NU sucess.
MUKHTAR
Banu Mukhtar Products Pvt) Limited
‘Quality Control / inspection Scheme
A1. Equipment inspection
Subject = =Paie Method | Frequency”
| 1.1 Testing And Measuring Equipment
‘Weigh scales Correct Functioning & | All equipments are duly _] Calibration by third party
Calibration Weights Accuracy. calibrated. Once a year
Height gauge
Compressive strength
testing Machine
Al.2 Storage & Production Equipment
1| Storage
Cement Cylos Ensure Cement Inspect top of Cement - Weekly
Quality cylo for rain water
protection /shelter
Water Reservoir
Check for dissolved - Weekly
Solids and salts
contamination
| 2 | batching Equipment
~ {Cleaning
Cement Scale ‘Check- Daily
Mixer cleaning at the end of
sai desl
| | Calibration ~ monthly
“ He et aesBlock Machine Proper functioning | Filler boxinspection weekly
and maintenance |
| Lubrication of Vibrator | -100 hourly
| bearings and allied
equipments. 100 hourly
Cleaning of Material |
Hopper -At Shiftend
Cleaning of Filler box | - At Shift end
Cleaning of Aggitator
~Weekly
Maintenance /Inspection i
of complete block —Weekly, i
machine.
Mixers Correct functioning | Cleaning “At shift end
Cleaning & Check for
Wear Check for wear of -Weekly
Peddles and liners etc | -At shift end
Check Gear box cil level i
‘Moulds Cleanliness and Visual inspection Daily i
condition
Mould cleaning /Washing
inspection
n_check for
wear and tolerance
Each time mould is removed
from the machine
25,000 Cycles and
subsequent 5,000 cyles till
50,000 Cycles. Then inspection
after subsequent 1000 cyclesA2.0 Material Inspection
Subject ‘Aim ‘Method Frequency
UnScreened Sand _| Practice grading Query Inspection First delivery from
ew source and then
‘on month interval.
In case of doubt -
weekly
-Each Dumper truck
Particle Grading Sieve Analysis
(We have our own Sand
Screening Plant and
Crusher Plant) Daily one sample
| Screened Sand & Screening of impurities or | Sieve Analysis
Aggregate Contamination Daily checte
- At Crusher
| ~At Aggregate bins
Visual check for foreign
material
€g;Clay,coal organic shal
e, Daily Check
marlJignite and rubish | -
Cement Conformity with inspection Each delivery |
manufacturer's supplied
certification
Water Water reservoir check | -pH testing Daily
weekly TDS. Not more | - TDS testing weekly
Wehave direct city | Water should be free of _| then 250 TDS | water testing by
| water Source. contamination/excess | Wateris treated with | Third party -Monthly
salts and dissolved solids | necessary chemical
dozing.‘A3.0 Production Process inspection
Subject
Aim
Method
Frequency
T] Mocture
Composition
Conformity of
composition by weight.
“Visual
Aggregate is weighted
through calibrated belt
time scale.
Cement is weighted
through calibrated
scale
‘Water dozing done by
accurate flow mater
This report confirms
the mix design.
-Wash gradation of
green product is done
to conform the
aggregate mix design
“Daily
“Daily
3 | Fresh Concrete
Concrete Mixing
Visual Checks
Every batchiis checked
by Mixer operator
4 | Production
Each steel board with
green product
thoroughly examined
for proper filling ,
weight and dimension
by machine operator.
No product is booked
unless it meets the
defined parameters of
weight and height
Non conformance
products rejected
through dumper.
Ifthe product do not
mect the required
Parameter for 5
consecutive production
plate, stop the
machine and check for
- Machine
setting
Parameters
- Mould
setting, mix
design ion is
Daily at production
start up.‘A4.0 Product inspection
‘Subject Aim Method Frequency
2 | visual Aspects Alluniis should be | Esch paving Glock gi fpreaigEREST Tine
No overall dimensions | free of cracks or —_| checked visually at dry _| inspection
(width, height & other defects such | side on the casting bed/
length) shall differ by | as cracking or running conveyor by
more then+-2mm | flaking. dedicated ac
inspector.
Sample of 20 blocks
picked by Qc inspector
and all 20 samples
analized in lab for
dimensions and visual
defects.
2 | Shape and dimensions
To check dimension
of concrete block
Permissible Deviations
Lengtn +-2mm,
Width +2 mm
Thickness + 2mm
Every 21 plate is
Hourly sample of two
blocks taken from the
machine and
dimensions checked
with the caliper
(Sis ae
checked for thickness | with in 0.1mm |
by height gauge | accuracy. |
3 Water Absorption _| Water absorption Three Blocks per five
should not be more
than 6%
day production
4 | Compressive strength
test
(in house)
For Hollow Blocks
For solid Blocks
For Kerb Stone
Tdayage -— N/mm?
14 days age — N/mm?
28 days age —N/mm?
32 samples per
production day drawn
8 samples are tested for
each 7,14 and 28 days
strength
8 samples retained ( for
third party test) if
required.
5 | Measurement of
Abrasion resistant.
Third party certificatian
3 samples /1000 pes
6 | Measurement of
Compressive and
tensile splitting
strength.
| Test carried out at t
party lab
‘A per Ann-F of
8S 6717 &C 140-118
3 samples / 10000 pesA5.0 Marking, Storage Delivery
Sale/Marketing
Delivery challan and
Gate pass made for
each delivery.
manufacturing
-Delivery Order
- Delivery
Chalian
-Gate Pass
1 | Marking -Manufacturer’s | QC inspector At delivery.
Name & Logo | inspect each and
“Product Name every product
-Pallet No pallet before
Date of | dispatch.
manufacture Mould ID end no
“Mould 1D of cycles done
Date of mould and Mould wear
commencement | tolerances are
Actual tolerances | recorded in
quality records
[2 | storage Productsis placed | Nonconforming | Each day
| date wise in stock | productisset | Production
yard aside and samples kept in
| Product declared in | marked Lab and tested on
| conformance when | accordingly. 7, 14,and 28 days
passed the 7 and 14 | age.
doys test aid azged Regular feature
accordingly
3 | Delivery Product dispatched | Age of the ‘At each dispatch
as per delivery product is
orders received calculated from
from the date of