Burayu TVET
Summary of BOQ
No} Ttems Unit Amount
afaccessiste TOILET Birr
2|septic Tank
3)RC elevated water tank slab Birr
al Walkway Bir
5|Ramps Bir
46|Signage Bice
TOTAL Amount) Birr
REBATE!
Total Amount After Rebate,
VAT 15% Birr
‘GRAND TOTAL|Birr ayNo
SUMMARY OF TOILET( Burayu TVET)
SUB-STRUCTURE,
IEXCAVATION & EARTH WORKS
CONCRETE WORKS
MASONRY WORKS
SUPER-STRUCTURE
CONCRETE WORK
[ROOFING
METAL WORK
FLOORING:
PLASTERING WORKS
PAINTING WORK
CERAMIC WORK
SANITARY INSTALLATION
CEILING WORK
ELECTRICAL INSTALLATION
RAMP WORKS
[Metal work (Signage Pole)
Signage Plate
TOTAL|BILL OF QUANTITY
Toilet (Burayu TVET)
1reM DESCRIPTION unirlory __|Rare [AMOUNT
[A. SUB-STRUCTURE,
EXCAVATION & EARTH WORKS
TOIfExcavate for site clearing to a depth of 20cm to] B85
remove to soil and cut trees
02 [Bulk excavation in ordinery soil not exceeding m | 2034
[700mm from NGL,
1.05] Trench Excavation up 0 depth of 1.1Smbelow NGL | m3 | 29380)
T.04|Back fil wih non expansive material & compact i] Ta
Hayets not exceeding 200m thickness.
1/)3|Selected Fill under hard-core to maintain the desired] 338]
Hevel with selected borrowed material and compact in
hayers not exceeding 200mm. |
1-06]Cart away surplus excavated material to a distance noi] 49.76
exceeding 2kms
1.07}200mm. thick sound basaltic or equivalent stone hard-| Ba
core finished and blinded with crushed stone.
TOTAL CARRIED TO SUMMARY.
2.CONCRETE WORKS
2.0i[50mm thick lean concrete in C-5 with minimum]
cement content of 150kg/m3 of conerete under
a) footing pad om
byzrade beam o
JeyTrench Masonary wall m= ad
Ja) 130mm ick ground Moor slab ree sas
22]Reinforeed concrete in class C-25 (with a 28-day]
150mm cube crushing strength of 25MPa), cast into
ommworks and vibrated around rod. reinforcement
bars.(tormwork & reinforeement bars are measured
seperately.) in: "Zype of cement to be ordinary
JPorttand cement (OPC)"
a) footing pad =
b) foundation colon =
fe) grade beam mi | 14625
JL 50mm thick ground floor slab m | _13.125
2.03) Sawn zigha wood form work for
fa) footing pad me
b) foundation column m
Je) grade beam om 115] |
a) ground Moor slab = \ z
204|Reinforcement stesl bars according to structural RQ 7
arawing. Price includes eutting, bending, placing in
position and tying wires
a) dia, S&mm deformed bar, cfe 200mm spacing for] ke
stab and grade beam 91.34
b) dia. 12mm deformed bar for grade beam ig | 82.59
TOTAL CARRIED TO SUMMARY.[3. MASONRY WORKS
301
[500mm thick Stone masonry foundation wall bedded
jin cement mortar (1:3) in full joints
72
TOTAL CARRIED TO SUMMARY.
[B. SUPER-STRUCTURE
1. CONCRETE WORKS.
Tor
Reinforced concrete in class C25 (with a 28ahy|
150mm cube crushing strength of 25MPa), eas imo
Jommwvorks and vibrated around rod. reinforcement
bars.( formwork & reinforcement bars are measured
separately.) in: "Type of cement to be ardinary
Portland cement (OPC)"
fa) Elevation column
1.043
b) Top tie beam
0.793|
fe) Lintel Beam
oa
102
[Sawn zigba wood form work for:
la) Elevation column
16.80
[b) Top tie beam
12.80
fe) Lintel Beam
1.56|
103
[Reinforcement steel bars according 10 structural
ldrawing. Price includes cutting, bending, placing in
position and tying wires
a) dia, Simm deformed bar
kg
50.54]
[b) dia. 12mm deformed bar
re
172.36|
Tp
[HCB wall beded with 1:4 cement sand mortar
la) 200m thick external hcb wall
m2 |
5676]
[b) 15em thick internal CB wall
m2,
8.4
TOTAL CARRIED TO SUMMARY.
2.ROOFING
Supply and fix C-28 CIS sheet cluding Sem.xTem.Zigba|
|wood purine placed c/o 9 em. spacing including washers
land roof ridge cover and trss, Truss members are made
lo wood at ee spacing 100m. Roof caver includes Ridge,
Flushing, and all incidental works as shown inthe
drawing the area is measured horizontally.
21.6)
[Galvanized steel copping G-28 develengih Stem
12
[UPVC down pipe attached vo extemal wall surface with
leader straps cle 120 em, and finally painted with wo
coats of synthetic paint
9.20}
[Dito but to gutter of ize 25cm 20cm. with developmen
length of 60 em. and painted with two coats of synthetic
paint.
2
[provide and supply 0.25 tam thick 25em width Australian
facia board painted
72
TOTAL CARRIED TO SUMMARY.
(3. METAL WORK[All doors are manufactured fom LIZ 38mm profile
frames. All works should he cut and assembeled 10 sizes
Jand shapes of the door schedule upon submitting
workshop drawing by the contractor. Unit price includes
ie necessary iron monger anchorbelts cover plates
lapproved lock , doors stoppers, other necessary
Jsceessories for completing the work and one coat of
primer of antirust and two coats of synthetic paint. Al
lsceording to door and window schedule as specified
a
IMETAL DOOR
MDI Size 1000 x 210mm (21md). Where the door
handle should be fixed at 1,10m above finished floor
pes.
[Supply and Install 1]00mmn disameter wire mesh in
|window section where the mesh openining must be
vininum to prevent entrance of fie to the toilet room
Window opening Size 400 x 800mm (032m).
Pe
33
[Supply & fx dia, SOmm with 3mm thick, 650mm Tong,
land 700mm high fro finished floor surface CHS stee!
pine fixed garb bar secured tothe floor by means of
lanchoring pieces from same material inchuding all the
necessary work procedures (apply antrust, metalic paint,
lunchorage)
TOTAL CARRIED TO SUMMARY.
[4. FLOORING
[28mm thick cement sand mortar mis (1:3) sereed Finished
fine smooth to receive ceramic tile flooring. The levelness
lof the screed should be at a level of perfection to avoid
visual wave on the finished surface,
a
[Supply and fx 300%300x20mm approved rough ceramic
ite Mooring glued with approved type adhesive to cement
screed. Price shall include 4mm thick cement sereed
(1:3), Colour and quality to be approved by the Engineer.
14.04
[Supply and fi 100mm pve skining Price shall including
ai the necessary works.
19.20
TOTAL CARRIED TO SUMMARY.
|S. PLASTERING WORKS.
[Apply thtce coats of plaster in cement morar (ra) up To
ine finish to all intemal and external wall surfaces
Plastering work shall include all surface precteaning
lpeparationchiseling, polishing, job plastering, plastering
to edges and cleaning atthe end of Fshing work
15689]
32
[Rendering for external wal, Plastering work shall include
all surface pre-cleaning preparation chiseling, polishing
land cleaning tthe end of finishing work
56.76|
TOTAL CARRIED TO SUMMARY.
(6. PAINTING WORK
at
[Apply in three coats of plastic emulsion paint wo all
internal and external plastered wall surfaces, The work
shall include all’ surface pre-cleaning
preparaton,chiseling, polishing and cleaning at the end of
painting work. Color shall be decided by the consultatnt a
lscussion withthe client
149.69]
TOTAL CARRIED TO SUMMARY.
