oe DAA ICI7 FPL UNC
KA GINEERING PLC
vent Evaluation
thodology
Req.no ET requi
10,000 litter fuel tanker requirement
22 Knock out
nders 6 ,inline/y-shape
your proposed
truck is whether inline or V shaped?
Merit point
1 of device
your proposal mentions that
‘ement is knockout while our
rit point.
Thus, please confirm to proceed with our |
requirement.
Tank earthling pin resistance Knock out
Less than Hohms
‘Question: please provide your response
for the requirement?
Audible warning buzzer Merit point
Shall be provide
Question: your proposal mention
the requirement is knockout whi
original spe 7
Thus, please confirm to proceed with our
requirement.
3 Sleeper cab
Optional
Question: please provide your response
for the require
Cigarette light
Not allowed
‘Question: your proposal mentions that
the requirement is merit point while our
iil specification is knockout, Thus, |
-ase confirm to proceed with our
requirement.
PO ex 11004 Addis Ababa Ethiopia eh s25TAT AGEL
mall kg c Direc
Bidders
response
INLINE
qv
ax +251-11-466-1709
ion: Gofa Mazoria, Addis Ababa Ethiopiaae DBA TIC 97 9.P. PT. UNC
K.G. ENGINEERING PLC
ese Merit point
Required
42 [Bumper (F-R) Manufacturer's current Knock out V
| Question: please provide your response
[torte requirement
61 | Material Knock out | v
| High tensile alloy steel plate | |
| sin pence pe age
for the requirement?
6622 | Tanker out let Kaoek out J
Shall be ited atthe dead bottom part of
the tanker for each compartment.
Question: please provide your response
| forthe requirement? |
Automatic slack adjuster Knock out v
| Shall he fitted
| Question: your proposal mentions that
the requirement is merit point while our
spe is knockout. Thus,
please confirm to proceed with our
requirement.
With best hy
Wf Atakilty
J “1G. Manager
‘Otiox 1164 Addis Ababa Ethiopia Tel #251-11-46611 24/23 Fax 9251-11-466-170
E-mail gen. oa Direction: Gofa Mazoria, Addis Ababa Ethiopia