TOTAL
4" thick wall
1 6.00 1.00 10.00
deduct d1 -1 3.00 1.00 7.00
1 7.42 1.00 10.00
2 5.42 1.00 10.00
deduct d2 -1 2.50 1.00 7.00
1 6.75 1.00 10.00
1 4.42 1.00 10.00
1 2.17 1.00 10.00
1 2.33 1.00 10.00
1 6.00 1.00 10.00
1 9.17 1.00 10.00
1 9.25 1.00 10.00
deduct w5 -1 3.00 1.00 6.00
deduct w6 -1 2.00 1.00 6.00
1 12.50 1.00 10.00
1 8.58 1.00 10.00
2 6.33 1.00 10.00
1 1.83 1.00 10.00
deduct d2 -1 2.50 1.00 7.00
1 2.08 1.00 10.00
1 6.83 1.00 10.00
1 14.50 1.00 10.00
1 3.92 1.00 10.00
1 3.42 1.00 10.00
1 7.92 1.00 10.00
1 15.75 1.00 10.00
1 8.58 1.00 10.00
1 4.50 1.00 10.00
deduct d2 -1 2.50 1.00 7.00
1 10.25 1.00 10.00
deduct d1 -1 3.00 1.00 7.00
1 4.50 1.00 10.00
deduct d2 -1 2.50 1.00 7.00
1 37.92 1.00 3.33
1 56.75 1.00 3.33
1 33.08 1.00 3.33
1 23.17 1.00 3.33
1 18.08 1.00 3.33
TOTAL
ii WATERPROOFING WORK SQFT
BASEMENT
FLOORING 1 1189.39 1.00 1.00
WALL 1 25.00 10.67 1.00
1 20.08 10.67 1.00
1 3.17 10.67 1.00
1 14.67 10.67 1.00
1 5.08 10.67 1.00
1 27.00 10.67 1.00
1 15.33 10.67 1.00
TOTAL
TOTAL
RCC WORK FOR SILL AND LINTEL BAND 1 169.00 0.33 0.25
TOTAL
TOTAL
TOTAL
GRAND TOTAL FLOORING TILES
KITCHEN GRANITE 1 34.79 1.00 1.00
WOODEN FLOORING
TOTAL
GRANITE IN WINDOW SILL
D1 17 3.00 0.58 1.00
D2 26 2.50 0.58 1.00
W1 4 7.00 0.58 1.00
W2 4 7.00 0.58 1.00
W3 4 6.00 0.58 1.00
W4 21 4.00 0.58 1.00
W5 22 3.00 0.58 1.00
W6 4 2.00 0.58 1.00
W7 10 1.75 0.58 1.00
SD1 4 10.00 0.58 1.00
SD2 4 7.00 0.58 1.00
TOTAL
METAL WORK
TRUSS WORK RFT
3"*3" SQ. HOLLOW PIPE 4 23.98 1.00 1.00
3"*1.5" SQ. HOLLOW PIPE 7 29.00 1.00 1.00
3"*3" SQ. PIPE FOR POST 10 8.00 1.00 1.00
TOTAL
BOUNDARY WALL
BRICKWORK SQFT 1 35.25 6.00 1.00
1 11.68 6.00 1.00
1 12.68 6.00 1.00
1 4.08 6.00 1.00
1 2.68 6.00 1.00
1 36.75 6.00 1.00
1 41.00 6.00 1.00
1 28.33 6.00 1.00
1 19.08 6.00 1.00
1 15.00 6.00 1.00
1 55.00 6.00 1.00
1 5.67 6.00 1.00
TOTAL 267.20
RCC WORK FOR SILL AND LINTEL BANDS CFT 2 267.20 0.75 0.25
TOTAL
MANHOLE
BRICKWORK SQFT 4 1.50 1.50 1.50
SOAKPIT L.S 2
170.00
-48.00
141.70
-42.00
107.50
-21.00
145.00
-60.00
239.20
-48.00
-18.00
99.20
-36.00
113.30
-24.00
102.50
-42.00
31.70
-15.61
94.20
57.50
-15.61
40.80
-18.00
107.50
35.00
275.00
1371.88
60.00
-21.00
74.20
108.40
-17.50
67.50
44.20
21.70
23.30
60.00
91.70
92.50
-18.00
-12.00
125.00
85.80
126.60
18.30
-17.50
20.80
68.30
145.00
39.20
34.20
79.20
157.50
85.80
45.00
-17.50
102.50
-21.00
45.00
-17.50
126.40
188.98
110.16
77.16
60.21
2242.60
1189.39
266.75
214.25
33.82
156.53
54.20
288.09
163.57
2366.61
35.00
38.75
44.94
48.00
47.67
67.43
71.25
49.00
54.25
57.19
56.00
63.56
29.19
110.83
773.06
75.84
113.50
66.16
46.34
36.16
14.08
1694.22
338.00
