDIANTI, ST ……………..
(Sekretaris)
3. SURA MANAMBUNG ……………..
RUSMANSYAH, ST. MT. RUSDI MALIK ASGAR Hi. KAIDATI
NIP. 19780807 200501 1 012 MUNAJAT, ST Direktur (Anggota)
NIP. 19660828 200112 1 003 Site Engineering 4. ARYANI JATININGSIH ……………..
(Anggota)
5. SETO HANDOKO ……………..
(Anggota)
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2018
PROGRESS REPORT
KEGIATAN : PENINGKATAN JALAN TERNATE 2 (SELATAN)
LOKASI : KOTA TERNATE
NO. & TGL KONTRAK : 620/1919/DPUPR/KT/2018, TANGGAL 12 APRIL 2018 No. Laporan 03
NILAI KONTRAK : Rp 3,673,353,000.00 Mulai - Sampai Tgl. 17 SEPTEMBER S/D 17 SEPTEMBER 2018
PELAKSANA : PT. ALFA ADIEL Tanggal 94.00

URAIAN KONTRAK URAIAN ADDENDUM URAIAN REALISASI


NO. URAIAN
Bobot Bobot
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
Satuan Volume Volume Volume Harga Satuan Jumlah Harga
DIV. PEKERJAAN (%) (%)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 1.00 Rp 105,700,000.00 Rp 105,700,000.00

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 298.35 Rp 64,500.83 Rp 19,243,822.63 0.58 501.80 Rp 64,500.83 Rp 32,366,516.49 0.97 501.80 Rp 64,500.83 Rp 32,366,516.49
2.2.(1) Pasangan Batu dengan Mortar M3 186.15 Rp 1,251,977.05 Rp 233,055,527.74 6.98 172.39 Rp 1,251,977.05 Rp 215,829,888.61 6.46 172.39 Rp 1,251,977.05 Rp 215,829,888.61

DIVISI 3. PEKERJAAN TANAH


3.3.(1) Penyiapan Badan Jalan M2 14,900.50 Rp 1,778.60 Rp 26,427,502.10 0.79 15,678.36 Rp 1,778.60 Rp 27,885,525.60 0.84 13,795.13 Rp 1,778.60 Rp 24,536,025.86
3.1.(1a) Galian Biasa M3 - Rp - Rp - - 10.53 Rp 91,993.99 Rp 968,696.71 0.03 10.53 Rp 91,993.99 Rp 968,696.71

DIVISI 5. PERKERASAN BERBUTIR


5.1. (1) Lapis Pondasi Agregat Kelas A M3 279.07 Rp 845,618.56 Rp 235,990,155.27 7.07 256.63 Rp 845,618.56 Rp 217,010,977.63 6.50 260.69 Rp 845,618.56 Rp 220,442,590.03
5.1. (2) Lapis Pondasi Agregat Kelas B M3 - Rp - Rp - - 35.00 Rp 828,382.08 Rp 28,993,372.80 0.87 35.00 Rp 828,382.08 Rp 28,993,372.80

DIVISI 6. PERKERASAN ASPAL


6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 1,860.49 Rp 25,062.92 Rp 46,629,313.15 1.40 1,368.69 Rp 25,062.92 Rp 34,303,433.59 1.03 1,371.67 Rp 25,062.92 Rp 34,378,035.43
6.1.(2)(a) Lapis Perekat - Aspal Cair Liter 4,564.00 Rp 25,767.10 Rp 117,601,121.70 3.52 5,602.59 Rp 25,767.10 Rp 144,362,591.10 4.32 5,165.13 Rp 25,767.10 Rp 133,090,540.95
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton 1,446.79 Rp 1,765,821.81 Rp 2,554,764,507.88 76.50 1,427.86 Rp 1,765,821.81 Rp 2,521,348,118.02 75.50 1,316.37 Rp 1,765,821.81 Rp 2,324,477,431.51

