SCHEDULE - H
See Clauses10-1 (iv) and 19.3
Contract Price Weightages
1.1 The Contract Price for this Agreement is Rs. 632.52 Cr.
1.2 Proportions of the Contract Price for different stages of Construction of the Project,
Highway shall be as specified below:
Weightage in
teem | Pereentaget | Stage or Payment Percentage
Price
i 2 3 a
Road works ‘A- Widening and
including strengthening of existing road
culverts asst
‘widening and (1) Earthwork up wap ofthe
repair of subgrade NIL
calverts {2 Subase Course
NIL
(3) Non Bituminous Base
Course NIL
(4) Bituminous Base Course
(5) Wearing Coat NIL
Nit
(6) Widening and repair of
caer NIL
Bat Reconstruction New
lane realignment bypase
(Flexible pavement)
(1) Eantwork up oop ofthe
sub-grade 13.97%
(2) Sub Base Course 22.33%
(3) Non-Bituminous Base
Course 1193%
(8) Bituminous Base Course 130%
(5) Wearing Cost mn26%
5.2. Reconstretion! New &
lane reatignment
bypass(Rigid Pavement)
(1) Earthwork up wtp ofthe wi
subgrade
(2) Sub Base Course ‘NIL
G) Dry Lean Conerete(DLC) NIL
Course
(4) Pavement Quality Control NIL
(PQC) Course
C.1- Reconstruction” New
service road (Flexible
pavement)
22Item
Weightage in
percentage to
the Contract
Price
Stage for Payment
Percentage
weightage
2
3
(Earthwork up to top of the
subsgrade
(2)Sub Base Course
(3) Non-Bituminous Base
Course
(4) Bituminous Base Course
(5) Wearing Coat
C.2- Reconstruction! New
Service road (Rigid Pavement)
(1) Earthwork up to top ofthe
sub-grade
2) Sub Base Course
G) Dry Lean Conerete(DL)
Course
(4) Pavement Quality Control
(QC) Course
realignments,
bypasses:
Culverts (length _< 6m)
NIL
NIL
NIL
NIL,
10.87%
Bridges!
Underpasses!
Overpasses
21.85%
‘A.1- Widening and Repair of
‘Minor bridges (length > 6 m
and < 60 m)
‘Minor bridges
A.2- New Minor bridges
(length >6 and <60 m.)
(2) Foundation +Sub-Structure:
(On completion of the foundation
work including foundations for
‘wing and return walls,
abutments, piers upto the
abutment/pier cap.
2) Superstructure: On
completion of the super-
structure in all respects
including wearing coat,
bearings, expansion joints, hand
rails, erash harriers, road signs
& markings, tests on completion
etc. complete in all respect.
G) Diversion Road: On
completion of Diversion Road
and dismantling after
completion of New Bridge
NIL
17.36%
5.12%
NIL
23Item
Weightage in
percentage to
the Contract
Price
Stage for Payment
Percentage
weightage
2
3
4
‘works complete in all respect
and fit for use.
(4) Guide Bunds and River
Training Works:
On completion of Guide Bunds
and river Training Works
complete in all respects
B.1- Widening and Repair of
underpasses! overpasses
Underpasses’ Overpasses
B.2- New underpasses!
overpasses
(1) Foundation +Sub-Structure:
On completion of the foundation
work including foundations for
wing and return walls,
abutments, piers upto the
abutment/pier cap.
(2) Super-structure: On
completion of the super-
structure in all respects
including wearing coat,
bearings, expansion joints, hand
rails, crash barriers, road signs
& markings, tests on
completion ete. complete in all
respect.
‘Wearing Coat (a) in ease of
Overpass- wearing coat
including expansion joints
complete in all respects as
specified and (b) in case of
underpass- rigid pavement
including drainage facility
complete in all respects as
specified as specified
3) Approaches: On completion
of approaches including
Retaining walls’ Reinforced
Earth walls, stone pitching,
protection works complete in all
respect and fit for use.
1.05%
NIL
11.14%
7.92%
57.40%
Major
Bridge(length
> 60m.) works
19.68%
‘A.F- Widening and repairs of
‘Major Bridges
1) Foundation
NIL. 24Weightage in
percentage to Percentage
Kem the Contract Stage for Payment weightage
Price
1 2 3 4
and (@) Sub-structure NIL
ROB/RUB/ G) Super-structure (including NIL
elevated bearings)
sections/flyove (4) Wearing Coat including NIL
rs including expansion joints
viaduets if (5) Miscellaneous Items like NIL
any hand rails, crash barriers, road
markings etc.)
