You are on page 1of 21

28/11/23

Imran
Banuka
Isuru
Rashmika
Rajitha
Widusha

29/12/23
Imran
Banuka
Rashmika
Rajitha
Widusha

30/12/23

Imran
Banuka
Rashmika
Isuru
Rajitha
Widusha
09/01/2024
Tuesday
PJ115
8.30 AM to 5 PM

Imran @ Office
Banuka @ Office
Widusha
Rajitha
Isuru (12-5 Tharindu's work)
Rashmika

YB Conveyor assembling
Workshop clean
Auto Feeding method solution finding
Cable tray designing and material purchasing

10/01/2024
Wednesday
PJ115
8.30 AM to 4 PM

Imran
Banuka
Isuru
Rashmika
Rajitha

Cable tray fabrication


Testing the autofeeding method

11/01/2024
Thursday
PJ115
7 AM to 5 PM

Imran (Out 8 PM)


Banuka
Isuru
Rashmika
Rajitha

Site cleaning for epoxy


Desiging the Huake mechanism for Autofeeding
Cable tray fabrication

12/01/2024
Friday
PJ115
7 AM to 5.30 PM

Imran
Banuka
Isuru
Rashmika
Rajitha (Cable tray fabrication supervising & Hirushan's work)
Hirushan (Out 4 PM)

Finalizing autofeeding method to get approval


Cable tray fabrication

13/01/2024
Saturday
PJ115
8.30 AM to 5 PM

Imran (Exhibition Visit)


Banuka (Exhibition Visit)
Isuru
Rashmika

Cable tray fabrication

14/01/2024
Sunday
No-one
09/01/2024
Tuesday
PJ115
8.30 AM to 5 PM

Imran @ Office
Banuka @ Office
Widusha
Rajitha
Isuru (12-5 Tharindu's work)
Rashmika

YB Conveyor assembling
Workshop clean
Auto Feeding method solution finding
Cable tray designing and material purchasing

10/01/2024
Wednesday
PJ115
8.30 AM to 4 PM (Stopped for the match)

Imran
Banuka
Isuru
Rashmika
Rajitha

Cable tray fabrication


Testing the autofeeding method

11/01/2024
Thursday
PJ115
7 AM to 5 PM

Imran (Out 8 PM)


Banuka
Isuru
Rashmika
Rajitha

Site cleaning for epoxy


Desiging the Huake mechanism for Autofeeding
Cable tray fabrication

12/01/2024
Friday
PJ115
7 AM to 5.30 PM

Imran
Banuka (Out 12 PM)
Isuru
Rashmika
Rajitha (Cable tray fabrication supervising & Hirushan's work)
Hirushan (Out 4 PM)

Finalizing autofeeding method to get approval


Cable tray fabrication

13/01/2024
Saturday
PJ115
8.30 AM to 5 PM

Imran (Exhibition Visit)


Banuka (Exhibition Visit)
Isuru
Rashmika

Cable tray fabrication

14/01/2024
Sunday
No-one

29/02/2024
Thursday
8.30 AM to 7.00 PM

Imran (In 10.30 am)


Hirushan
Akesh
Isuru
Pruthuwinda (In 10.30 am)

PLC programming for the Auto Feeding


Box bar unloading
Designing the Autofeeding for another Huake machines
Flexi conveyor height adjustment
Fixing transfer plates in the Flexi conveyor
Fabricating the structure for the auto feeding

Tools:
Grinder
Welding Plant

01/03/2024
Friday
Imran
Hirushan
Pruthuwinda
Rajitha
Akesh
Isuru
Rashmika
02/03/2024
Saturday
PJ115
8.30 AM to 1 PM
Imran
Akesh
Rashmika

Auto Feeding Frame Grinding and Applying Primary coating


Guide designing for the existing auto feeding

03/03/2024
Sunday
Pruthuwinda
9.30 AM to 4.30 PM

Checking the servo with encoder


Checking the servo with pulse - Research, Testing

04/03/2024
Monday
8.30 AM to 5.00 PM
Imran (& Offsite [Design] 11 PM to 4.30 AM)
Pruthuwinda
Rajitha
Akesh
Isuru
Rashmika

Cylinder Mounting Modification in Design


Design updating for H1 and H3
Cleaning the side
Moving YAWA parts to the workshop
Check the servo motor with pulse - research

05/03/2024
Tuesday
8.30 AM to 5.00 PM
Imran (Onsite 10.30 AM to 4 PM) (Offsite [Design] 10 PM to 12.00 AM)
Hirushan
Pruthuwinda
Rajitha (Hiru Ayya's work)
Akesh
Isuru
Rashmika

Check the servo motor with pulse testing


Cleaning the side
Design updating for H1 and H3
Planning and the getting dimension for wiring the Multicore for H1 and H3 Auto Feeding
Sending the 2D parts fo fabrication

08/03/2024
Friday
8.30 AM to 5.30 PM
PJ115
Imran
Hirushan
Pruthuwinda
Akesh
Rashmika
Isuru

Finalizing and Sending the 2D parts to fabrication in Kushan


Following the laser cutting and bending works in Kushan
Purchasing the Nut and bolts
Nose end conveyor modification
Testing Servo with DDRVA Block for Auto Feeding

09/03/2024
Saturday
8.30 AM to 8.15 PM
PJ115
Imran
Hirushan
Pruthuwinda (9 AM to 4 PM)
Akesh
Rashmika
Isuru

Nose end modification


YH conveyor modification
Wiring the nose end conveyor motors
Make sequences for the process of auto feeding
Testing the Servo with Pulse Train Mode for Auto Feeding

10/03/2024
Sunday
8.30 AM to 6.30 PM
PJ115
Imran
Hirushan
Pruthuwinda
Weranga (In 3 PM)
Akesh
Rashmika
Isuru

