Professional Documents
Culture Documents
Site Acceptance Test Report For Sub Main Distribution Board Project: Sea World Abudhabi Solar PV Project
Site Acceptance Test Report For Sub Main Distribution Board Project: Sea World Abudhabi Solar PV Project
2. GENERAL CHECKS:
S No Description Result
1 Check visual inspection of LV PANEL, ACB and other equipment. OK
2 Check any damages, painting and identification label, etc. OK
3 Check the tightness of Cable and Equipment. OK
4 Check tag name of cable. NA
5 Check ACB Cable tightness. OK
6 Verify ACB Rating and panel details as per load schedule. OK
7 Check visual inspection of CT wiring. OK
8 Check the healthiness of the auxiliary fuse. OK
9 Check secondary injection ACB trip test. OK
10 Check torque tightness of Busbar & ACB. OK
1 R-ɸ 15 OK
2 Y- ɸ 15 OK
3 B-ɸ 12 OK
1. REMARK: NIL
2. EQUIPMENT DETAILS: