You are on page 1of 20
Burayu TVET Summary of BOQ No} Ttems Unit Amount afaccessiste TOILET Birr 2|septic Tank 3)RC elevated water tank slab Birr al Walkway Bir 5|Ramps Bir 46|Signage Bice TOTAL Amount) Birr REBATE! Total Amount After Rebate, VAT 15% Birr ‘GRAND TOTAL|Birr ay No SUMMARY OF TOILET( Burayu TVET) SUB-STRUCTURE, IEXCAVATION & EARTH WORKS CONCRETE WORKS MASONRY WORKS SUPER-STRUCTURE CONCRETE WORK [ROOFING METAL WORK FLOORING: PLASTERING WORKS PAINTING WORK CERAMIC WORK SANITARY INSTALLATION CEILING WORK ELECTRICAL INSTALLATION RAMP WORKS [Metal work (Signage Pole) Signage Plate TOTAL| BILL OF QUANTITY Toilet (Burayu TVET) 1reM DESCRIPTION unirlory __|Rare [AMOUNT [A. SUB-STRUCTURE, EXCAVATION & EARTH WORKS TOIfExcavate for site clearing to a depth of 20cm to] B85 remove to soil and cut trees 02 [Bulk excavation in ordinery soil not exceeding m | 2034 [700mm from NGL, 1.05] Trench Excavation up 0 depth of 1.1Smbelow NGL | m3 | 29380) T.04|Back fil wih non expansive material & compact i] Ta Hayets not exceeding 200m thickness. 1/)3|Selected Fill under hard-core to maintain the desired] 338] Hevel with selected borrowed material and compact in hayers not exceeding 200mm. | 1-06]Cart away surplus excavated material to a distance noi] 49.76 exceeding 2kms 1.07}200mm. thick sound basaltic or equivalent stone hard-| Ba core finished and blinded with crushed stone. TOTAL CARRIED TO SUMMARY. 2.CONCRETE WORKS 2.0i[50mm thick lean concrete in C-5 with minimum] cement content of 150kg/m3 of conerete under a) footing pad om byzrade beam o JeyTrench Masonary wall m= ad Ja) 130mm ick ground Moor slab ree sas 22]Reinforeed concrete in class C-25 (with a 28-day] 150mm cube crushing strength of 25MPa), cast into ommworks and vibrated around rod. reinforcement bars.(tormwork & reinforeement bars are measured seperately.) in: "Zype of cement to be ordinary JPorttand cement (OPC)" a) footing pad = b) foundation colon = fe) grade beam mi | 14625 JL 50mm thick ground floor slab m | _13.125 2.03) Sawn zigha wood form work for fa) footing pad me b) foundation column m Je) grade beam om 115] | a) ground Moor slab = \ z 204|Reinforcement stesl bars according to structural RQ 7 arawing. Price includes eutting, bending, placing in position and tying wires a) dia, S&mm deformed bar, cfe 200mm spacing for] ke stab and grade beam 91.34 b) dia. 12mm deformed bar for grade beam ig | 82.59 TOTAL CARRIED TO SUMMARY. [3. MASONRY WORKS 301 [500mm thick Stone masonry foundation wall bedded jin cement mortar (1:3) in full joints 72 TOTAL CARRIED TO SUMMARY. [B. SUPER-STRUCTURE 1. CONCRETE WORKS. Tor Reinforced concrete in class C25 (with a 28ahy| 150mm cube crushing strength of 25MPa), eas imo Jommwvorks and vibrated around rod. reinforcement bars.( formwork & reinforcement bars are measured separately.) in: "Type of cement to be ardinary Portland cement (OPC)" fa) Elevation column 1.043 b) Top tie beam 0.793| fe) Lintel Beam oa 102 [Sawn zigba wood form work for: la) Elevation column 16.80 [b) Top tie beam 12.80 fe) Lintel Beam 1.56| 103 [Reinforcement steel bars according 10 structural ldrawing. Price includes cutting, bending, placing in position and tying wires a) dia, Simm deformed bar kg 50.54] [b) dia. 12mm deformed bar re 172.36| Tp [HCB wall beded with 1:4 cement sand mortar la) 200m thick external hcb wall m2 | 5676] [b) 15em thick internal CB wall m2, 8.4 TOTAL CARRIED TO SUMMARY. 2.ROOFING Supply and fix C-28 CIS sheet cluding Sem.xTem.Zigba| |wood purine placed c/o 9 em. spacing including washers land roof ridge cover and trss, Truss members are made lo wood at ee spacing 100m. Roof caver includes Ridge, Flushing, and all incidental works as shown inthe drawing the area is measured horizontally. 21.6) [Galvanized steel copping G-28 develengih Stem 12 [UPVC down pipe attached vo extemal wall surface with leader straps cle 120 em, and finally painted with wo coats of synthetic paint 9.20} [Dito but to gutter of ize 25cm 20cm. with developmen length of 60 em. and painted with two coats of synthetic paint. 