Professional Documents
Culture Documents
Hitungan Pengaspalan JLN Lingk. Kel Ngade
Hitungan Pengaspalan JLN Lingk. Kel Ngade
ITEM
: PENYIAPAN BADAN JALAN
PEKERJAAN
LEBAR VOLUME
LEBAR
PANJANG
NO. STA RATA-RATA
(M) PANJANG X LEBAR X TEBAL
(M)
(M)
SEGMEN 1
1 0 + 000 5.50
25.00 4.67 25 M1 X 4.67 M1 = 116.63 M2
2 0 + 25 3.83
25.00 3.69 25 M1 X 3.69 M1 = 92.25
3 0 + 50 3.55
25.00 3.55 25 M1 X 3.55 M1 = 88.75 M2
4 0 + 75 3.55
25.00 3.45 25 M1 X 3.45 M1 = 86.25
5 0 + 100 3.35
23.00 3.58 23 M1 X 3.58 M1 = 82.23
6 0 + 123 3.80
6.00 3.83 6 M1 X 3.83 M1 = 22.95
7 0 + 129 3.85
7.80 3.75 8 M1 X 3.75 M1 = 29.25
8 0 + 136.8 3.65
SEGMEN 2
1 0 + 000 4.65
2 0 + 9.7 3.65
VOLUME 372.43 M3
BACK UP DATA
ITEM
: LAPIS PONDASI BAWAH DENGAN TELFORD
PEKERJAAN
LEBAR
LEBAR VOLUME
PANJANG RATA-RATA
NO. STA
(M) PANJANG X LEBAR
(M)
(M)
SEGMEN 1
1 0 + 000 5.00
25.00 4.29 25 M1 X 4.29 M1 = 107.25 M2
2 0 + 25 3.58
25.00 3.44 25 M1 X 3.44 M1 = 86.00 M2
3 0 + 50 3.30
25.00 3.30 25 M1 X 3.30 M1 = 82.50 M2
4 0 + 75 3.30
25.00 3.40 25 M1 X 3.40 M1 = 85.00 M2
5 0 + 100 3.50
23.00 3.53 23 M1 X 3.53 M1 = 81.08 M2
6 0 + 123 3.55
6.00 3.58 6 M1 X 3.58 M1 = 21.45 M2
7 0 + 129 3.60
7.80 3.50 8 M1 X 3.50 M1 = 27.30 M2
8 0 + 136.8 3.40
SEGMEN 2
1 0 + 000 4.40
9.70 3.85 10 M1 X 3.85 M1 = 37.35 M2
2 0 + 9.7 3.30
0 + 150 3.50
VOLUME = 527.92 M2
BACK UP DATA
ITEM
PEKERJAAN : LAPIS PENETRASI MACADAM
LEBAR
VOLUME
LEBAR TEBAL
PANJANG
NO. STA RATA-RATA
(M) PANJANG X LEBAR X TEBAL
(M) (M)
(M)
SEGMEN 1
1 0 + 000 4.80
25.00 4.10 0.05 102 M2 X 0.05 M1 = 5.13 M3
2 0 + 25 3.40
25.00 3.25 0.05 81 M2 X 0.05 M1 = 4.06 M3
3 0 + 50 3.10
25.00 3.10 0.05 78 M2 X 0.05 M1 = 3.88 M3
4 0 + 75 3.10
25.00 3.23 0.05 81 M2 X 0.05 M1 = 4.03 M3
5 0 + 100 3.35
23.00 3.38 0.05 78 M2 X 0.05 M1 = 3.88 M3
6 0 + 123 3.40
6.00 3.40 0.05 20 M2 X 0.05 M1 = 1.02 M3
7 0 + 129 3.40
7.80 3.35 0.05 26 M2 X 0.05 M1 = 1.31 M3
8 0 + 136.8 3.30
SEGMEN 2
1 0 + 000 4.40
9.70 3.85 0.05 37 M2 X 0.05 M1 = 1.87 M3
2 0 + 9.7 3.30
VOLUME : 25.17 M3
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE
TAHUN ANGGARAN 2022
Laporan Kemajuan Pekerjaan
PEKERJAAN : #REF!