DIVISI 7. STRUKTUR
7.1. (7) a Beton Mutu Sedang fc' = 20 Mpa M3 - Rp - Rp - - 0.96 Rp 2,339,194.65 Rp 2,245,626.86 0.07 0.96 Rp 2,339,194.65 Rp 2,245,626.86
7.3. (1) Baja Tulangan U24 Polos Kg - Rp - Rp - - 9.91 Rp 18,053.35 Rp 178,909.20 0.01 9.91 Rp 18,053.35 Rp 178,909.20
7.9. (1) Pasangan Batu M3 - Rp - Rp - - 7.72 Rp 1,063,933.20 Rp 8,218,293.35 0.25 14.95 Rp 1,063,933.20 Rp 15,905,801.34

JUMLAH HARGA FISIK Rp 3,339,411,949.97 100.00 Rp 3,339,411,949.97 100.00 Rp 3,139,113,435.79


Ppn 10 % Rp 333,941,195.00 Rp 333,941,195.00 Rp 313,911,343.58
JUMLAH TOTAL Rp 3,673,353,144.97 Rp 3,673,353,144.97 Rp 3,453,024,779.37
PEMBULATAN Rp 3,673,353,000.00 Rp 3,673,353,000.00 Rp 3,453,024,000.00

Mengetahui : Menyetujui : Disetujui : Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN DIREKSI LAPANGAN KONTRAKTOR PELAKSANA
(PPK) (PPTK) PT. ALFA ADIEL

NASRUN A. SAMAUN, ST. RUSMANSYAH, ST. MT. HELMI NJIO FIKOH ALBUGIS, ST MURSIDIN ARSY
NIP. 19710415 199803 1 013 NIP. 19780807 200501 1 012 NIP. 19750303 200701 1 019 NIP. 19800119 201001 1 007 Direktur
ARAAN/PENINGKATAN JALAN DAN JEMBATAN
ENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2018
PROGRESS REPORT

03
17 SEPTEMBER S/D 17 SEPTEMBER 2018
94.00

URAIAN REALISASI
Bobot

(%)

3.17

0.97
6.46

0.73
0.03

6.60
0.87

1.03
3.99
69.61

0.07
0.01
0.48

94.00

Dibuat Oleh :
KONTRAKTOR PELAKSANA
PT. ALFA ADIEL

MURSIDIN ARSY
Direktur
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2018
PROGRESS REPORT
KEGIATAN : PENINGKATAN JALAN TERNATE 2 (SELATAN)
LOKASI : KOTA TERNATE
NO. & TGL KONTRAK : 620/1919/DPUPR/KT/2018, TANGGAL 12 APRIL 2018 No. Laporan 02
NILAI KONTRAK : Rp 3,673,353,000.00 Mulai - Sampai Tgl. 01 JUNI S/D 17 SEPTEMBER 2018
PELAKSANA : PT. ALFA ADIEL Tanggal 64.43

URAIAN KONTRAK URAIAN ADDENDUM URAIAN REALISASI


NO. URAIAN
Bobot Bobot Bobot
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
Satuan Volume Volume Volume Harga Satuan Jumlah Harga
DIV. PEKERJAAN (%) (%) (%)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 0.42 Rp 105,700,000.00 Rp 44,041,666.67 1.32

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 298.35 Rp 64,500.83 Rp 19,243,822.63 0.58 501.80 Rp 64,500.83 Rp 32,366,516.49 0.97 501.80 Rp 64,500.83 Rp 32,366,516.49 0.97
2.2.(1) Pasangan Batu dengan Mortar M3 186.15 Rp 1,251,977.05 Rp 233,055,527.74 6.98 172.39 Rp 1,251,977.05 Rp 215,829,888.61 6.46 172.39 Rp 1,251,977.05 Rp 215,829,888.61 6.46

DIVISI 3. PEKERJAAN TANAH


3.3.(1) Penyiapan Badan Jalan M2 14,900.50 Rp 1,778.60 Rp 26,427,502.10 0.79 15,678.36 Rp 1,778.60 Rp 27,885,525.60 0.84 14,618.44 Rp 1,778.60 Rp 26,000,349.49 0.78
3.1.(1a) Galian Biasa M3 - Rp - Rp - - 10.53 Rp 91,993.99 Rp 968,696.71 0.03 10.53 Rp 91,993.99 Rp 968,696.71 0.03