[7. CERAMIC WORK701
[Supply and lay 3 mim thick ceramie wall les of approved
lype bedded and jointed with ceramic approved adhesive
las approved by the consultant or with cement sand mortar]
(1:3)grouted at joints with white eement wash, Price shall
include 3 em thick cement mortar backing or approved
ladhesive application before laying of the ceramic,
polishing, cleaning and all other related necessary works
[Color and Size Subject to engineers approval
34.56
TOTAL CARRIED TO SUMMARY.
'8.SANITERY INSTALLATION
[SANITARY EQUIPMENT (FINTURES)
[AI fixtures which differs from that specified below i
subject to the owner's approvel, based on
Jsamples.catalogues and brochures presented by the
[Contractor. Unit Price shall inchude all the necessary
xing brackets or hooks and all the necessary assistance
civil works such as ehiseling of walls, floors, beams and
[ALL FIXTURES ARE APPROVED EUROPEAN
[BRAND
Bar
[Supply and fix RAK or equivalent hand wash basins a
[70cm height with stainless steel cold water mixer top
made of white vitreious china,complete with pedastell
stand, mixing battery plug, chrome plated chain holder, P-|
smell trap with connection pipe and with all other
lnccessary accessories
[Size = 500x400 mm
Ne.
200)
Bo
[Supply and fix RAK or equivalent wash down water
closets made of white vitreous china with plastic sat and
cover including all accessories,
No
2.00
Er]
[Supply and fix flexible water Hose pipe with all nevessary|
No
B04
[Supply and fix RAK or equivalent toilet paper holder wih
cinrome plated brass wall flanged roll with chrome plated
fastening screws and other accessories.
No
55
[Supply and fix erystal glass mirrors for toilets and wash
basins with copper back protection, size: 500/400 mm]
including chrome plated brass mitror clips with chrome
plated serews and ete. forhand wash basins,
No
2.09)
B05
[Supply and fix RAK or equivalent soap holder in whi
litecus china of size 150 x 150 mn complete with the
lnecessary fixing and other accessories for hand wash
basins
No
0.00
[WATER SUPPLY PIPELINE AND VALVES
[Cold and hot water pipes shall be PPR pipes for cold and
hot water respectively, and be fixed to slabs, walls, beams
or ete...with metal straps or similar material. Unit price
shall include all assistance civil works and necessary
ftings such as T, bends ec, according to where shown on
the drawing. All water pipes shall be tested two times the
\working pressure or 50 meters head, which ever is greater
atthe expense of the contactor.307]
[Supply and instal PPR, PN-10 pipes to lnveraal cold water]
distribution system as shown on the drawing. Compete
[vith all the necessary fittings and accessories,
Dia 1mm
mal
T7220]
88
|Supply and fix chrome service angle valves oF approved
Jsandard before hand wash basins, water closets and othe
fixtures. Complete with unions, elastic water proofing,
Ihand wheels of normal quality and with all othe]
Inecessary accessories.
Dia, 13mm
We
70.00
| WASTE, VENT AND RAIN WATER PIPES AND
[ACCESSORIES
[All domestic waste, vent and storm water pipe lines shal
be comply to BS4SH4:1983 and DIN 19331 uPVC, PN.
pipes and shall be provided with a minimum slope of
1.5%. Pipes and necessary fittings shall be standard
Jquality and be free from damage during stonge|
Jconstruction and ete. Unit price shall incinde all the
necessary assistance civil works, such as excavation
cartaway, fixing or hanging to walls, beams or slabs. et.
necessary fitings such as bends, Y, T, ete. Storm water
IPVC pipes shall resist the external’ cemperature and the|
[quality shall meet the purpose
309
[Supply and lay internal & Extemal uPVC, PN-# wastl
lnipes. according to where shown on the deawings|
[Complete wth all the necessary fittings.
ia 110 mm
243
9
[Supply and fix dia SOmm vent caps made oF uPVC at te
roof terminal of vent pips. complete with all accessories
land water proofing works
Dia. 30 rom
ar
Fix Mloor drain SOmm brass plated necessary newessories
lat oF approved standard. Price shall inelude all the
necessary civil works.
