2. GENERAL CHECKS:
S No Description Result
1 Check visual inspection of LV PANEL, ACB, MCCB, and other equipment. OK
2 Check any damages, painting and identification label, etc. OK
3 Check the tightness of Cable and Equipment. OK
4 Check tag name of cable. NA
5 Check ACB Cable tightness. OK
6 Verify ACB Rating and panel details as per load schedule. OK
7 Check visual inspection of CT wiring. OK
8 Check the healthiness of the auxiliary fuse. OK
9 Check secondary injection ACB trip test. OK
10 Check torque tightness of Busbar & ACB. OK
Current setting(A) Time setting (Sec) Pickup current in(A) Trip time in(sec)
1 0.5
2. Secondary Injection:
Injected Primary Actual Voltage in
Reading
Voltage (V) Voltmeter (V)
25% 125 128
50% 250 249
75% 375 375
100% 500 500
% Error = [(Actual Reading – Expected Reading) / Expected Reading] * 100
Make ELMEX
Type EPM72X72
Accuracy Class 1.5
Tested by Witness by/Approved By Witness by/Approved By
Company GENFOCUS GOLDEN FALCON SEA WORLD
Name ABHILASH CHANDRAN
Signature
Date 16-03-2024
GENFOCU
S
CT Ratio 2000/5 A
Full Scale Reading 0-4000 A
Serial No. R-ɸ 2105030155 Y-ɸ 2105030129 B-ɸ 2105030121
2. Secondary Injection:
Injected Secondary Expected Primary Measured Primary Current in
Reading
Current in (A) Current in (A) Ammeter (A)
R 1.25 500 503
20% 1.25
Y 500 503
B 1.25 500 502
R 2.50 1000 1003
40% 2.50
Y 1000 1004
B 2.50 1000 1004
R 3.75 1500 1500
80% 3.75
Y 1500 1500
B 3.75 1500 1500
R 5.0 2000 2000
100% 5.0 2000
Y 2000
B 5.0 2000 2000
% Error = [(Actual Reading – Expected Reading) / Expected Reading] * 100
2. AMMETER CALIBRATION
3. VOLTMETER CALIBRATION
REMARK: NIL
3. EQUIPMENT DETAILS: