Republic of the Philippines
Department of Health
Central Luzon Center for Health Development
February 7, 2023
JOEL M. BUTARAN
General Manager
BANCAL CONSTRUCTION AND SUPPLY
M252 Sagapan Zone V, Iba, Zambales
SUBJECT: Notice for Expiry of Contract Completion
Dear Engr. Butaran
‘This refers to your contract: P027 — HFEP 2023 CONSTRUCTION OF DIETARY BUILDING
OF CANDELARIA DISTRICT HOSPITAL (P 10,000,000.00) under the General
Appropriations Act 2023 for Health Facilities Enhancement Program with final warning, which
was received by your office.
Please be informed that the completion date of the said project has already expired on January 10,
2024. According to the latest accomplishment report as of February 7, 2024, you have accumulated
a total of 33% of the work accomplished.
In line with this, due to failure to satisfactorily complete the works under the contract within the
specified contract duration, you are liable for liquidated damages upon processing your payment.
Furthermore, a joint inspection with you and your representative on February 23, 2024, is requested
to conduct the final site inspection and prepare the team for the move out at Candelaria District
Hospital.
Your immediate compliance on this matter is hereby sought.
Very truly yours,
CORAZON#FLORES, MD, MPH, CESO IV
Director’
Maalaga St, Diosdade Macapagal Government Center, Bray. M
eino. 045) 861-8426 to 29 website: http://centalluzon doh. gov-ph | emall address: 'd@centralzon.doh.gov.phProject / Contract Title
Location
‘Contractor
Date Started
Contract Duration
Contract Amount
Revised Contract Amount
Republic of the Philippines
Department of Health
Centra! Luzon Center for Health Development
INSPECTION REPORT
As of: February 7, 2024
027 — HFEP 2023 CONSTRUCTION OF DIETARY
BUILDING OF CANDELARIA DISTRICT HOSPITAL.
: Candelaria, Zambales
BANCAL CONSTRUCTION AND SUPPLY
2 June 14, 2023
210 C.D (w/ additional Works)
P.9.894,.499 93
: P 10,000,000.00
Thereby certify that 33.00% of work has been accomplished and the above accomplishment
was done in accordance to the approved plans and specification and requirement thereof.
Appraised / Inspected by:
Checked by:
JOHN va ASENOR, CE SHIRES. SALAS, CE
HFEP-En; Engineer Ill
Recommending Approval: Approved by:
Laila bonaheUCABNAN, MDMPH CORA ‘LORES, MD, MPH, CESO IV
OIC Director Ill Director IV
DOH-CLCHD-LHSD-SOP-02-00-FormBRev.0Republic of the Piippines
DEPARTMENT OF HEALTH
CENTRAL LUZON CENTER FOR HEALTH DEVELOPMENT
‘STATEMENT OF WORK ACCOMPLISHMENT
‘Date: Fabruary 7.2024)
Project PO27 - HFEP 2023 Construction of Dietary Building of Candelaria Dstt Hospital
Location: [Candelaria, Zambales
Project Started [June 14,2023
Project Duration: [aioe
%
Item of Work Original Contract] W'S" compnchmaent % | Wale of Accomplishment |/SCOTt| Remarks
to Date
Previous [To Date| Previous To Date
GENERAL REQURENENTS P__asreso]| 0mm] 02TH] 021) FBS 713025 | 000% | ovaoing
iL EARTH WORKS P_siganist| ste] ___szul 2.208] 30280030] 22268496 70G0m | on-going
it RENFORONG STEEL P_1.165,66685 T1705] 936%] 9:6) 335 7484] 90573486 @000% | on-going
SCAFFOLDING AND FORMWORKS Pp sarea7o| 5340] 320%] S07) 32050087 50752305] 95.00% | ongoing
lv CONCRETE WORKS: P___rigeaat | 772%] 465%] 5.024) 265,16965] 601,767 2] @500% | on-going
Iv. MASONRY WORKS: P__eriiraza] 871m] 3484] 697%) 34648933] 69650866 80.00% | on-going
WiTWLES WORKS P_ 600386 15] 630%] 000%] 000% 5 Tatyet state]
[vi STEEL WORKS P_s72.06804 | — 972%] 000%] 389%) 5 SBRTZ| WOR | ongoing
K.CARPENTRY WORKS Preaaeoa7 | 762%) 000%] 0.00% atyet stare]
[cPANTING WORKS P_Wraant | 27eR] 000m] 000 rotyet sre]
ha, ROOFING WORKS Pseasezes] 521%] 000%] 0008 atyet tare]
bat DOORS AND WINDOWS: P7ee848 70] 740%] 000%] 000% 5 tet stro
a PLUMBING Pp sra7gs] 513%] 077%] 005% TemOT 7 Biz] 100% | ongoing
hav. ELECTRICAL WORKS P16 38257 | 12.56%) 185%] 006%) 165.307 39 6.7691 050% | _ongong
MECHANICAL WORKS P__seas7ic2| 560%] 000%] 000%) 5 5 ratyet tre]
[S®L2 NOBLIZATIONDEMOBILZATION P__soowoo| oso] 025%) 025% mow BHO | SOOHR | ongoing
[GRAND TOTAL P10,000,000.00 | 100.0%| 27.0% | 380%] P_2678,708.87 | P 3,511,148.16
| hereby certify that 23.00% of work has been accomplished as of February 7, 2024 and thatthe above work accomplishment
was done in accordance with the Approved Plans and Specfcation
propre cance
son a pCiRSEROR, cE Feeroaas,ce
re? pdr Ever
ae opr
Landed Aewashne- 065 conazqupfbees, mo, MPH, ESO WV
O-Orecori eet
cantare
BANCAL CONSTRUCTION AND SUPPLY
DOH-CLCHO-LHSD-SOP-02-00-FormiORev.0r .(