NO & TGL. KONTRAK : 600/1938/DPUPR/KT/2022 & 6 JULI 2022 TANGGAL : 16 AGUSTUS 2022
TAHUN ANGGARAN : 2022 PROGGRES PEKERJAAN : #REF! %
#REF!
1 #REF! 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
4 #REF! 168.35 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! 88.80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
6 #REF! 18.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 Penyiapan Badan Jalan 1000 M2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
8 #REF! 220.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
9 #REF! 718.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10 #REF! 3,708.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
11 #REF! 661.50 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
12 #REF! 3.10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 #REF! 190.14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
14 #REF! 10.07 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1 2 3 4 5 6 7 12 13 14 15
###
1 #REF! Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### m2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### m2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### - #REF!
### - #REF!
1 ### Liter #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! m3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### - #REF!
### - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! - #REF!
- #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
- #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
WAKTU PELAKSANAAN
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT KET.
(Rp) (%) MEI-JUNI 22 JUNI-JULI 22 JULI-AGUSTUS 22 AGUSTUS-SEPTEMBER 22
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 HR
1.2 Mobilisasi #REF! #REF! 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
Manajemen dan Keselamatan Lalu Lintas #REF! #REF! 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Keselamatan dan Kesehatan Kerja #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
DIVISI 7. STRUKTUR
7.1. (7) a Beton Struktur, fc' 20 Mpa #REF! #REF! #REF! #REF! #REF! #REF!
7.3. (1) Baja Tulangan Polos-BjTP 280 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Baja Tulangan Sirip-BjTS 420A #REF! #REF! 1.54 1.54 1.54 1.54
7.9. (1) Pasangan Batu #REF! #REF! 5.00 17.20 #REF!
Sambungan Siar Muai Tipe Modular (Baja Siku) Lebar 70.70.7 #REF! #REF! #REF!
Landasan Elastomerik Karet Alam Berlapis Baja Ukuran 200 mm X 200 mm X 20 mm #REF! #REF! #REF!
Pengecatan pada Elemen Sandaran dan/atau Pagar Pengaman (Gruard Rail) 80 #REF! #REF! #REF!
Mikron
A. RENCANA KEMAJUAN PEKERJAAN 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1.00 0.00 0.00
B. RENCANA KUMULATIF PEKERJAAN 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Mengetahui :
Mengetahui : Disetujui :
PEJABAT PELAKSANA TEKNIS KEGIATAN DIREKSI LAPANGAN DIREKSI LAPANGAN
(PPTK)
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 60,000,000.00 60,000,000.00 2.22 1.00 60,000,000.00 2.22
Manajemen dan Keselamatan Lalu Lintas LS 1.00 14,823,225.00 14,823,225.00 0.55 1.00 14,823,225.00 0.55
Keselamatan dan Kesehatan Kerja LS 1.00 12,340,000.00 12,340,000.00 0.46 1.00 12,340,000.00 0.46
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air M3 194.25 52,523.95 10,202,777.29 0.38 60.66 3,186,102.8 133.59 7,016,674.48 0.26
Pasangan Batu dengan Mortar M3 117.00 1,598,834.65 187,063,654.05 6.91 69.45 111,039,066.4 47.55 76,024,587.61 2.81
DIVISI 7. STRUKTUR
Beton strukur, fc’20 MPa M3 - 1,958,200.00 - - 0.87 1,711,466.80 0.874 1,711,466.80 0.06
Baja Tulangan Polos-BjTP 280 Kg - 17,300.00 - - 83.88 1,451,089.40 83.88 1,451,089.40 0.05
Pasangan Batu M3 117.50 1,233,087.55 144,887,787.13 5.35 116.50 143,654,699.58 234.00 288,542,486.70 10.65
TUBO P 7
L 1.3
Te 0.2
BESI 150 PER M3
VOL
BETON 1.82 M3
SEKOT BESI 273 KG
PAS.BATU P 50
Ti 0.8
L 0,20+0,40/2 0.3
VOL
PAS.BT 12.00 M3
BUKU HARIAN STANDAR
NO. TUGAS / JABATAN CACAH (Org) LOKASI NO. JENIS JAM LOKASI KODE KET.