2 [provide and supply 0.25 tam thick 25em width Australian facia board painted 72 TOTAL CARRIED TO SUMMARY. (3. METAL WORK [All doors are manufactured fom LIZ 38mm profile frames. All works should he cut and assembeled 10 sizes Jand shapes of the door schedule upon submitting workshop drawing by the contractor. Unit price includes ie necessary iron monger anchorbelts cover plates lapproved lock , doors stoppers, other necessary Jsceessories for completing the work and one coat of primer of antirust and two coats of synthetic paint. Al lsceording to door and window schedule as specified a IMETAL DOOR MDI Size 1000 x 210mm (21md). Where the door handle should be fixed at 1,10m above finished floor pes. [Supply and Install 1]00mmn disameter wire mesh in |window section where the mesh openining must be vininum to prevent entrance of fie to the toilet room Window opening Size 400 x 800mm (032m). Pe 33 [Supply & fx dia, SOmm with 3mm thick, 650mm Tong, land 700mm high fro finished floor surface CHS stee! pine fixed garb bar secured tothe floor by means of lanchoring pieces from same material inchuding all the necessary work procedures (apply antrust, metalic paint, lunchorage) TOTAL CARRIED TO SUMMARY. [4. FLOORING [28mm thick cement sand mortar mis (1:3) sereed Finished fine smooth to receive ceramic tile flooring. The levelness lof the screed should be at a level of perfection to avoid visual wave on the finished surface, a [Supply and fx 300%300x20mm approved rough ceramic ite Mooring glued with approved type adhesive to cement screed. Price shall include 4mm thick cement sereed (1:3), Colour and quality to be approved by the Engineer. 14.04 [Supply and fi 100mm pve skining Price shall including ai the necessary works. 19.20 TOTAL CARRIED TO SUMMARY. |S. PLASTERING WORKS. [Apply thtce coats of plaster in cement morar (ra) up To ine finish to all intemal and external wall surfaces Plastering work shall include all surface precteaning lpeparationchiseling, polishing, job plastering, plastering to edges and cleaning atthe end of Fshing work 15689] 32 [Rendering for external wal, Plastering work shall include all surface pre-cleaning preparation chiseling, polishing land cleaning tthe end of finishing work 56.76| TOTAL CARRIED TO SUMMARY. (6. PAINTING WORK at [Apply in three coats of plastic emulsion paint wo all internal and external plastered wall surfaces, The work shall include all’ surface pre-cleaning preparaton,chiseling, polishing and cleaning at the end of painting work. Color shall be decided by the consultatnt a lscussion withthe client 149.69] TOTAL CARRIED TO SUMMARY. [7. CERAMIC WORK 701 [Supply and lay 3 mim thick ceramie wall les of approved lype bedded and jointed with ceramic approved adhesive las approved by the consultant or with cement sand mortar] (1:3)grouted at joints with white eement wash, Price shall include 3 em thick cement mortar backing or approved ladhesive application before laying of the ceramic, polishing, cleaning and all other related necessary works [Color and Size Subject to engineers approval 34.56 TOTAL CARRIED TO SUMMARY. '8.SANITERY INSTALLATION [SANITARY EQUIPMENT (FINTURES) [AI fixtures which differs from that specified below i subject to the owner's approvel, based on Jsamples.catalogues and brochures presented by the [Contractor. Unit Price shall inchude all the necessary xing brackets or hooks and all the necessary assistance civil works such as ehiseling of walls, floors, beams and [ALL FIXTURES ARE APPROVED EUROPEAN [BRAND Bar [Supply and fix RAK or equivalent hand wash basins a [70cm height with stainless steel cold water mixer top made of white vitreious china,complete with pedastell stand, mixing battery plug, chrome plated chain holder, P-| smell trap with connection pipe and with all other lnccessary accessories [Size = 500x400 mm Ne. 200) Bo [Supply and fix