dO 2) Qpco INFRATECH PVT.LTD. LeNo. APCOISC?2024.28/001 Dated: 4° April, 2028 To ‘The Authorized Signatory MCCS Infra Pvt. Lt, Subject: - Scope of backfiling of sustres regarding, Refi 1, Contract Agreement dated 27-Nov-2024 2 Amendment to Contract Agreement dated 22-Mar-2024, ‘3. Meeting held at APCO Janne Site fie on 01.04.2024, Dear Sir ‘With reference to above cited subjest and meeting held on 01.08.2024 with Direstrs af APCO & MCCS, we are writing to you regarding the Contact Agreement dated 27 November 2023, and subsequent Amendment to Contract Agreement dated 22 March 2024, pening tothe scope of backfling ad ‘embankment work, [As per the recent amendment, i has been agreed that FDD (Field Density Test) using a suitable method sal be jointly ensured bythe both pies forthe fling work completed up o 21 March 2024. fective ‘om 22 March 2024 onwards, layer ise RFT (Request for Inspection) shal be raised forthe backfilling works per MoRT&H specifications. ‘The reduced levels have been attached (Annexure) herewith upto (Top levels of Footing Pedestals Le, Bottom Level of Pie Shafv Natural Ground Level whichever les) which the bacfilig shall be executed and the MCCS can do the needling forthe convenieneof pepe cap shuterin by their own cos. Further, itis informed that any backfiling required other than mentioned above then shoud be discussed ‘and ovsed accordingly. Its also informed that further excavation forthe connecting road isnot within your scope. I there are ny requirement fr such activities, iwi be communicated to you sceordingy ‘Tiss for your kind information and further necesary ation. ‘Thanks & Regards Enel-as above ‘ower 000 au, 83 Yan ek, oath em evn al oaaced Cos arse eatne ee AST Ee ee 2 Pt "749,000 . [na mm (SEES | | ‘drawing issued & maoven eu a | a == 4 a = : +38 3 fe a a —S2 a 38 : 7 —_|—-= Rss wes [a — so (miapucT) Pat (855.100 L * 2 | esn00 | |S 3 | weet | — ara

You might also like