KONTRAKTOR
KONSULTAN SUPERVISI
PEMIMPIN PROGRAM
ATASAN LANGSUNG
ATASAN ……………………………
………………………… TAMU
KET.
KET.
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
SET
UNIT
UNIT
UNIT
UNIT
BUKU HARIAN STANDAR
NO. TUGAS / JABATAN CACAH (Org) LOKASI NO. JENIS JAM LOKASI KODE KET.
KONTRAKTOR
KONSULTAN SUPERVISI
PEMIMPIN PROGRAM
ATASAN LANGSUNG
ATASAN ……………………………
………………………… TAMU
KET.
KET.
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
SET
UNIT
UNIT
UNIT
UNIT
MONTLY REPORT
(Laporan Bulanan)
1 2 3 4 5 6 7 12 13 14 15
DIVISI 1. UMUM
1 #REF! Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 ### Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 ### Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### m2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### m2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
1 ### Liter #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 ### m3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- #REF!
### - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
No. Uraian Pekerjaan Volume Satuan (Rp.) Harga Satuan (Rp.) Jumlah Harga Bobot ( % )
Jumlah Harga Bobot
Volume (Rp.) (%)
1 2 3 4 5 6 7 8 9 10
DIVISI 1. UMUM
Manajemen dan Keselamatan Lalu Lintas 1.00 LS Rp 14,823,225.00 Rp 14,823,225.00 0.55 0.65 Rp 9,635,096 0.35
Keselamatan dan Kesehatan Kerja 1.00 LS Rp 12,340,000.00 Rp 12,340,000.00 0.46 0.65 Rp 8,021,000 0.29
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 37.90 M3 Rp 52,523.95 Rp 1,990,657.70 0.07 133.590 Rp 7,016,674 0.26
2.2.(1) Pasangan Batu dengan Mortar 35.50 M3 Rp 1,598,834.65 Rp 56,758,630.07 2.10 35.500 Rp 56,758,630 2.07
3.3.(1) Galian Biasa 179.70 M3 Rp 57,951.87 Rp 10,413,951.04 0.38 179.70 Rp 10,413,951 0.38
Penyiapan Badan Jalan 2,275.00 M2 Rp 13,981.02 Rp 31,806,820.50 1.17 2166.80 Rp 30,294,074 1.10
5.1. (1) Lapis Pondasi Agregat Kelas A 216.00 M2 Rp 701,008.11 Rp 151,417,751.76 5.59 152.48 Rp 106,889,717 3.89
Lapis Pondasi Agregat Kelas B 261.00 M2 Rp 442,502.80 Rp 115,493,230.80 4.26 141.70 Rp 62,700,711 2.28
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair/Emuls 1,728.00 Liter Rp 18,272.90 Rp 31,575,571.20 1.17 928.64 Rp 16,968,873 0.62
6.1.(2)(a) Lapis Perekat - Aspal Cair/Emulsi 3,884.29 Liter Rp 20,237.38 Rp 78,607,839.66 2.90 1199.68 Rp 24,278,304 0.88
6.3.(4a) Lataston Lapis Fondasi (HRS - Base) 989.94 Ton Rp 1,869,927.47 Rp 1,851,113,917.51 68.35 343.35 Rp 642,032,467 23.38
DIVISI 7. STRUKTUR
Beton Siklop, fc’15 Mpa 0.874 M3 Rp 1,404,700.00 Rp 1,227,707.80 0.05 0.874 Rp 1,227,708 0.04
Baja Tulangan Polos-BjTP 280 83.878 Kg Rp 23,900.00 Rp 2,004,684.20 0.07 83.878 Rp 2,004,684 0.07
PPN 10 % Rp 274,578,677.72