RAK or equivalent wash down water closets made of white vitreous china with plastic sat and cover including all accessories, No 2.00 Er] [Supply and fix flexible water Hose pipe with all nevessary| No B04 [Supply and fix RAK or equivalent toilet paper holder wih cinrome plated brass wall flanged roll with chrome plated fastening screws and other accessories. No 55 [Supply and fix erystal glass mirrors for toilets and wash basins with copper back protection, size: 500/400 mm] including chrome plated brass mitror clips with chrome plated serews and ete. forhand wash basins, No 2.09) B05 [Supply and fix RAK or equivalent soap holder in whi litecus china of size 150 x 150 mn complete with the lnecessary fixing and other accessories for hand wash basins No 0.00 [WATER SUPPLY PIPELINE AND VALVES [Cold and hot water pipes shall be PPR pipes for cold and hot water respectively, and be fixed to slabs, walls, beams or ete...with metal straps or similar material. Unit price shall include all assistance civil works and necessary ftings such as T, bends ec, according to where shown on the drawing. All water pipes shall be tested two times the \working pressure or 50 meters head, which ever is greater atthe expense of the contactor. 307] [Supply and instal PPR, PN-10 pipes to lnveraal cold water] distribution system as shown on the drawing. Compete [vith all the necessary fittings and accessories, Dia 1mm mal T7220] 88 |Supply and fix chrome service angle valves oF approved Jsandard before hand wash basins, water closets and othe fixtures. Complete with unions, elastic water proofing, Ihand wheels of normal quality and with all othe] Inecessary accessories. Dia, 13mm We 70.00 | WASTE, VENT AND RAIN WATER PIPES AND [ACCESSORIES [All domestic waste, vent and storm water pipe lines shal be comply to BS4SH4:1983 and DIN 19331 uPVC, PN. pipes and shall be provided with a minimum slope of 1.5%. Pipes and necessary fittings shall be standard Jquality and be free from damage during stonge| Jconstruction and ete. Unit price shall incinde all the necessary assistance civil works, such as excavation cartaway, fixing or hanging to walls, beams or slabs. et. necessary fitings such as bends, Y, T, ete. Storm water IPVC pipes shall resist the external’ cemperature and the| [quality shall meet the purpose 309 [Supply and lay internal & Extemal uPVC, PN-# wastl lnipes. according to where shown on the deawings| [Complete wth all the necessary fittings. ia 110 mm 243 9 [Supply and fix dia SOmm vent caps made oF uPVC at te roof terminal of vent pips. complete with all accessories land water proofing works Dia. 30 rom ar Fix Mloor drain SOmm brass plated necessary newessories lat oF approved standard. Price shall inelude all the necessary civil works. No. 2.00] TOTAL CARRIED TO SUMMARY. 9. Ceiling, r 301 [600mm X 60mm Plastic ceiling with all nsssery fcings 17.64 TOTAL CARRIED TO SUMMARY. 110.Flectrieal Installation Works = [All fixtures which differs from that spectived below is subject to the owner's approval, based on ssmples.catalogues and brochures presented by the |Contractor. Unit Price shall include al the necessary xing brackets or hooks and all the necessary assistance civil works such as chiseling of wallsfloors, beams snd et. Tot [Supply and Tastall Distibution Board Panels Power JOutlets, HD Conduits and Pipes and Light Switeh Points and also bulbs. Light switch buttons should be fixed at 1.2m height. Ls 2.00) TOTAL CARRIED TO SUMMARY. [11.Ramp Works - [The ramp shall be constructed with 60% slope with a jvidth of 2m. The ramp should also have a SOmm diameter land 2.5mm thick handrail where the vertical posts should Ibe fixed at each 0.9m spacing and the horizontal barat (0.1m, 0.60m and 0.90m height from the finished floor on both sides and it should be coated with entrust and Jmneallic paint. The color of the handrail should contrast visually with the wall or the ramp. Price should include Handing at directional changes and at entrance and all the necessary works required for accessibility. Ls TOTAL CARRIED TO SUMMARY. 