No.
2.00]
TOTAL CARRIED TO SUMMARY.
9. Ceiling, r
301
[600mm X 60mm Plastic ceiling with all nsssery fcings
17.64
TOTAL CARRIED TO SUMMARY.
110.Flectrieal Installation Works =
[All fixtures which differs from that spectived below is
subject to the owner's approval, based on
ssmples.catalogues and brochures presented by the
|Contractor. Unit Price shall include al the necessary
xing brackets or hooks and all the necessary assistance
civil works such as chiseling of wallsfloors, beams snd
et.
Tot
[Supply and Tastall Distibution Board Panels Power
JOutlets, HD Conduits and Pipes and Light Switeh Points
and also bulbs. Light switch buttons should be fixed at
1.2m height.
Ls
2.00)
TOTAL CARRIED TO SUMMARY.
[11.Ramp Works -[The ramp shall be constructed with 60% slope with a
jvidth of 2m. The ramp should also have a SOmm diameter
land 2.5mm thick handrail where the vertical posts should
Ibe fixed at each 0.9m spacing and the horizontal barat
(0.1m, 0.60m and 0.90m height from the finished floor on
both sides and it should be coated with entrust and
Jmneallic paint. The color of the handrail should contrast
visually with the wall or the ramp. Price should include
Handing at directional changes and at entrance and all the
necessary works required for accessibility.
Ls
TOTAL CARRIED TO SUMMARY.
12, SIGNAGE,
12.1 METAL WORK(Gignaze pole)
[Supply & fix dia. SOmm with 3mm thick metal pipe
Imounted on anchor with 150mm curbs at its bottom and it
is 2.5m high above the ground, (all metal surfaces should
[be coated with antirust and metallic pains)
1.00]
TOTAL CARRIED TO SUMMARY.
12.2 SIGNAGE PLATE
[Supply and fix 2 ram thick 2mm thick aluminium clad
sign board plate on which each letters should be Tem in
[UY print and on one signage pole one plate is mounted,
|And the plate is contrasted with blue background surface
and white letters,
No.
12a
[Supply and fix 2 mm thiek aluminium cladding sign board
plate on whieh each letter should be 7em writen in UV
print and cach plate is mounted on the side of the door.
‘And each plate is contrasted with blue background surface
land whit letters. sex and intermational disability symbol
is printed on it (UV prim) As per Engineer's approval
No
Taa3
[Supply and fx 2 vam thick aluminium cladding ign board
[plate on which each letters showld be Sem and each plate
is mounted onthe middel front side ofthe toilet as per the
lengince's order. And each plate is conteasted with blue
background surface and white letters. And the sign of
donor's logo with proper weed is printed omit, All eters
nd logo has to be printed in UV print, As per the
Engineer's approval
No.
TOTAL CARRIED TO SUMMARY.
TOTAL CARRIED TO SUMMARY.
TOTAL CARRIED TO SUMMARY.Specification & Bill of quantities for Buray:
4X4X3m size septic tank
Item Discripion Unit] Qty. | Rate ‘Amount
[ Exacavation & earth work
1 |Clear the site an average depth of 200mm, m | 2035
12 [Excavate Bulk Tor 270em depth forthe tank and
|85em thick stone masonry mt 48.80]
13 |Back fill with non expansive material & compact
in layers not exceeding 20cm thickness.
nm’ _|_ 1025
Tat |Cartaway surplus excavated material toa
Ldistance not excecding Skin from the site. im 52.85]
Total Cated 1 Summary
2. Concrete work
ZI [Reinforced Concrete class C-25, 400kgs of
Jccment /m3 of concrete filled into form work and
vibrated around steel reinforcement (Form work
land Rebar measured separately.) Rebar Grade -40
lin 50mm thick Tean eoneret under 85cm thick
Hnasomry wall and PVC pipe for sluge removal
rom toilet to sept tank m | 127
In 13em thick manhole (DemX60em) m2_|_ 1.00]
PVC Pipe for sludge removal trom Toilet room to
Septie tank based on the engineers’ approval
mt_|_ 10.00
22_ [150mm thick RC slab m3) 240
23 _[200X200mm Re grade beam mal ee
ZA |Sieel reinforcement according to suctural
[drawings including cutting, bending, tying wires
|& placing in positon
[012mm deformed bur Ke | 39685
[@smm deformed bar Kg | 21.37
Toa Carried t Summary
3, Form Wark
3.1 [350mm height &12 mm thick form work and
soffit for masonry wall, grade beam and slab with
eucalyptus and all other necessary fitings.
mn 21.44)
Toad Caried te Summary
4, Stone Masonry41
[SSem thiek at the bottom and Sam thick atthe
top hard trachytic or equivalent masonry stone
{foundation wall bedded on cement & sand mortar
Imix (1:3) ratio below ground level and apply
three coats of plaster in cement mortar (1:3) up to
ine finish to all masonry surfaces. Plastering,
\vork shall include all surface pre-cleaning,
preparation, chiseling, polishing and cleaning at
the end of finishing work.
m_|_25.50]
3 [Supply and fix a 23 (2000L1) water tank in
+ |fiberglass to be mounted on extended concrete
|columns with all the necessary pumps, pipes for
the water supply line, fittings, and accessories all
lo the approved standacd,
No_|_ 1.00]
“Total Canied to Summary
Total Carried to Summary
SACO
820 ueSpecification & Bill of quantities for Bur:
a TVET
1.2*1.2m size elevated water tank slab at 3.5m height above NGL,
Ttem
Discripion
Unit | Qty.
Rate
Amount
TExacwvation & earth work
TH
[Clear the site an average depth of 200mm:
12
[Excavate Bulk for 150em depth for footing pad
land footing column
[Back fill with non expansive material & compact
in layers not exceeding 20cm thickness.
[Cart away surplus excavated material to 8
distance not exceeding Skm from the site
m_|_435
Total Carried to Summa
2, Concrete work
2
[Reinforced Concrete class C-25, d00Kgs of
|cement /m3 of concrete filled into form work and
vibrated around steel reinforcement (Form work
land Rebar measured separately.) Rebar Grade -40
lin SOmm thick Tean concrete under IxIm footing
pad
22
[RC class C-25, in 1m by Tm and 0.3m depth
footing pad
2
IRC class C25, in 0.3mn0.3 and 1.5m
high footing column below NGL
m_| 0.4!
czy
IRC class C-25, in 0 3mx0.3 and 3.5m
high tanker column above NGL
m_| 036
2
IRC class C-25, in 1 2mxi.2m and 0.15m
thick stab for the tanker.
m3_| 0.22]
[Steel reinforcement according o structural
drawings including cutting, bending, tying wires
| placing in position,
[12mm deformed bar
Ke | 4267]
[idm deformed bar
Ke_| 58.08]
[8mm deformed bar
Ke | 18.96]
Total Carried to Summary
3. Form Work
3
[550mm height &12 mm thiek form work and
soffit for masonry wall, rade beam and slab with
leucalyptus and all other necessary fitings.