DIVISI 5. PERKERASAN BERBUTIR


5.1. (1) Lapis Pondasi Agregat Kelas A M3 279.07 Rp 845,618.56 Rp 235,990,155.27 7.07 256.63 Rp 845,618.56 Rp 217,010,977.63 6.50 140.65 Rp 845,618.56 Rp 118,932,271.96 3.56
5.1. (2) Lapis Pondasi Agregat Kelas B M3 - Rp - Rp - - 35.00 Rp 828,382.08 Rp 28,993,372.80 0.87 35.00 Rp 828,382.08 Rp 28,993,372.80 0.87

DIVISI 6. PERKERASAN ASPAL


6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 1,860.49 Rp 25,062.92 Rp 46,629,313.15 1.40 1,368.69 Rp 25,062.92 Rp 34,303,433.59 1.03 1,321.56 Rp 25,062.92 Rp 33,122,253.59 0.99
6.1.(2)(a) Lapis Perekat - Aspal Cair Liter 4,564.00 Rp 25,767.10 Rp 117,601,121.70 3.52 5,602.59 Rp 25,767.10 Rp 144,362,591.10 4.32 5,770.94 Rp 25,767.10 Rp 148,700,289.84 4.45
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton 1,446.79 Rp 1,765,821.81 Rp 2,554,764,507.88 76.50 1,427.86 Rp 1,765,821.81 Rp 2,521,348,118.02 75.50 844.91 Rp 1,765,821.81 Rp 1,491,960,779.57 44.68

DIVISI 7. STRUKTUR
7.1. (7) a Beton Mutu Sedang fc' = 20 Mpa M3 - Rp - Rp - - 0.96 Rp 2,339,194.65 Rp 2,245,626.86 0.07 0.96 Rp 2,339,194.65 Rp 2,245,626.86 0.07
7.3. (1) Baja Tulangan U24 Polos Kg - Rp - Rp - - 9.91 Rp 18,053.35 Rp 178,909.20 0.01 9.91 Rp 18,053.35 Rp 178,909.20 0.01
7.9. (1) Pasangan Batu M3 - Rp - Rp - - 7.72 Rp 1,063,933.20 Rp 8,218,293.35 0.25 7.72 Rp 1,063,933.20 Rp 8,218,293.35 0.25

JUMLAH HARGA FISIK Rp 3,339,411,949.97 100.00 Rp 3,339,411,949.97 100.00 Rp 2,151,558,915.15 64.43


Ppn 10 % Rp 333,941,195.00 Rp 333,941,195.00 Rp 215,155,891.51
JUMLAH TOTAL Rp 3,673,353,144.97 Rp 3,673,353,144.97 Rp 2,366,714,806.66
PEMBULATAN Rp 3,673,353,000.00 Rp 3,673,353,000.00 Rp 2,366,714,000.00

Mengetahui :
PEJABAT PEMBUAT KOMITMEN
(PPK)

NASRUN A. SAMAUN, ST.


NIP. 19710415 199803 1 013
PEKERJAAN : MALIARO - JAN

ITEM : Pas. Batu Penahan Badan Jalan


PEKERJAAN

0.20 Luasan A :
L1 = ((0,2 + 0,35)/2) x 0,35
STA 0+003 = 0.096 m2
0.35

L2 = 0,35 x 0,15
= 0.053 m2
0.15

0.35 Luasan A = 0.149 m2

Volume Pasangan Batu :


= (Luasan A + Luasan B)/2 x Pan
= ( 0.149 +
0.50
= 7.9819 m3
Luasan B :
STA 0+012 L3 = ((0,5 + 1)/2) x 1,5
= 1.125 m2
L4 = 1 x 0,5
1.50

= 0.5 m2
Luasan B = 1.625 m2
0.50

1.00

Galian
Tinggi = (0,35+1)/2) x (1,5+0,35)/2)x 9
4.101
angan Batu :
n A + Luasan B)/2 x Panjang
1.625 / 2) X 9
m3