12, SIGNAGE, 12.1 METAL WORK(Gignaze pole) [Supply & fix dia. SOmm with 3mm thick metal pipe Imounted on anchor with 150mm curbs at its bottom and it is 2.5m high above the ground, (all metal surfaces should [be coated with antirust and metallic pains) 1.00] TOTAL CARRIED TO SUMMARY. 12.2 SIGNAGE PLATE [Supply and fix 2 ram thick 2mm thick aluminium clad sign board plate on which each letters should be Tem in [UY print and on one signage pole one plate is mounted, |And the plate is contrasted with blue background surface and white letters, No. 12a [Supply and fix 2 mm thiek aluminium cladding sign board plate on whieh each letter should be 7em writen in UV print and cach plate is mounted on the side of the door. ‘And each plate is contrasted with blue background surface land whit letters. sex and intermational disability symbol is printed on it (UV prim) As per Engineer's approval No Taa3 [Supply and fx 2 vam thick aluminium cladding ign board [plate on which each letters showld be Sem and each plate is mounted onthe middel front side ofthe toilet as per the lengince's order. And each plate is conteasted with blue background surface and white letters. And the sign of donor's logo with proper weed is printed omit, All eters nd logo has to be printed in UV print, As per the Engineer's approval No. TOTAL CARRIED TO SUMMARY. TOTAL CARRIED TO SUMMARY. TOTAL CARRIED TO SUMMARY. Specification & Bill of quantities for Buray: 4X4X3m size septic tank Item Discripion Unit] Qty. | Rate ‘Amount [ Exacavation & earth work 1 |Clear the site an average depth of 200mm, m | 2035 12 [Excavate Bulk Tor 270em depth forthe tank and |85em thick stone masonry mt 48.80] 13 |Back fill with non expansive material & compact in layers not exceeding 20cm thickness. nm’ _|_ 1025 Tat |Cartaway surplus excavated material toa Ldistance not excecding Skin from the site. im 52.85] Total Cated 1 Summary 2. Concrete work ZI [Reinforced Concrete class C-25, 400kgs of Jccment /m3 of concrete filled into form work and vibrated around steel reinforcement (Form work land Rebar measured separately.) Rebar Grade -40 lin 50mm thick Tean eoneret under 85cm thick Hnasomry wall and PVC pipe for sluge removal rom toilet to sept tank m | 127 In 13em thick manhole (DemX60em) m2_|_ 1.00] PVC Pipe for sludge removal trom Toilet room to Septie tank based on the engineers’ approval mt_|_ 10.00 22_ [150mm thick RC slab m3) 240 23 _[200X200mm Re grade beam mal ee ZA |Sieel reinforcement according to suctural [drawings including cutting, bending, tying wires |& placing in positon [012mm deformed bur Ke | 39685 [@smm deformed bar Kg | 21.37 Toa Carried t Summary 3, Form Wark 3.1 [350mm height &12 mm thick form work and soffit for masonry wall, grade beam and slab with eucalyptus and all other necessary fitings. mn 21.44) Toad Caried te Summary 4, Stone Masonry 41 [SSem thiek at the bottom and Sam thick atthe top hard trachytic or equivalent masonry stone {foundation wall bedded on cement & sand mortar Imix (1:3) ratio below ground level and apply three coats of plaster in cement mortar (1:3) up to ine finish to all masonry surfaces. Plastering, \vork shall include all surface pre-cleaning, preparation, chiseling, polishing and cleaning at the end of finishing work. m_|_25.50] 3 [Supply and fix a 23 (2000L1) water tank in + |fiberglass to be mounted on extended concrete |columns with all the necessary pumps, pipes for the water supply line, fittings, and accessories all lo the approved standacd, No_|_ 1.00] “Total Canied to Summary Total Carried to Summary SACO 820 ue Specification & Bill of quantities for Bur: a TVET 1.2*1.2m size elevated water tank slab at 3.5m height above NGL, Ttem Discripion Unit | Qty. Rate Amount TExacwvation & earth work TH [Clear the site an average depth of 200mm: 12 [Excavate Bulk for 150em depth for footing pad land footing