Toral Carried to Summary
Total Carried to SummarySUMMARY OF Walkway Burayu TVET
Description Unit
1 [Walkway to toilet
[Birr
SUB TOTAL irr aSpecification & Bill of quantities for Durayu TVET Colles
[Access route for Toilet (a 60m long by 2m width (including curb stone) RC concrete walkway with curb
stone )
Tem
Diseripion
LExacavation & earth work
(Clear the site to an average depth of 200mm
Bulk Excavation to a depth of 250mm and
{compact the natural ground (subgrade) to fill
with select material & gravel
Fill with non-expansive select material and
fcompact to maintain the desired level by
sprinkling water if itis dry in layers not
lexceeding 200mm
Fill crushed gravel (01) as a surfacing material
folinded with 00 aggregate under the concrete
slab,
[Cart away surplus excavated material to a
sistance not exceeding Skm from the site.
1
12
16
“Total Carried to Summary
2. Concrete work
Reinforced Concrete class C-25, 400kgs of
-ement /m3 of conerete filled into formwork
ind vibrated around steel reinforcement (Form
work and Rebar measured separately.)
ei
in 100mm thick ground floor slab, segment the
conerete surface at each 2m, The top surface of
he walkway should be rough to avoid a
slippery surface.
in 130mm thick and 150mm high Curb
including plastering for making a smooth
finished surface.
[Put a 50mm diameter PVG pipe under the
Icurbstone to carry the rainoff out of the
{érainpipe and out in to the ground
Steel reinforcement according to structural
{drawings including cutting, bending, tying
wires & placing in position.
2g
23
f8mm c/e 300mm deformed bar
I Total Carried to Summary
3. Form Work
3.1 |form work for Curb stone
Total Carried to Summary.
Total Summary For Walk waySUMMARY OF Ramp Burayu TVET.
Description Unit
1[Ramp 1 Birr
2|Ramp 2 Birr
3]Ramp 3 pine
SUB TOTAL ineEthiopian Center for Disability and Development (ECDD)
Specification & Bill of quantities for Burayu TVET
Rate
Qty.
[.Exacavation &
io-an average depth of 200mm
13 [Bulk Excavation with 40em depth for stone masonry
and hardcore without working spai
14 [french excavation for masonry with no working
# Ispace m3_| 077]
1.5 [Back fill with non expansive material & compact in
layers not exceeding 40cm thickness including
Jexcavation for hard-core
1.6 [250mm thick basaltic or sound approved stone Hard
core and blinded with 20mm crushed aggregate.
m | 074
17 [Fill under hard-core to maintain the desired level
vith selected borrowed material and compact in
layers not exceeding 200mm, m | 0.00
| 1.8 [Cart away surplus excavated material to a distance | ~
|not exceeding Skm from the site. m 6.34]
| Total Curried to Summary [aaaeal
L 72. Conerele work aes |e
2.1 [Reinforced Concrete class C-25, 400kgs of cement
J'm3 of conerete filled into form work and vibrated
Jaround stee! reinforcement (Form work and Rebar
Imeasured separately). Rebar Grade -40
fin 25mm thick lean eonerete C-5 concrete grade
lunder masonry : -_ 591
in: 100mm thick Ramp C-25 RC slab, The top
surface of the ramp should be rough to avoid a
m3, 1.03] jo
2.2 |Sicel reinforcement according to structural drawings|
including cutting, bending, tying wires & placing in
position.
JO%mm cle 300mm deformed bar
Total Carried to Summary
2. Form Work[400mm thick hard trachytic or equivalent masonry i
stone foundation wall bedded on cement & sand
mortar mix (1:4) ratio below ground level and Apply|
three coats of plaster in cement mortar (1:4) up to
fine finish to all internal wall surfaces. Plastering
Hvork shall include all surface pre-cleaning
lpreparation,chiscling, polishing and cleaning at the
m 1.06}
fend of finishing work
“Total Carried to Summary
5. Metal work
Provide and fix a 40mm diameter and 3mm thick
circular horizontal handrail at a height of 0.1m,
0.7m, and 0.9 mounted from the finished floor
surface level on both sides of the Ramp. It shoutd be
coated with antirust and paint it two coats of dark
Jercen metallic paint
[Provide and fix 40min diameter and Snum thick
circular vertical hand rail with a height of 0.9m from
finished floor surface and C/C 0.9m mounted on
both sides of the Ramp. It should be coated with
fantirust and paint it two coats of dark green metallic
paint.
