You are on page 1of 2
oe DAA ICI7 FPL UNC KA GINEERING PLC vent Evaluation thodology Req.no ET requi 10,000 litter fuel tanker requirement 22 Knock out nders 6 ,inline/y-shape your proposed truck is whether inline or V shaped? Merit point 1 of device your proposal mentions that ‘ement is knockout while our rit point. Thus, please confirm to proceed with our | requirement. Tank earthling pin resistance Knock out Less than Hohms ‘Question: please provide your response for the requirement? Audible warning buzzer Merit point Shall be provide Question: your proposal mention the requirement is knockout whi original spe 7 Thus, please confirm to proceed with our requirement. 3 Sleeper cab Optional Question: please provide your response for the require Cigarette light Not allowed ‘Question: your proposal mentions that the requirement is merit point while our iil specification is knockout, Thus, | -ase confirm to proceed with our requirement. PO ex 11004 Addis Ababa Ethiopia eh s25TAT AGEL mall kg c Direc Bidders response INLINE qv ax +251-11-466-1709 ion: Gofa Mazoria, Addis Ababa Ethiopia ae DBA TIC 97 9.P. PT. UNC K.G. ENGINEERING PLC ese Merit point Required 42 [Bumper (F-R) Manufacturer's current Knock out V | Question: please provide your response [torte requirement 61 | Material Knock out | v | High tensile alloy steel plate | | | sin pence pe age for the requirement? 6622 | Tanker out let Kaoek out J Shall be ited atthe dead bottom part of the tanker for each compartment. Question: please provide your response | forthe requirement? | Automatic slack adjuster Knock out v | Shall he fitted | Question: your proposal mentions that the requirement is merit point while our spe is knockout. Thus, please confirm to proceed with our requirement. With best hy Wf Atakilty J “1G. Manager ‘Otiox 1164 Addis Ababa Ethiopia Tel #251-11-46611 24/23 Fax 9251-11-466-170 E-mail gen. oa Direction: Gofa Mazoria, Addis Ababa Ethiopia

You might also like