(6) Wing walls/return walls, NIL.
(7) Guide Bunds, River NIL
Training works etc.
(8) Approaches (including NIL
Retaining wals, stone pitching
and protection works)
A.2- New Major Bridges
(1) Foundation 10.41%
(2) Substructure 3.54%
G) Super-structure (including 729%
bearings)
(4) Wearing Coat including 0.75%
expansion joints
(5) Miscellaneous Items like 041%
hand rails, crash barriers, road
‘markings et.)
(6) Wing wallsireturn walls, NIL
(7) Guide Bunds, River NIL
Training works ete.
(8) Approaches (including 0.32%
Retaining walls, stone pitching
and protection works)
B.1- Widening and repair of
(a) ROB
(>) RUB
(1) Foundation
(2) Suib-structure NIL
G) Super-structure (including NIL
bearings) NIL
(4) Wearing Coat: (a) in case of
ROB- wearing coat including
expansion joints complete in all
respects as specified and (b) in NIL
case of RUB- rigid pavement
under RUB including drainage
facility complete in all respects
as specified as specified
(5) Miscellaneous Items like
hand rails, crash barriers, road NIL
‘markings etc.)
(6) Wing walls/return walls, NIL
7) Approaches (including
235Item
Weightage in
percentage to
the Contract
Price
Stage for Payment
Percentage
weightage
2
3
4
Retaining walls, stone pitching
and protection works)
B.2- New ROB/RUB
(@ROB
(b) RUB
(1) Foundation
(2) Sub-structure
G) Super-structure (including
bearings)
(4) Wearing Coat: (a) in case of
ROB- wearing coat including
expansion joints complete in all
respects as specified and (b) in
case of RUB- rigid pavement
under RUB including drainage
facility complete in all respects
as specified as specified.
(5) Miscellaneous Items like
hand rails, crash barriers, road
‘markings etc.)
(6) Wing walls/return walls,
(7) Approaches (including
Retaining walls/Reinforced
Earth wall, stone pitching and
protection works)
C.1- Widening and repair of
Elevated Section/Flyovers!
Grade Separators
(1) Foundation
(2) Sub-structure
G) Super-structure (including
bearings)
(4) Wearing Coat including
expansion joints
(5) Miscellaneous Items like
hand rails, crash barriers, road
markings et.)
(6) Wing walls/return walls,
(7) Approaches (including
Retaining walls/Reinforced
Earth wall, stone pitching and
protection works)
€.2.New Elevated
Seetion/Flyovers/ Grade
Separators
(1) Foundation
(2) Sub-structure
(G) Super-structure (ineluding
bearings)
NIL
6.22%
3.46%
20.57%
0.18%
0.44%
NIL
19.73%
NIL
NIL
NIL
NIL.
NIL
NIL
NIL.
237%
1.47%
2.83%
236Weightage in
percentage to Percentage
Kem the Contract Stage for Payment weightage
Price
1 2 3 4
(@ Wearing Coat including 032%
expansion joints
(5) Miscellaneous Items like 0.11%
hand rails, crash barriers, road
‘markings ete.)
(6) Wing walls/return walls NIL
(7) Approaches (including
Retaining walls/Reinforced 19.59%
Earth wall, stone pitching and
protection works)
‘Other works 12.93% | (i) Toll Plaza NIL
(i) Road side drains NIL
(iii) Road signs, markings, 5.53%
km stones, safety devices,
(iv) Project facilities
(a) Bus Bays 3.44%
(b) Truck lay-byes 474%
(Rest areas NIL
() Road side plantation NIL,
(vi) Repair of protection NIL
‘works other than approaches to NIL
the bridges, elevated sections! NIL
flyovers/grade separators and
ROBSRUBS.
(vii) Junctions (Major & °
Minor) 17.66%
(viii) ROW Fencing .
(ix) Metal Beam Crash re
Barrier & RCC Crash Barrier
for Road Safety. eee
(x) Embankment Slope 5
Protection with Stone Pitching 22.98%
1.78% Utility Shifting 100%