Case N-508-2
Rotation of Serviced Snubbers and Pressure
Reliet Valves for the Purpose of Testing
Section XI, Division 1
Inguiry: What alternative rules to those stated in
TWA.4000 (TWA-7000 for Editions and Addenda prior
to the 1991 Addenda) may be used when, for the
purpose of testing, snubbers and pressure relief valves
are rotated from stock and installed on components
(including piping systems) within the Section XI
boundary?
Reply: It is the opinion of the Committe: that, as
‘an alternative to the provisions of IWA-4000 (IWA-7000
for Editions and Addenda prior to the 1991 Addende)
‘and for the purpose of testing, snubbers and relief
valves may be rotated from stock and installed on
components (including piping systems) within the See-
tion XI boundary provided the following requirements
are met:
(a) Items being removed and installed shall be of
the same design and construction;
(2) Tiems being removed shall have no evidence of
failure at the time of removal;
{c) Items being rotated shail be removed and installed
only by mechanical means;
(d) Items being installed shall previously have been
in service;
(e) Preservice inspections shall be performed as re-
quired by TWA-4000 (IWA-7000 for Eiitions and Ad-
denda prior to the 1991 Addenda);
(7 The Owner shall maintain a method of tracking
the items to ensure traceability of inservice inspection
and testing records;
(g) Use of an NIS-2 forin is not required except as
provided in (i) below;
(A) Testing of removed snubbers and pressure relief
valves, including required sample expansions, shall be
performed in accordance with the Ovmer’s test program:
(i) Repair or replacement of removed items, when
required, shall be performed in accordane with
TWA-4000 (IWA-4000 or IWA-7000 for Editions and
‘Addenda prior to the 1991 Addenda),
685 ‘SUPP. 1-NC