DIBULATKAN Rp 3,020,365,000.00
Bulan
Mengetahui : Disetujui :
RIO PICAL SUBUH, ST FIKOH ALBUGIS, ST ARYANI JATININGSIH, ST YUNI KARTIKA, SS ADAM MARSAOLY
NIP. NIP. NIP. 19960124 201902 2 003 NPTT : Direktur
Laporan Kemajuan Pekerjaan
1 2 3 4 5 6 7 8 9 10
DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS Rp 60,000,000.00 Rp 60,000,000.00 2.22 0.65 Rp 39,000,000 1.44
1.8 Manajemen dan Keselamatan Lalu Lintas 1.00 LS Rp 14,823,225.00 Rp 14,823,225.00 0.55 0.65 Rp 9,635,096 0.36
1.19 Keselamatan dan Kesehatan Kerja 1.00 LS Rp 12,340,000.00 Rp 12,340,000.00 0.46 0.65 Rp 8,021,000 0.30
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 133.59 M3 Rp 52,523.95 Rp 7,016,674.48 0.26 108.790 Rp 5,714,081 0.21
2.2.(1) Pasangan Batu dengan Mortar 47.55 M3 Rp 1,598,834.65 Rp 76,024,587.61 2.81 39.286 Rp 62,811,898 2.32
DIVISI 7. STRUKTUR
Beton strukur, fc’20 Mpa 0.874 M3 Rp 1,958,200.00 Rp 1,711,466.80 0.06 0.874 Rp 1,711,467 0.06
Baja Tulangan Polos-BjTP 280 83.878 Kg Rp 17,300.00 Rp 1,451,089.40 0.05 83.878 Rp 1,451,089 0.05
Pasangan Batu 234.00 M3 Rp 1,233,087.55 Rp 288,542,486.70 10.65 112.18 Rp 138,333,002 5.11
Mengetahui :
Ir. ISNAINY P. SIRADJU, M,Sc RIO PICAL SUBUH, ST FIKOH ALBUGIS, ST ARYANI JATININGSIH, ST YUNI KARTIKA, SS ADAM MARSAOLY
NIP. 19620512 199303 1 007 NIP. 19860705 200903 1 002 NIP. 19800119 201001 1 007 NIP. 19960124 201902 2 003 NPTT : 2020 646 Direktur
Laporan Kemajuan Pekerjaan
DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS Rp 60,000,000.00 Rp 60,000,000.00 2.22 0.80 Rp 48,000,000 1.77
1.8 Manajemen dan Keselamatan Lalu Lintas 1.00 LS Rp 14,823,225.00 Rp 14,823,225.00 0.55 0.80 Rp 11,858,580 0.44
1.19 Keselamatan dan Kesehatan Kerja 1.00 LS Rp 12,340,000.00 Rp 12,340,000.00 0.46 0.80 Rp 9,872,000 0.36
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 133.59 M3 Rp 52,523.95 Rp 7,016,674.48 0.26 133.59 Rp 7,016,674 0.26
2.2.(1) Pasangan Batu dengan Mortar 47.55 M3 Rp 1,598,834.65 Rp 76,024,587.61 2.81 39.99 Rp 63,937,398 2.36
Ir. ISNAINY P. SIRADJU, M,Sc RUSMANSYAH, ST.,MT FIKOH ALBUGIS, ST ARYANI JATININGSIH, ST YUNI KARTIKA, SS ADAM MARSAOLY
NIP. 19620512 199303 1 007 NIP. 19720908 200112 1 003 NIP. 19800119 201001 1 007 NIP. 19960124 201902 2 003 NPTT : 2020 646 Direktur
GALIAN SALURAN
SEGMEN I SEGMEN II
STA GAMBAR PANJANG LEBAR TINGGI VOLUME STA GAMBAR PANJANG LEBAR TINGGI VOLUME
0+000 0 0.8 1 0+000 0 1 1.3
20 17.5
0+025 25 0.8 1 0+025 25 0.7 1
20 8.75
0+050 25 0.8 1 0+050 25 0.7 0.5
20 2.5
0+075 25 0.8 1 0+060 10 0.5 0.5
20.04
0+091,7 16.7 0.8 1.5 TOTAL 28.75 TOTAL VOLUME
= 133.59
GALIAN SALURAN
TOTAL 80.04 SEGMEN III
TOTAL 24.8
GALIAN BIASA
SEGMEN I (MOYA)
AKE
312 3.5 1092.00