column [Back fill with non expansive material & compact in layers not exceeding 20cm thickness. [Cart away surplus excavated material to 8 distance not exceeding Skm from the site m_|_435 Total Carried to Summa 2, Concrete work 2 [Reinforced Concrete class C-25, d00Kgs of |cement /m3 of concrete filled into form work and vibrated around steel reinforcement (Form work land Rebar measured separately.) Rebar Grade -40 lin SOmm thick Tean concrete under IxIm footing pad 22 [RC class C-25, in 1m by Tm and 0.3m depth footing pad 2 IRC class C25, in 0.3mn0.3 and 1.5m high footing column below NGL m_| 0.4! czy IRC class C-25, in 0 3mx0.3 and 3.5m high tanker column above NGL m_| 036 2 IRC class C-25, in 1 2mxi.2m and 0.15m thick stab for the tanker. m3_| 0.22] [Steel reinforcement according o structural drawings including cutting, bending, tying wires | placing in position, [12mm deformed bar Ke | 4267] [idm deformed bar Ke_| 58.08] [8mm deformed bar Ke | 18.96] Total Carried to Summary 3. Form Work 3 [550mm height &12 mm thiek form work and soffit for masonry wall, rade beam and slab with leucalyptus and all other necessary fitings. Toral Carried to Summary Total Carried to Summary SUMMARY OF Walkway Burayu TVET Description Unit 1 [Walkway to toilet [Birr SUB TOTAL irr a Specification & Bill of quantities for Durayu TVET Colles [Access route for Toilet (a 60m long by 2m width (including curb stone) RC concrete walkway with curb stone ) Tem Diseripion LExacavation & earth work (Clear the site to an average depth of 200mm Bulk Excavation to a depth of 250mm and {compact the natural ground (subgrade) to fill with select material & gravel Fill with non-expansive select material and fcompact to maintain the desired level by sprinkling water if itis dry in layers not lexceeding 200mm Fill crushed gravel (01) as a surfacing material folinded with 00 aggregate under the concrete slab, [Cart away surplus excavated material to a sistance not exceeding Skm from the site. 1 12 16 “Total Carried to Summary 2. Concrete work Reinforced Concrete class C-25, 400kgs of -ement /m3 of conerete filled into formwork ind vibrated around steel reinforcement (Form work and Rebar measured separately.) ei in 100mm thick ground floor slab, segment the conerete surface at each 2m, The top surface of he walkway should be rough to avoid a slippery surface. in 130mm thick and 150mm high Curb including plastering for making a smooth finished surface. [Put a 50mm diameter PVG pipe under the Icurbstone to carry the rainoff out of the {érainpipe and out in to the ground Steel reinforcement according to structural {drawings including cutting, bending, tying wires & placing in position. 2g 23 f8mm c/e 300mm deformed bar I Total Carried to Summary 3. Form Work 3.1 |form work for Curb stone Total Carried to Summary. Total Summary For Walk way SUMMARY OF Ramp Burayu TVET. Description Unit 1[Ramp 1 Birr 2|Ramp 2 Birr 3]Ramp 3 pine SUB TOTAL ine Ethiopian Center for Disability and Development (ECDD) Specification & Bill of quantities for Burayu TVET Rate Qty. [.Exacavation & io-an average depth of 200mm 13 [Bulk Excavation with 40em depth for stone masonry and hardcore without working spai 14 [french excavation for masonry with no working # Ispace m3_| 077] 1.5 [Back fill with non expansive material & compact in layers not exceeding 40cm thickness including Jexcavation for hard-core 1.6 [250mm thick basaltic or sound approved stone Hard core and blinded with 20mm crushed aggregate. m | 074 17 [Fill under hard-core to maintain the desired level vith selected borrowed material and compact in layers not exceeding 200mm, m | 0.00 | 1.8 [Cart away surplus excavated material to a distance | ~ |not exceeding Skm from the site. m 6.34] | Total Curried to Summary [aaaeal L 72. Conerele work aes |e 2.1 [Reinforced Concrete class C-25, 400kgs of cement J'm3 of conerete filled into form work and vibrated Jaround stee! reinforcement (Form work and Rebar Imeasured