16.69
Total Carried to Summary
Total Summary For Ramp I
Pm 1.6m Conerete ditch cover laying on a masonry at hair drying and accounting department
Item Deseripti
[Exacavation & earth work
1.1 Jelear the site to an average depth of 200mm.
Unit [_ Qty. T Rate
12 [Trench Excavation for 40em thick and 35cm depth
stone masonry with working space on both sides of
tie ramp
13 Back fill with non expansive material & compact in
layers not exceeding 40cm thickness including
Jexcavation for hard-core * | 0.09
Amount
1.4 250mm thick basaltic or sound approved stone Hard
jcore and blinded with 20mm crushed aggregate.
= im 0.29]
15 [Fill under hard-core to maintain the desired level
bith selected borrowed material and compact in
llayers not exceeding 200mm. mi 0.00]
| 1.6 |Cart away surplus excavated material to a distance
Jnot exceeding Skm from the site. m 0.00
‘Total Carried to Summary A
2. Conerete work2.1 Reinforced Concrete class C-25, 400kgs of cement
}n3 of concrete filled into form work and vibrated
Jaround stee! reinforcement (Form work and Rebar
measured separately), Rebar Grade -40
is SOmm thick Tean concrete C-5 concrete grade
mm thick Ramp C-25 RC slab. The top
surface of the ramp should be rough to avoid a
slippery surface,
[Curb stone of 120mm high and 120mm wide on
both sides of the ramp. =
2.2 [Steel reinforcement including cutting, bending, tying}
wires & placing in position. (placing horizontally
Jand vertically) for ramps and landings
8mm deformed bar, with cfc 300mm spacing
[12mm deformed bar, with ee 150mm spacing for
IRC ditch cover
Total Carried to Summary
is tk _
3.1 [30mm thick form work for Ramp and landing
|e Total Carried to Summary
4 Stone Masonry
4.1 [400mm thick hard trachytic or equivalent masonry
stone foundation wall bedded on cement & sand
mortar mix (1:4) ratio below ground level and Apply|
three coats of plaster in cement mortar (1:4) up to
fine finish to all internal wall surfaces, Plastering
jwork shall include all surface pre-cleaning
Jpreparation,chiseling, polishing and cleaning at the
lend of finishing work.
Total Caried to Summary
Total Summary For Ramp 2 -
way to I ICT Department (Ramp width=2.7m, clevation= 38em & length= 7.
[(5%) and 1-Sin Tong and 2/7 wide landing) (walkway witha lensth of 12.4 and a width of 2.7) with
oem thickness of C25.conerete lab and curb stone on bot sides of the ramp and make an opening
ae Ide a passage for water fo leave the surface of the ¥ BERD ise
Description
1Exacavation & earth work
clear the site to an average depth of 200mm
[Demolish the existing masonry ramp
Bulk Excavation to a depth of 250mm and compact
[the natural ground (subgrade) to fill with select
material & gravel
‘with non-expansive select material and compact,
to maintain the desired level by sprinkling water if it
is dry in layers not exceeding 200mm i13
in thick basaltic or sound approved stone Hard
Jcore and blinded with 20mm crushed aggregate for
the ramp and landing. 2.89
| 1.6 [Fill crushed gravel as a surfacing material blinded i
Jvith 00 aggregate under the concrete slab for the
alkeway. ort a 1.67]
[Cart away surplus excavated material to a distance
Jnot exceeding Skm from the site m_|_ 20.68}
Total Cammed to Summary
2. Conerete work
|Reinforced Concrete class C-25, 400kgs of cement
}'m3 of conerete filled into form work and vibrated
Jaround steel reinforcement (Form work and Reber
measured separately). Rebar Grade 40
concrete grade
junder masonry
i 8.20]
in 100mm thick Ramp C-25 RC slab, Segment the
-oncrete surface at each 2m, The top surface of the
ramp should be rough to avoid a slippery surface.