BOOCA
KEDATON
75 3 225.00
KECIL
TOTAL 2391.80
743.76
PASANGAN BATU
SEGMEN I (MOYA)
LEBAR TINGGI
LUASAN
STA GAMBAR PANJANG LUASAN Volume
Atas 1 Atas 2 Bawah Atas Bawah RATA-RATA
0+000 0.3 0.8 1 1.41 0.6 1.3755 1.5 0.5 0.25 2.25 2 1.414214
25 1.73125 43.28125
0+025 0.3 0.8 1 2.34 0.8 2.087 2.4 0.5 0.25 5.76 5.51 2.347339
25 1.701 42.525
0+050 0.3 0.8 1 1.3 0.6 1.315 1.4 0.5 0.25 1.96 1.71 1.30767
22 1.199 26.378
0+072 0.3 0.8 1 1.06 0.5 1.083 1.18 0.5 0.25 1.3924 1.1424 1.068831
TOTAL 112.18425
LEBAR LUASAN
STA GAMBAR PANJANG TINGGI LUASAN RATA- Volume
Atas 1 Atas 2 RATA
0+000 0.3 0.8 1.7 0.935 Vtotal = 234.792
25 1.2925 32.3125
0+025 0.3 0.8 3 1.65
25 1.485 37.125
0+050 0.3 0.8 2.4 1.32
25 1.2925 32.3125
0+075 0.3 0.8 2.3 1.265
27 0.7725 20.8575
0+102 0.3 0.4 0.8 0.28
LEBAR TINGGI
STA GAMBAR PANJANG LUASAN LUASAN VOLUME
LUAR DALAM LUAR DALAM
0+000 0.72 0.42 0.58 0.43 0.237
50 0.27375 13.6875
0+050 0.73 0.43 0.82 0.67 0.3105
5.1 0.381 1.9431
0+55,1 1.01 0.71 1.15 1 0.4515
TOTAL 15.6306
TOTAL 8.265
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2019
PROGRESS REPORT
DIVISI 1. UMUM
1.2 Mobilisasi
LS 1.00 Rp 34,635,000.00
Rp 34,635,000.00 Rp 3,463,500.00 38,098,500.00 0.81 1.00 Rp 34,635,000.00 Rp 34,635,000.00 Rp 3,463,500.00 Rp 38,098,500.00 0.81
1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.00 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 12,100,000.00 0.26 1.0 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26
DIVISI 2. DRAINASE
6.6.(1) M3 693.64 Rp 2,719,730.76 Rp 1,886,514,044.37 Rp 188,651,404.44 2,075,165,448.80 44.05 673.64 Rp 2,719,731 Rp 1,832,119,429.17 Rp 183,211,942.92 Rp 2,015,331,372.08 42.78
Lapis Permukaan Penetrasi Macadam
DIVISI 7. STRUKTUR
JUMLAH TOTAL Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 Rp 100.00 Rp 4,212,252,806.90 Rp 421,225,280.69 Rp 4,633,478,087.59 98.35
PEMBULATAN Rp 4,711,086,000.00
Mengetahui :
Diperiksa Oleh : Dibuat Oleh :
Disetujui : KONSULTAN SUPERVISI
Mengetahui : Mengetahui : KONTRAKTOR PELAKSANA
PEJABAT PEMBUAT KOMITMEN DIREKSI LAPANGAN CV. MEGACOPOLE RAYA
PEJABAT PELAKSANA TEKNIS KEGIATAN CV. TUANANE JAYA
(PPK) (PPTK)
DIVISI 1. UMUM
1.2 Mobilisasi
LS 1.00 Rp 34,635,000.00
Rp 34,635,000.00 Rp 3,463,500.00 38,098,500.00 0.81 0.60 Rp 34,635,000.00 Rp 20,781,000.00 Rp 2,078,100.00 Rp 22,859,100.00 0.49
1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.00 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 12,100,000.00 0.26 1.0 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26
DIVISI 2. DRAINASE
6.6.(1) M3 693.64 Rp 2,719,730.76 Rp 1,886,514,044.37 Rp 188,651,404.44 2,075,165,448.80 44.05 593.64 Rp 2,719,731 Rp 1,614,540,968.37 Rp 161,454,096.84 Rp 1,775,995,065.20 37.70