separately). Rebar Grade -40 fin 25mm thick lean eonerete C-5 concrete grade lunder masonry : -_ 591 in: 100mm thick Ramp C-25 RC slab, The top surface of the ramp should be rough to avoid a m3, 1.03] jo 2.2 |Sicel reinforcement according to structural drawings| including cutting, bending, tying wires & placing in position. JO%mm cle 300mm deformed bar Total Carried to Summary 2. Form Work [400mm thick hard trachytic or equivalent masonry i stone foundation wall bedded on cement & sand mortar mix (1:4) ratio below ground level and Apply| three coats of plaster in cement mortar (1:4) up to fine finish to all internal wall surfaces. Plastering Hvork shall include all surface pre-cleaning lpreparation,chiscling, polishing and cleaning at the m 1.06} fend of finishing work “Total Carried to Summary 5. Metal work Provide and fix a 40mm diameter and 3mm thick circular horizontal handrail at a height of 0.1m, 0.7m, and 0.9 mounted from the finished floor surface level on both sides of the Ramp. It shoutd be coated with antirust and paint it two coats of dark Jercen metallic paint [Provide and fix 40min diameter and Snum thick circular vertical hand rail with a height of 0.9m from finished floor surface and C/C 0.9m mounted on both sides of the Ramp. It should be coated with fantirust and paint it two coats of dark green metallic paint. 16.69 Total Carried to Summary Total Summary For Ramp I Pm 1.6m Conerete ditch cover laying on a masonry at hair drying and accounting department Item Deseripti [Exacavation & earth work 1.1 Jelear the site to an average depth of 200mm. Unit [_ Qty. T Rate 12 [Trench Excavation for 40em thick and 35cm depth stone masonry with working space on both sides of tie ramp 13 Back fill with non expansive material & compact in layers not exceeding 40cm thickness including Jexcavation for hard-core * | 0.09 Amount 1.4 250mm thick basaltic or sound approved stone Hard jcore and blinded with 20mm crushed aggregate. = im 0.29] 15 [Fill under hard-core to maintain the desired level bith selected borrowed material and compact in llayers not exceeding 200mm. mi 0.00] | 1.6 |Cart away surplus excavated material to a distance Jnot exceeding Skm from the site. m 0.00 ‘Total Carried to Summary A 2. Conerete work 2.1 Reinforced Concrete class C-25, 400kgs of cement }n3 of concrete filled into form work and vibrated Jaround stee! reinforcement (Form work and Rebar measured separately), Rebar Grade -40 is SOmm thick Tean concrete C-5 concrete grade mm thick Ramp C-25 RC slab. The top surface of the ramp should be rough to avoid a slippery surface, [Curb stone of 120mm high and 120mm wide on both sides of the ramp. = 2.2 [Steel reinforcement including cutting, bending, tying} wires & placing in position. (placing horizontally Jand vertically) for ramps and landings 8mm deformed bar, with cfc 300mm spacing [12mm deformed bar, with ee 150mm spacing for IRC ditch cover Total Carried to Summary is tk _ 3.1 [30mm thick form work for Ramp and landing |e Total Carried to Summary 4 Stone Masonry 4.1 [400mm thick hard trachytic or equivalent masonry stone foundation wall bedded on cement & sand mortar mix (1:4) ratio below ground level and Apply| three coats of plaster in cement mortar (1:4) up to fine finish to all internal wall surfaces, Plastering jwork shall include all surface pre-cleaning Jpreparation,chiseling, polishing and cleaning at the lend of finishing work. Total Caried to Summary Total Summary For Ramp 2 - way to I ICT Department (Ramp width=2.7m, clevation= 38em & length= 7. [(5%) and 1-Sin Tong and 2/7 wide landing) (walkway witha lensth of 12.4 and a width of 2.7) with oem thickness of C25.conerete lab and curb stone on bot sides of the ramp and make an opening ae Ide a passage for water fo leave the surface of the ¥ BERD ise Description 1Exacavation & earth work clear the site to an average depth of 200mm [Demolish the existing masonry ramp Bulk Excavation to a depth of 250mm and compact [the natural ground (subgrade) to fill with select material & gravel ‘with non-expansive select material and compact, to maintain the desired level by sprinkling water if it is dry in layers not exceeding 200mm i 13 in thick basaltic or sound approved stone Hard Jcore and blinded with 20mm crushed aggregate for the ramp and landing. 