618.86
474.82
103.14
133.38
108.41
233.03
612.03
241.78
345.07
2870.51
340.00
-48.00
283.40
-84.00
215.00
-42.00
290.00
-120.00
478.40
-48.00
-36.00
198.40
-36.00
226.60
-48.00
205.00
-84.00
63.40
-31.22
188.40
115.00
-31.22
81.60
-36.00
215.00
70.00
550.00
120.00
-42.00
148.40
108.40
-35.00
135.00
88.40
43.40
46.60
120.00
183.40
185.00
-36.00
-24.00
250.00
171.60
126.60
36.60
-35.00
41.60
136.60
290.00
78.40
68.40
158.40
315.00
171.60
90.00
-35.00
205.00
-42.00
90.00
-35.00
252.80
377.96
220.31
154.31
120.41
7125.95
1443.60
154.95
678.59
446.41
406.29
80.19
1766.43
1795.77
1443.60
16707.20
18150.80
313.26
1738.77
35.00
48.00
38.75
44.94
166.69
164.04
-17.50
-18.00
153.00
-12.00
-17.50
168.00
-17.50
-12.00
210.00
-18.00
-17.50
565.04
1572.09
34.79
34.79
29.75
37.92
16.33
16.33
14.00
49.00
38.50
4.67
10.21
23.33
16.33
256.38
14.58
149.94
191.10
355.62
357.00
455.00
168.00
84.00
96.00
504.00
396.00
48.00
157.15
2265.15
240.00
168.00
408.00
95.92
203.00
80.00
378.92
695.42
93.33
93.33
6.67
193.33
112.00
126.27
188.98
110.16
77.16
60.21
121.07
215.60
208.93
126.47
188.98
60.21
79.85
96.57
186.67
119.88
111.09
2078.09
255.00 95.875
78.00
333.00
273.89
30.43
30.43
30.43
91.30
1000.00
200.00
300.00
300.00
13.50
409.97
175.70
66.58
16.16
33.91
30.88
166.68
32.22
821.16
1753.25
9682.37
BALUWATAR APARTMENT REMAINING WORK ESTIMATE
SN DESCRIPTION OF WORK UNIT QUANTITY RATE
A CIVIL WORKS
i RCC Work CFT
Columns 585.67 570
Beams 1167.58 570
Slab 821.16 570
i BRICKWORK SQFT
9" THICK WALL 7544.89 465
4" THICK WALL 8970.39 325
C METAL WORKS
i TRUSS RFT
a. 3"*3" SQ PIPE 175.92
b. 3"*1.5" SQ PIPE 203.00
ii. TOUGHEN GLASS IN PERGOLA DESIGN TRUSS SQFT 695.42
iii. TOUGHEN GLASS FOR STAIRCASE SQFT 193.33
iv. METAL GATE SQFT 112.00
v. RAILING WORK SQFT 2345.28
vi. TANK STAND LADDER LS 1.00
E WASTE MANAGEMENT
a. SEPTIC TANK
i. BRICKWORK SQFT 333.00
ii PLASTERWORK SQFT 333.00
iii PUNNING WORK SQFT 350.88
iv WATER PROOFING SQFT 91.30
b. SOAK PIT SQFT 273.89
c. MANHOLE SQFT
d. SEWER LINE
e. GREASE TRAPS
f. SUMP PUMP
F ELECTRICAL
i POWER DISTRIBUTION SYSTEM
ii WIRING AND CONDUITS
iii ELECTRICAL OUTLETS AND SWITCHES
333831.33
665523.24
468060.25
1694414.62
3508372.30
2915375.32
4120083.02
2102703.54
2102703.54
10305.09
18150.80
235148.15
318749.51
6288.34
666.74
2260.16
139.16
256.38
355.62
2265.15
408.00
0.00
0.00
0.00
175.92
203.00
695.42
193.33
112.00 `
2345.28
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
333.00
333.00
350.88
91.30
273.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1603.18
534.39
1603.18
0.00
0.00
200.00
300.00
300.00
300.00
0.00
0.00
0.00
0.00
0.00