Lapis Permukaan Penetrasi Macadam
DIVISI 7. STRUKTUR
JUMLAH TOTAL Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 Rp 100.00 Rp 3,642,217,368.90 Rp 364,221,736.89 Rp 4,006,439,105.79 85.04
PEMBULATAN Rp 4,711,086,000.00
Mengetahui :
Diperiksa Oleh :
Disetujui : KONSULTAN SUPERVISI Dibuat Oleh :
Mengetahui : Mengetahui : KONTRAKTOR PELAKSANA
PEJABAT PEMBUAT KOMITMEN DIREKSI LAPANGAN CV. MEGACOPOLE RAYA
PEJABAT PELAKSANA TEKNIS KEGIATAN CV. TUANANE JAYA
(PPK) (PPTK)
DIVISI 1. UMUM
1.2 Mobilisasi
LS 1.00 Rp 34,635,000.00 Rp 34,635,000.00 Rp 3,463,500.00 Rp 38,098,500.00 0.81 1.00 Rp 34,635,000.00
Rp 34,635,000.00 Rp 3,463,500.00 38,098,500.00 0.81 0.30 Rp 34,635,000.00 Rp 10,390,500.00 Rp 1,039,050.00 Rp 11,429,550.00 0.24
1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.00 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26 1.00 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 12,100,000.00 0.26 1.0 Rp 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26
DIVISI 2. DRAINASE
6.6.(1) M3 658.00 Rp 2,719,731 Rp 1,789,582,840.08 Rp 178,958,284.01 Rp 1,968,541,124.09 41.79 693.64 Rp 2,719,730.76 Rp 1,886,514,044.37 Rp 188,651,404.44 2,075,165,448.80 44.05 160 Rp 2,719,731 Rp 435,156,921.60 Rp 43,515,692.16 Rp 478,672,613.76 10.16
Lapis Permukaan Penetrasi Macadam
DIVISI 7. STRUKTUR
JUMLAH TOTAL Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 100.00 Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 Rp 100.00 Rp 1,408,108,380.81 Rp 140,810,838.08 Rp 1,548,919,218.89 32.88
DIVISI 1. UMUM
1.2 Mobilisasi
LS 1.00 Rp 34,635,000.00 Rp 34,635,000.00 0.81 0.25 Rp 34,635,000.00 Rp 8,658,750.00 0.20
1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.0 Rp 11,000,000.00 Rp 11,000,000.00 0.26 1.0 Rp 11,000,000.00 Rp 11,000,000.00 0.26
DIVISI 2. DRAINASE -
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 - - - - 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 298.35 Rp 64,500.83 Rp 19,243,822.63 0.58 203.45 13,122,693.86 - - 501.80 Rp 64,500.83 Rp 32,366,516.49 0.97
2.2.(1) Pasangan Batu dengan Mortar M3 186.15 Rp 1,251,977.05 Rp 233,055,527.74 6.98 - - 13.76 17,225,639.13 172.39 Rp 1,251,977.05 Rp 215,829,888.61 6.46
DIVISI 7. STRUKTUR
7.1. (7) a Beton Mutu Sedang fc' = 20 Mpa M3 - Rp - Rp - - 0.96 2,245,626.86 - - 0.96 Rp 2,339,194.65 Rp 2,245,626.86 0.07
7.3. (1) Baja Tulangan U24 Polos Kg - Rp - Rp - - 9.91 178,909.20 - - 9.91 Rp 18,053.35 Rp 178,909.20 0.01
7.9. (1) Pasangan Batu M3 - Rp - Rp - - 7.72 8,218,293.35 - - 7.72 Rp 1,063,933.20 Rp 8,218,293.35 0.25