Cable tray end capping


Cable tray paint touch up
Nose end modification
YH conveyor modification
Drilling the holes on the Huake 1 to place the Auto Feeding
Testing the maxiumum speed of the the servo motor for Auto Feeding

11/03/2024
Monday
8.30 AM to 5.30 PM
PJ115
Imran
Pruthuwinda (9.30 AM to 1.30 AM)
Weranga (9.30 AM to 1.30 AM)
Akesh
Rashmika
Isuru

Manking CSK machining for the Auto Feeding parts H1, H3


Applying Primary paint for the Auto feeding parts of H1, H3
Positioning the Huake 3
Adjusting the YB for Auto Feeding
Drilling the holes on the Huake 1 to place the Auto Feeding
Tapping the holes
Placing the order of bearing and shaft at Sada Sarana
Purchasing and transporting from Sada Sarana to Godagama

12/03/2024
Tuesday
8.30 AM to 5.20 PM
PJ115
Imran
Pruthuwinda
Akesh
Rashmika
Isuru

Designing the Auto Feeding method for Jornen Machine


Adjusting and fixing the YB for Auto Feeding
Packing the Auto feeding for transporting
Getting gate pass to transporting the auto feeding unit from Ranala CBL to Pannipitiya CBL
Prepare and sending the the BOQ for existing Auto Feeding unit
15/03/2024
Friday
PJ115
Imran (10 AM to 7 PM) - Pannipitiya & Ranala
Pruthuwinda (8.30 AM to 5.30 PM) - Pannipitiya

Testing the servo with DDRVI block


Checking and troubleshooting the servo issues
Checking the pitch and base revolution of the servo
Designing the space plate for Huake 1, Huake 3

16/03/2024
Saturday
PJ115
Imran (1 PM -
Pruthuwinda

18/03/2024
Monday
PJ115
8.30 AM to 5.30 PM
Imran
Pruthuwinda

*Transporting the shafts from Kushan Engineering to CBL Ranala


*Transporting the Delta motor and its component from CBL Ranala to CBL Pannipitiya
*Visiting CBL Ranala to remove the I/O cable of servo from Huake machine
*Transporting the I/O cable from CBL Ranala to CBL Pannipitiya
*Visiting Kottawa to find the gear box for the servo

19/03/2024
Tuesday
PJ115
8.30 AM to 5.45 PM
Imran
Pruthuwinda

*Soldering the I/O Cable


*Studying about the delta servo
*Servo motor vibration problem solution finding and solving
*Setting the parameters for the servo motor

20/03/2024
Wednesday
PJ115
8.30 AM to 5.50 PM
Imran
Pruthuwinda

*Soldering with extended wires with I/O socket


*Changing the parameters of the servo motor
*Fixing the components to the autofeeding unit
*Testing the motor with sample program
*Removing the components from the autofeeding unit
21/03/2024
Thursday
PJ115
8.30 AM to 5.40 PM
Imran
Pruthuwinda

*Adjusting the servo motor parameters and observing the behaviour of the servo
*Applying gear ratio in servo parameters based on the resuts obtained
*Testing the servo with variable pulses

25/03/2024
Monday
PJ115
8.30 AM to 8.15 PM
Imran
Pruthuwinda (Out 5.30 PM)

*Designing the Adjustment plate for the Shaft in Auto Feeding System
*Sending the 2d for fabrication
*Trasportig the parts from Kushan to CBL Pannipitiya
*Servo, System Vibration problem solved
*Starting the real programming for PLC

26/03/2024
Tuesday
PJ115
8.30 AM to 7.30 PM
Imran
Pruthuwinda (Out 5.30 PM)
Akesh (Out 5.30 PM)

*Drilling the holes in auto feeding main plate both side


*Shaft adjustment in auto feeding
*Fixing the adjusting plate
*Visiting CBL Ranala
*Updating the flexi design [Kendy to Diversion] based on the requirement of Mr. Piumal
*Sending the base plates and C channel 2d drawing to Kushan
*Visiting Kushan to collect the parts

27/03/2024
Wednesday
PJ115
8.30 AM to 6 PM
Imran
Pruthuwinda
Isuru (Out 5)
Akesh (Out 5)
Rashmika (Out 5)

*Visiting Kushan to collect the parts


*Parts transport from Kushan to CBL Pannipiya
*Updating the flexi design [Kendy to Diversion] based on the requirement of Mr. Piumal
*Testing the Auto Feeding with real program
*Troubleshooting the problems in the program
*Getting the Gate pass for transport
*Packaging all the coponents
*Transports all the auto feeding parts and unit from CBL Pannipitiya to CBL Ranala
*Placing and fixig the auto feeding unit with the Huake machine
*Test the autofeeding with the Huake
*Finding the problems of sequence which occured in the program
*Fabricating Auto Feeding Structure for Jornen

28/03/2024
Thursday
PJ115
8.30 AM to 7.15 PM
Imran
Pruthuwinda (Out 6 PM)
Akesh (Out 6 PM)
Hirushan (Out 4 PM)

*Updating the flexi design [Kendy to Diversion] based on the requirement of Mr. Piumal
*Commisioning the Auto Feeding Unit
*Planning and discussing about existing system modification with Mr. Piumal
*Designing the Guides plates for the autofeeding unit
*Sending the 2d drawings to Kushan for the Fabrication

29/03/2024
Friday
PJ115
8.00 AM to 10.15 PM
Imran
30/03/2024

31/03/2024

01/04/2024

02/04/2024

03/04/2024

04/04/2024
Thursday
PJ115

05/04/2024
Friday
PJ115
8.30 AM to 5.30 PM
Pruwthuwinda

Correcting the errors in the programming