2.89 | 1.6 [Fill crushed gravel as a surfacing material blinded i Jvith 00 aggregate under the concrete slab for the alkeway. ort a 1.67] [Cart away surplus excavated material to a distance Jnot exceeding Skm from the site m_|_ 20.68} Total Cammed to Summary 2. Conerete work |Reinforced Concrete class C-25, 400kgs of cement }'m3 of conerete filled into form work and vibrated Jaround steel reinforcement (Form work and Reber measured separately). Rebar Grade 40 concrete grade junder masonry i 8.20] in 100mm thick Ramp C-25 RC slab, Segment the -oncrete surface at each 2m, The top surface of the ramp should be rough to avoid a slippery surface. i 5al orb stone of 120mm high and 120mm wide on both sides of the ramp. i 0.62] Sicel reinforcement including cutting, bending, tying vires & placing in position. (placing horizontally and vertically) for ramps and landings J>8mm deformed bar, with c/e 300mm spacing Kg_| 161.34] {12mm deformed bar, with cfe 150mm spacing for RC ditch cover kg | 42.39 Total Carried to Summary, ~__ 2. Form Work 30mm thick form work for Ramp and landing Total Carried to Summary, 4, Stone Masonry (00mm thick hard trachytic or equivalent masonry stone foundation wall bedded on cement & sand mortar mix (1:4) ratio below ground level and Apply} three coats of plaster in cement mortar (1:4) up to inc finish 10 all internal wall surfaces. Plastering ork shall include all surface pre-cleaning preparation, chiseling, polishing and cleaning at the fend of finishing work. Tolal Carried to Summary ‘Total Summary For Ramp 3 UMMARY OF SIGNAGE for Burayu TVET |SUB-STRUCTURE EXCAVATION & EARTH WORKS CONCRETE WORKS SUB-TOTAL (A)| SUPER-STRUCTURE METAL WORK SIGNAGE PLATE TOTAL BILL OF QUANTITY Signage (Buruyw TVET) lrreM| DESCRIPTION uni] gry |_rare_[ AMounr [A. SUB-STRUCTURE. TEXCAVATION & EARTH WORKS TOI] Excavate for site clearing to a depth of 20cm to remove fo) am? | 0.30 soil 1.02] Bulk excavation in ordinery soil not exceeding 1000mm|_m?_| 0.30 1.03|Selected Fill under the conerete to maintain the desired) mm? | 0.20 level with selected borrowed material and compact in layers not exceeding 200mm, 1.04]Cart away surplus excavated material to a distance not] mq? | 036 “Jexceeding 2kms. TOTAL CARRIED TO SUMMARY. 2. CONCRETE WORKS 2O1]50mm thick lean concrete in C-5 with minimum cement [content of 150kg/m3 of concrete under: a) footing pad m | O13 72.02|Reinforced concrete in class C-25 (with a 28-day 150mm Jcube crushing strength of 25MPa), cast into formworks andl lvibrated around rod reinforcement bars.(formwork &| reinforcement bars are measured separately.) in: "Type of lcement to be ordinary Portland cement (OPC)" la) footing pad m | 010 2,03]Sawn Zigba wood form work for: la) footing pad mm | 0.00 TOTAL CARRIED TO SUMMARY. [B. SUPER-STRUCTURE 1. METAL WORK(Gignage pole) TOT|Supply & fx ive poles with dia 50mm with 3mm thick metal pine mounted on anchor with 150mm curbs a its bottom and it is 2.5m high above the ground. (all metal surfaces should be [coated with antirust and metalic paint) alan TOTAL CARRIED TO SUMMARY. 2.SIGNAGE PLATE, ZI_|Supply and fix 60x30cm and Siam thick aluminum cladding pole mounted sign boardplate on whieh each letters should be [7em writen in UV print. The plate shouldbe contrasted with [bine black background surface and white letters. And the sign of donor's logo, ECDD and symbol of accessibility should be Jprnted on one ofthe ples as required. All letters and logo has to be printed in UV print on both side (ace) ofthe plate. On one |siznage pole, at least five plates supported should mounted. No_| 25.00 op

You might also like