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 34,635,000.00 Rp 34,635,000.00 Rp 3,463,500.00 Rp 38,098,500.00 0.81 - - - - 1.00 34,635,000.00 Rp 34,635,000.00 Rp 3,463,500.00 Rp 38,098,500.00 0.81
1.8 Manajemen dan Keselamatan Lalu Lintas LS 1.00 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26 - - - - 1.00 11,000,000.00 Rp 11,000,000.00 Rp 1,100,000.00 Rp 12,100,000.00 0.26
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 104.00 83,675.00 Rp 8,702,200.00 Rp 870,220.00 Rp 9,572,420.00 0.20 - - - - 104.00 83,675.00 Rp 8,702,200.00 Rp 870,220.00 Rp 9,572,420.00 0.20
2.2.(1) Pasangan Batu dengan Mortar M3 50.00 1,456,790.25 Rp 72,839,512.50 Rp 7,283,951.25 Rp 80,123,463.75 1.70 - - - - 50.00 1,456,790.25 Rp 72,839,512.50 Rp 7,283,951.25 Rp 80,123,463.75 1.70
Rp -
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 148.00 117,754.90 Rp 17,427,725.20 Rp 1,742,772.52 Rp 19,170,497.72 0.41 148.67 19,257,283.08 296.67 117,754.90 Rp 34,934,346.18 Rp 3,493,434.62 Rp 38,427,780.80 0.82
3.2.(1a) Timbunan Biasa dari sumber galian M3 320.00 259,956.99 Rp 83,186,236.80 Rp 8,318,623.68 Rp 91,504,860.48 1.94 421.79 120,611,984.69 - - 741.79 259,956.99 Rp 192,833,495.61 Rp 19,283,349.56 Rp 212,116,845.17 4.50
3.3.(1) Penyiapan Badan Jalan M2 9,016.00 534.00 Rp 4,814,544.00 Rp 481,454.40 Rp 5,295,998.40 0.11 1,273.50 748,053.27 7,742.50 534.00 Rp 4,134,495.58 Rp 413,449.56 Rp 4,547,945.13 0.10
DIVISI 7. STRUKTUR
7.3 (1) Baja Tulangan U 24 Polos Kg 1,740.00 16,900.00 Rp 29,406,000.00 Rp 2,940,600.00 Rp 32,346,600.00 0.69 456.62 8,488,565.80 2,196.62 16,900.00 Rp 37,122,878.00 Rp 3,712,287.80 Rp 40,835,165.80 0.87
7.9.(1)
Pasangan Batu M3 236.00 1,502,895.36 Rp 354,683,304.96 Rp 35,468,330.50 Rp 390,151,635.46 8.28 109.80 181,519,701.58 - - 345.80 1,502,895.36 Rp 519,701,215.49 Rp 51,970,121.55 Rp 571,671,337.04 12.13
7.10.(2)
Pasangan Batu Kosong M3 486.00 648,945.00 Rp 315,387,270.00 Rp 31,538,727.00 Rp 346,925,997.00 7.36 - - - - 486.00 648,945.00 Rp 315,387,270.00 Rp 31,538,727.00 Rp 346,925,997.00 7.36
JUMLAH HARGA FISIK Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 100.00 442,948,187.84 442,948,187.84 Rp - Rp 4,282,806,103.50 Rp 428,280,610.35 Rp 4,711,086,713.85 100.00
Ppn 10 % Rp 428,280,610.35 Rp 428,280,610.35
JUMLAH TOTAL Rp 4,711,086,713.85 Rp 4,711,086,713.85
PEMBULATAN Rp 4,711,086,000.00 Rp 4,711,086,000.00
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 1.00 Rp 105,700,000.00 Rp 105,700,000.00
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 298.35 Rp 64,500.83 Rp 19,243,822.63 0.58 501.80 Rp 64,500.83 Rp 32,366,516.49 0.97 501.80 Rp 64,500.83 Rp 32,366,516.49