i 5al
orb stone of 120mm high and 120mm wide on
both sides of the ramp. i 0.62]
Sicel reinforcement including cutting, bending, tying
vires & placing in position. (placing horizontally
and vertically) for ramps and landings
J>8mm deformed bar, with c/e 300mm spacing Kg_| 161.34]
{12mm deformed bar, with cfe 150mm spacing for
RC ditch cover kg | 42.39
Total Carried to Summary,
~__ 2. Form Work
30mm thick form work for Ramp and landing
Total Carried to Summary,
4, Stone Masonry
(00mm thick hard trachytic or equivalent masonry
stone foundation wall bedded on cement & sand
mortar mix (1:4) ratio below ground level and Apply}
three coats of plaster in cement mortar (1:4) up to
inc finish 10 all internal wall surfaces. Plastering
ork shall include all surface pre-cleaning
preparation, chiseling, polishing and cleaning at the
fend of finishing work.
Tolal Carried to Summary
‘Total Summary For Ramp 3UMMARY OF SIGNAGE for Burayu TVET
|SUB-STRUCTURE
EXCAVATION & EARTH WORKS
CONCRETE WORKS
SUB-TOTAL (A)|
SUPER-STRUCTURE
METAL WORK
SIGNAGE PLATE
TOTALBILL OF QUANTITY
Signage (Buruyw TVET)
lrreM| DESCRIPTION uni] gry |_rare_[ AMounr
[A. SUB-STRUCTURE.
TEXCAVATION & EARTH WORKS
TOI] Excavate for site clearing to a depth of 20cm to remove fo) am? | 0.30
soil
1.02] Bulk excavation in ordinery soil not exceeding 1000mm|_m?_| 0.30
1.03|Selected Fill under the conerete to maintain the desired) mm? | 0.20
level with selected borrowed material and compact in layers
not exceeding 200mm,
1.04]Cart away surplus excavated material to a distance not] mq? | 036
“Jexceeding 2kms.
TOTAL CARRIED TO SUMMARY.
2. CONCRETE WORKS
2O1]50mm thick lean concrete in C-5 with minimum cement
[content of 150kg/m3 of concrete under:
a) footing pad m | O13
72.02|Reinforced concrete in class C-25 (with a 28-day 150mm
Jcube crushing strength of 25MPa), cast into formworks andl
lvibrated around rod reinforcement bars.(formwork &|
reinforcement bars are measured separately.) in: "Type of
lcement to be ordinary Portland cement (OPC)"
la) footing pad m | 010
2,03]Sawn Zigba wood form work for:
la) footing pad mm | 0.00
TOTAL CARRIED TO SUMMARY.
[B. SUPER-STRUCTURE
1. METAL WORK(Gignage pole)
TOT|Supply & fx ive poles with dia 50mm with 3mm thick metal
pine mounted on anchor with 150mm curbs a its bottom and it
is 2.5m high above the ground. (all metal surfaces should be
[coated with antirust and metalic paint) alan
TOTAL CARRIED TO SUMMARY.
2.SIGNAGE PLATE,
ZI_|Supply and fix 60x30cm and Siam thick aluminum cladding
pole mounted sign boardplate on whieh each letters should be
[7em writen in UV print. The plate shouldbe contrasted with
[bine black background surface and white letters. And the sign of
donor's logo, ECDD and symbol of accessibility should be
Jprnted on one ofthe ples as required. All letters and logo has
to be printed in UV print on both side (ace) ofthe plate. On one
|siznage pole, at least five plates supported
should mounted. No_| 25.00