2.2.(1) Pasangan Batu dengan Mortar M3 186.15 Rp 1,251,977.05 Rp 233,055,527.74 6.98 172.39 Rp 1,251,977.05 Rp 215,829,888.61 6.46 172.39 Rp 1,251,977.05 Rp 215,829,888.61
DIVISI 7. STRUKTUR
7.1. (7) a Beton Mutu Sedang fc' = 20 Mpa M3 - Rp - Rp - - 0.96 Rp 2,339,194.65 Rp 2,245,626.86 0.07 0.96 Rp 2,339,194.65 Rp 2,245,626.86
7.3. (1) Baja Tulangan U24 Polos Kg - Rp - Rp - - 9.91 Rp 18,053.35 Rp 178,909.20 0.01 9.91 Rp 18,053.35 Rp 178,909.20
7.9. (1) Pasangan Batu M3 - Rp - Rp - - 7.72 Rp 1,063,933.20 Rp 8,218,293.35 0.25 14.95 Rp 1,063,933.20 Rp 15,905,801.34
NASRUN A. SAMAUN, ST. RUSMANSYAH, ST. MT. HELMI NJIO FIKOH ALBUGIS, ST MURSIDIN ARSY
NIP. 19710415 199803 1 013 NIP. 19780807 200501 1 012 NIP. 19750303 200701 1 019 NIP. 19800119 201001 1 007 Direktur
ARAAN/PENINGKATAN JALAN DAN JEMBATAN
ENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2018
PROGRESS REPORT
03
17 SEPTEMBER S/D 17 SEPTEMBER 2018
94.00
URAIAN REALISASI
Bobot
(%)
3.17
0.97
6.46
0.73
0.03
6.60
0.87
1.03
3.99
69.61
0.07
0.01
0.48
94.00
Dibuat Oleh :
KONTRAKTOR PELAKSANA
PT. ALFA ADIEL
MURSIDIN ARSY
Direktur
PROGRAM PEMELIHARAAN/PENINGKATAN JALAN DAN JEMBATAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TERNATE TAHUN ANGGARAN 2018
PROGRESS REPORT
KEGIATAN : PENINGKATAN JALAN TERNATE 2 (SELATAN)
LOKASI : KOTA TERNATE
NO. & TGL KONTRAK : 620/1919/DPUPR/KT/2018, TANGGAL 12 APRIL 2018 No. Laporan 02
NILAI KONTRAK : Rp 3,673,353,000.00 Mulai - Sampai Tgl. 01 JUNI S/D 17 SEPTEMBER 2018
PELAKSANA : PT. ALFA ADIEL Tanggal 64.43
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 1.00 Rp 105,700,000.00 Rp 105,700,000.00 3.17 0.42 Rp 105,700,000.00 Rp 44,041,666.67 1.32
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 298.35 Rp 64,500.83 Rp 19,243,822.63 0.58 501.80 Rp 64,500.83 Rp 32,366,516.49 0.97 501.80 Rp 64,500.83 Rp 32,366,516.49 0.97
2.2.(1) Pasangan Batu dengan Mortar M3 186.15 Rp 1,251,977.05 Rp 233,055,527.74 6.98 172.39 Rp 1,251,977.05 Rp 215,829,888.61 6.46 172.39 Rp 1,251,977.05 Rp 215,829,888.61 6.46
DIVISI 7. STRUKTUR
7.1. (7) a Beton Mutu Sedang fc' = 20 Mpa M3 - Rp - Rp - - 0.96 Rp 2,339,194.65 Rp 2,245,626.86 0.07 0.96 Rp 2,339,194.65 Rp 2,245,626.86 0.07
7.3. (1) Baja Tulangan U24 Polos Kg - Rp - Rp - - 9.91 Rp 18,053.35 Rp 178,909.20 0.01 9.91 Rp 18,053.35 Rp 178,909.20 0.01
7.9. (1) Pasangan Batu M3 - Rp - Rp - - 7.72 Rp 1,063,933.20 Rp 8,218,293.35 0.25 7.72 Rp 1,063,933.20 Rp 8,218,293.35 0.25
Mengetahui :
PEJABAT PEMBUAT KOMITMEN
(PPK)
0.20 Luasan A :
L1 = ((0,2 + 0,35)/2) x 0,35
STA 0+003 = 0.096 m2
0.35
L2 = 0,35 x 0,15
= 0.053 m2
0.15
= 0.5 m2
Luasan B = 1.625 m2
0.50
1.00
Galian
Tinggi = (0,35+1)/2) x (1,5+0,35)/2)x 9
4.101
angan Batu :
n A + Luasan B)/2 x Panjang
1.625 / 2) X 9
m3